2002 JEEP GRAND CHEROKEE Workshop Manual

Page 345 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) After about three minutes, the high-amperage
IOD reading on the multi-meter should become very
low or nonexistent, depending upon the electrical
equipment in the vehicle. If the amperage reading
r

Page 346 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual REMOVAL
(1) Turn the ignition switch to the Off position. Be
certain that all electrical accessories are turned off.
(2) Loosen the battery negative cable terminal
clamp pinch-bolt hex nut.
(3) Discon

Page 347 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Reconnect the battery positive cable terminal
clamp to the battery positive terminal post. Tighten
the terminal clamp pinch-bolt hex nut to 6.8 N´m (60
in. lbs.).
(6) Reconnect the battery negati

Page 348 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Position the battery hold down bracket over the
ledge on the inboard side of the battery case in the
battery tray and support unit. Be certain that the
ledge on the bottom of the hold down bracket

Page 349 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The battery cables (Fig. 17) or (Fig. 18) are large
gauge, stranded copper wires sheathed within a
heavy plastic or synthetic rubber insulating jacket.
The wire used in the battery cables combines exc

Page 350 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (1) Connect the positive lead of the voltmeter to
the battery negative terminal post. Connect the neg-
ative lead of the voltmeter to the battery negative
cable terminal clamp (Fig. 19). Rotate and ho

Page 351 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (4) Loosen the battery positive cable terminal
clamp pinch-bolt hex nut.
(5) Disconnect the battery positive cable terminal
clamp from the battery positive terminal post. If nec-
essary, use a battery

Page 352 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Install and tighten the nut that secures the
battery positive cable eyelet terminal to the B(+) ter-
minal stud on the starter solenoid. Tighten the nut to
11.3 N´m (100 in. lbs.).
(6) Install an