2003 NISSAN TEANA Radiator

[x] Cancel search: Radiator

Page 2980 of 3502

NISSAN TEANA 2003  Service Manual MA-2 PCV VALVE VENTILATION HOSE ...................... 34
Checking EVAP Vapor Lines  .................................. 34
CHASSIS AND BODY MAINTENANCE  ................... 35
Checking Exhaust System

Page 2981 of 3502

NISSAN TEANA 2003  Service Manual PREPARATION
MA-3
C
D
E
F
G
H
I
J
K
MA
B
MA
 
PREPARATIONPFP:00002
Special Service ToolsBLS0005B
Commercial Service ToolsBLS0005C
Tool number
Tool nameDescription
EG17650301
Radiator cap tester adapter

Page 2982 of 3502

NISSAN TEANA 2003  Service Manual MA-4
DESCRIPTION
 
DESCRIPTIONPFP:00000
Pre-Delivery Inspection ItemsBLS0005D
Shown below are Pre-delivery Inspection Items required for the new vehicle. It is recommended that
necessary items other t

Page 2993 of 3502

NISSAN TEANA 2003  Service Manual RECOMMENDED FLUIDS AND LUBRICANTS
MA-15
C
D
E
F
G
H
I
J
K
MA
B
MA
 
SAE Viscosity NumberBLS0009D
GASOLINE ENGINE
5W-30 is preferable.
If 5W-30 is not available, select the viscosity, from the chart,

Page 2994 of 3502

NISSAN TEANA 2003  Service Manual MA-16
ENGINE MAINTENANCE (QR20DE)
 
ENGINE MAINTENANCE (QR20DE)PFP:00100
Checking Drive BeltsBLS00090
WARNING:
Be sure to perform this step when the engine is stopped.
Make sure that the indicator (n

Page 2995 of 3502

NISSAN TEANA 2003  Service Manual ENGINE MAINTENANCE (QR20DE)
MA-17
C
D
E
F
G
H
I
J
K
MA
B
MA
 
When drain all of engine coolant in the system, open water drain plug on engine cylinder block.
Refer to EM-81, "
CYLINDER BLOCK" .
3. Rem

Page 2996 of 3502

NISSAN TEANA 2003  Service Manual MA-18
ENGINE MAINTENANCE (QR20DE)
 
8. Warm up until opening thermostat and water control valve. Standard for warming-up time is approximately
10 minutes at 3,000 rpm.
Make sure thermostat opening co

Page 2997 of 3502

NISSAN TEANA 2003  Service Manual ENGINE MAINTENANCE (QR20DE)
MA-19
C
D
E
F
G
H
I
J
K
MA
B
MA
 
Wrap a thick cloth around radiator cap and carefully remove the cap. First, turn the cap a quarter
of a turn to release built-up pressure