Page 3342 of 4500
Fig. 62: Identifying Seal Packing
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
101.INSTALL GENERATOR ASSY (See REPLACEMENT
)
102.INSTALL STARTER ASSY (See REPLACEMENT
)
103.INSTALL INTAKE MANIFOLD ASSY
a. Place 2 new gaskets on the cylinder heads with the white mark facing outward.
Page 3347 of 4500
n. Connect the VSV connector for EVAP.
Fig. 67: Identifying VSV Connector For EVAP
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
104.INSTALL THROTTLE BODY ASSY (See REPLACEMENT
)
105.REMOVE ENGINE STAND
106.INSTALL DRIVE PLATE & RING GEAR SUB-ASSY
HINT:
The mounting bolts are tightened in 2 progressive steps (step (c) and (e)).
If any one of the mounting bolts is broken or deformed, replace it.
a. Apply adhesive to 2 or 3 threads of the mounting bolt end.
Adhesive:
Part No. 08833-00070, THREE BOND 1324 or equivalent
Page 3357 of 4500
Fig. 77: Installing Power Steering Gear Housing Assy
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
114.INSTALL HEIGHT CONTROL SENSOR LINK SUB-ASSY FRONT (See REPLACEMENT
)
115.INSTALL PNEUMATIC FRONT RH W/SHOCK ABSORBER CYLINDER ASSY (See
REPLACEMENT
)
116.INSTALL PNEUMATIC FRONT LH W/SHOCK ABSORBER CYLINDER ASSY (See
REPLACEMENT
)
117.INSTALL FRONT SUSPENSION UPPER ARM ASSY RH (See REPLACEMENT
)
118.INSTALL FRONT SUSPENSION UPPER ARM ASSY LH (See REPLACEMENT
)
119.INSTALL FRONT DISC BRAKE CYLINDER ASSY RH (See OVERHAUL
)
120.INSTALL DISC BRAKE CYLINDER ASSY LH (See OVERHAUL
)
121.INSTALL STEERING SLIDING W/ SHAFT YOKE SUB-ASSY
a. Tighten the 2 bolts for sliding yoke.
Torque: 35 N.m (357 kgf.cm, 26 ft.lbf)
Page 3358 of 4500
Fig. 78: Installing Steering Sliding W/ Shaft Yoke Sub-Assy
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
122.INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSY
123.INSTALL PROPELLER W/ CENTER BEARING SHAFT ASSY (See OVERHAUL
)
124.INSTALL PARKING BRAKE CABLE HEAT INSULATOR
125.INSTALL FRONT FLOOR HEAT INSULATOR NO.1
126.INSTALL W/ CATALYST CONVERTER ASSY
127.INSTALL EXHAUST PIPE ASSY (See REPLACEMENT
)
128.INSTALL FRONT FLOOR BRACE CENTER
129.INSTALL COOLER COMPRESSOR ASSY
a. Install the cooler compressor, stay and wire bracket with the 3 bolts and nut.
Torque:
49 N.m (500 kgf.cm, 36 ft.lbf) for bolt
29 N.m (296 kgf.cm, 21 ft.lbf) for nut
b. Connect the compressor connector.
c. Install the wire clamp.
Page 3360 of 4500
Fig. 80: Installing Vane Pump Assy
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
131.INSTALL VANE PUMP OIL RESERVOIR ASSY
132.CONNECT HEATER WATER OUTLET HOSE A (FROM HEATER UNIT)
133.CONNECT HEATER WATER INLET HOSE A
134.CONNECT FUEL VAPOR FEED HOSE NO.2
135.CONNECT AIR HOSE NO.5
136.CONNECT ENGINE WIRE
a. Connect the engine wire from the ECM box.
b. Install the nut, and connect the generator wire to the generator.
c. Connect the wire for generator wire to the wire clamp on generator.
d. Connect the ground cable to the stay on generator with the bolt.
e. Connect the PS oil hose to the No. 1 oil pan with the 2 bolts.
f. Connect the ground strap to the body with the 2 bolts.
137.INSTALL FAN AND GENERATOR V BELT (See REPLACEMENT
)
138.CONNECT FUEL PIPE SUB-ASSY NO.2 (See REPLACEMENT
)
139.INSTALL RADIATOR ASSY (See REPLACEMENT
)
Page 3361 of 4500

140.INSTALL ENGINE UNDER COVER NO.2
141.INSTALL ENGINE UNDER COVER NO.1
142.INSTALL FRONT WHEEL
143.INSTALL AIR CLEANER ASSY
144.INSTALL INTAKE AIR CONNECTOR PIPE
145.INSTALL AIR CLEANER INLET NO.1
146.INSTALL V-BANK COVER
147.INSTALL HOOD SUB-ASSY (See ADJUSTMENT
and OVERHAUL )
148.CONNECT BATTERY NEGATIVE TERMINAL
149.ADD AUTOMATIC TRANSMISSION FLUID
150.ADD ENGINE COOLANT (See REPLACEMENT
)
151.ADD ENGINE OIL (See ON
-VEHICLE INSPECTION )
152.ADD POWER STEERING FLUID
153.BLEED POWER STEERING FLUID
154.INSPECT AUTOMATIC TRANSMISSION FLUID (See ADJUSTMENT
)
155.INSPECT ENGINE OIL LEAKS
156.CHECK FOR ENGINE COOLANT LEAKS
157.INSPECT FOR FUEL LEAKS
158.CHECK FOR EXHAUST GAS LEAKS
159.INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
160.INSPECT IGNITION TIMING
161.INSPECT ENGINE IDLE SPEED
162.INSPECT CO/HC
163.ADJUST ENGINE (See INSPECTION
)
164.CHECK ABS SPEED SENSOR SIGNAL (See TEST MODE PROCEDURE
)
OVERHAUL
1.REMOVE SPARK PLUG
2.REMOVE OIL FILLER CAP SUB-ASSY
3.REMOVE CYLINDER HEAD COVER SUB-ASSY LH
a. Remove the 9 bolts, 9 seal washers, cylinder head cover and gasket.
4.REMOVE CYLINDER HEAD COVER SUB-ASSY
a. Remove the 9 bolts, 9 seal washers, c
ylinder head cover and gasket.
Page 3391 of 4500
Fig. 110: Lifting Cylinder Head From Dowels
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
33.REMOVE WATER PUMP ASSY
a. Remove the 5 bolts, 2 stud bolts and nut, water pump and gasket.
34.REMOVE OIL PAN SUB-ASSY NO.2 (See REPLACEMENT
)
35.REMOVE OIL PAN BAFFLE PLATE
a. Remove the 3 bolts, 2 nuts and baffle plate.
36.REMOVE OIL PAN SUB-ASSY (See REPLACEMENT
)
37.REMOVE OIL STRAINER SUB-ASSY
a. Remove the bolt, 2 nuts, oil strainer and gasket.
38.REMOVE OIL PUMP ASSY (See REPLACEMENT
)
39.REMOVE ENGINE REAR OIL SEAL RETAINER
a. Remove the 7 bolts.
b. Using a screwdriver, remove the oil seal retainer by prying the portions between the oil seal
retainer and crankshaft bearing cap.
c. Remove the O-ring.
Page 3415 of 4500
Fig. 134: Installing O-Ring To Cylinder Block
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
53.INSTALL OIL PUMP ASSY (See REPLACEMENT
)
54.INSTALL OIL STRAINER SUB-ASSY (See REPLACEMENT
)
55.INSTALL OIL PAN STUD BOLT