2001 CHRYSLER VOYAGER battery

[x] Cancel search: battery

Page 2813 of 4284

CHRYSLER VOYAGER 2001  Service Manual INSPECTION
Clean each lifter assembly in cleaning solvent to
remove all varnish and sludge deposits. Inspect for
indications of scuffing on the side and base of each
lifter body.
INSTALLATION
(1) Inst

Page 2818 of 4284

CHRYSLER VOYAGER 2001  Service Manual (8) Fit the liners in the crankcase making sure
that the shim is positioned correctly in the seat. Lock
the liners in position using special tool (VM.1076)
and bolts (Fig. 45). Clean the residual LOCT

Page 2819 of 4284

CHRYSLER VOYAGER 2001  Service Manual (4) Install front crankshaft hub. Torque bolt to
304N´m.
(5) Install timing belt inner cover (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
COVER(S) - INSTALLATION).
(6) Install timing belt (R

Page 2820 of 4284

CHRYSLER VOYAGER 2001  Service Manual cylinder bore. Check gap with feeler gauge (Fig. 49).
Top compression ring gap .30 to .45mm (.0118 to
.0177 in.). Second compression ring gap .30 to .45mm
(.0118 to .0177 in.). Oil control ring gap .2

Page 2824 of 4284

CHRYSLER VOYAGER 2001  Service Manual (8) Install cylinder head (Refer to 9 - ENGINE/
CYLINDER HEAD - INSTALLATION).
(9) Install balance shaft assembly (Refer to 9 -
ENGINE/VALVE TIMING/BALANCE SHAFT -
INSTALLATION).
(10) Install oil pump

Page 2825 of 4284

CHRYSLER VOYAGER 2001  Service Manual (11) Install accessory drive belt (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
INSTALLATION).
(12) Install power steering belt (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
INSTALLATION).

Page 2826 of 4284

CHRYSLER VOYAGER 2001  Service Manual INSTALLATION
(1) Install vibration damper and retaining bolts
(Fig. 61). Torque bolts to 27.5N´m.
(2) Install accessory drive belt (Refer to 7 - COOL-
ING/ACCESSORY DRIVE/DRIVE BELTS - INSTAL-
LATION

Page 2827 of 4284

CHRYSLER VOYAGER 2001  Service Manual INSTALLATION
(1) Clean engine block and front engine cover seal-
ing surfaces.
(2) Apply a continous 3mm bead of Silicone Sealer
to cover, install within 10 minutes (Fig. 62). Torque
bolts to 11.8N´m