6E1-28 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. 1.5 V battery (6.0 V in total)
“A”
“B”
“C”
3) Arrange 4 new 1.5 V batteries in series (6.0 V in total).
With throttle lever in contact with plunger of ISC actuator, con-
nect these batteries to ISC actuator terminals and check ISC ac-
tuator for operation.
CAUTION:
Make sure that connection is made correctly between
batteries and terminals. Also, voltage must not be ap-
plied for longer than 1 second, or a faulty condition will
occur.
Make sure that connection is correct. Connecting to
other terminals may cause damage to closed throttle
position switch (idle switch).
After inspection, be sure to check that CTP switch is
ON. If it is OFF, move ISC actuator again and turn CTP
switch ON.
When positive terminal is
connected to “E” terminal
while plunger is contracted: Plunger expands
When positive terminal is
connected to “D” terminal
while plunger is expanded : Plunger contracts
When an abnormality has been found in above checks 2) and 3),
replace.
CLOSED THROTTLE POSITION (CTP) SWITCH, IDLE
SWITCH (IN ISC ACTUATOR)
INSPECTION
1) Disconnect connector from ISC actuator.
2) Arrange 3 new 1.5 V batteries in series (4.5 V in total) and con-
nect these batteries to CTP switch terminals “A” and “B”.
Check voltage between terminals “B” and “C” under following
each condition.
Throttle lever is in contact with ISC
actuator plunger : 0 – 1 V
Throttle lever is apart from plunger : 3.5 – 5.5 V
If check result is not satisfactory, replace throttle lower body.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-29
1. ISC actuator relay
2. Relay box
1. EFE heater
2. Rubber cover
3.“Red” wire
4.“Black” wire
ISC ACTUATOR RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove ISC actuator relay from relay box.
3) Structure of ISC actuator relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
EFE HEATER CONTROL SYSTEM
SYSTEM CIRCUIT INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is
in neutral position (with A/T model, selector lever in “P” range)
and that parking brake lever is pulled all the way up.
1) Turn up rubber cover of EFE heater to expose terminal-to-wire
connections.
2) Connect voltmeter to EFE terminals and check for voltage under
each condition given below.
CONDITION
VOLTAGE
Fast idle condition
Coolant temp.: below 80C (176F)
Engine speed: over 750 r/min.Battery
voltage
After warming up (other than above)No voltage
If check results are not as specified in above table, check EFE
heater, relay and wire harness.
3) Cover EFE heater connections with rubber cover.
EFE HEATER
CAUTION:
Do not bend wire harness of EFE heater excessively.
ON-VEHICLE INSPECTION
1) Disconnect EFE heater coupler.
2) Check resistance of EFE heater.
If it is not as specified below, replace.
EFE heater resistance: 0.5 – 3.0 Ω at 20C (68F)
3) Connect EFE heater coupler securely.
REMOVAL
1) Remove throttle body according to procedure described pre-
viously.
In this case, however, it is not necessary to disconnect fuel
hoses and engine cooling water hoses from throttle body.
2) Disconnect EFE heater coupler.
3) Remove EFE heater from intake manifold.
6E1-30 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Insulator
2. Lower gasket
3. Heater
1. Intake manifold
2. EFE heater
1. EFE heater relay
2. Relay box
1. Radiator fan motor
INSPECTION
Check lower gasket for damage and deterioration. Replace as
necessary.
Check heater and insulator for crack, corrosion or any other dam-
age. Replace as necessary.
INSTALLATION
1) Clean mating surfaces of throttle body and intake manifold that
mate with EFE heater.
2) Install EFE heater to intake manifold.
Use new upper gasket.
3) Install throttle body according to procedure described previous-
ly.
4) Connect EFE heater coupler.
EFE HEATER RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove EFE heater relay from relay box.
3) Structure of EFE heater relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
RADIATOR FAN CONTROL SYSTEM
SYSTEM INSPECTION
WARNING:
Keep hands, tools, and clothing away from engine cooling
fan to help prevent personal injury. This fan is electric and
can come on whether or not the engine is running. The fan
can start automatically in response to the ECT sensor with
the ignition switch in the “ON” position.
Connect SUZUKI scan tool (2) to DLC (3).
Start engine and keep it running to warm it up.
Now check to ensure that radiator fan is started when the coolant
temperature displayed on SUZUKI scan tool reaches 96C
(205F).
If check result is not satisfactory, check RFC relay, wire harness,
ECT sensor, ECM, coolant temp. meter and sender gauge unit.
Refer to “DTC P0480 FLOW TABLE” of Section 6 and “COOLANT
TEMP. METER AND GAUGE UNIT” of Section 8.
6E1-32 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
RH
LH
EMISSION CONTROL SYSTEM
EVAPORATIVE EMISSION CONTROL SYSTEM
EVAP CANISTER PURGE INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is
in neutral position (with A / T model, selector lever in “P” range)
and that parking brake lever is pulled all the way up.
1) Disconnect purge hose from EVAP canister.
2) Place finger against the end of disconnected hose and check
that vacuum is not felt there when engine is cool and running at
idle speed.
3) Connect purge hose to EVAP canister and warm up engine to
normal operating temperature.
4) Disconnect purge hose from EVAP canister.
5) Also check that vacuum is felt when engine is running at idle
speed.
NOTE:
The EVAP canister purge system does not perform purging
(vacuum is not detected at the purge hose) unless the en-
gine is sufficiently warmed up and the heated oxygen sen-
sor is activated fully. Also, when the purge hose is discon-
nected in Step 4), the air is drawn into the purge line. As a
result, ECM detects a change in the purge gas concentra-
tion and sometimes stops purging but this indicates noth-
ing abnormal.
If check result is not satisfactory, check vacuum passage, hoses,
EVAP canister purge valve, wire harness and ECM.
VACUUM PASSAGE INSPECTION
Start engine end run it at idle speed. Disconnect vacuum hose from
EVAP canister purge valve. With finger placed against hose discon-
nected, check that vacuum is applied.
If it is not applied, clean vacuum passage by blowing compressed
air.
VACUUM HOSE INSPECTION
Check hoses for connection, leakage, clog and deterioration. Re-
place as necessary.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-33
EVAP CANISTER PURGE VALVE INSPECTION
WARNING:
Do not suck the air through valve. Fuel vapor inside valve
is harmful.
1) With the ignition switch OFF position, disconnect coupler from
EVAP canister purge valve.
2) Check resistance between two terminals of EVAP canister
purge valve.
Resistance of EVAP canister purge valve:
33 – 39 Ω at 20C (68F)
If resistance is as specified, proceed to next operation check.
If not, replace.
3) Disconnect vacuum hoses from intake manifold and its pipe.
4) With coupler disconnected, blow into pipe “A”. Air should not
come out of pipe “B”.
5) Connect 12 V-battery to EVAP canister purge valve terminals.
In this state, blow pipe “A”.
Air should come out of pipe “B”.
If check result is not as described, replace canister purge valve.
6) Connect vacuum hoses.
7) Connect EVAP canister purge valve coupler securely.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-35
1. PCV valve
1. Proper size hose
2. Blow air
3. PCV valve
PCV VALVE INSPECTION
1) Disconnect PCV hose from PCV valve.
2) Run engine at idle.
3) Place your finger over end of PCV valve to check for vacuum.
If there is no vacuum, check for clogged valve. Replace as nec-
essary.
4) After checking vacuum, stop engine and check PCV valve for
sticking.
With engine stopped, connect a new hose to PCV valve for in-
spection.
Blow air into the hose and check that air flows with difficulty from
cylinder head side to intake manifold side.
If air flows without difficulty, valve is stuck in “Open” position. Re-
place PCV valve.
WARNING:
Do not suck air through PCV valve. Petroleum substances
inside the valve and fuel vapor inside the intake manifold
are harmful.
5) After removing the hose, connect PCV hose and clamp securely.
6E2
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-1
GENERAL DESCRIPTION6E2- 2 . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2- 6. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2- 7. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2- 8. . . . . .
Engine and Emission Control Input /
Output Table 6E2- 9. . . . . . . . . . . . . . . . . . . . . . . .
DIAGNOSISSee Section 6. . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6E2-13 . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment 6E2-13. . . . . . . . . .
Idle Speed/Idle Air Control (IAC)
Duty Inspection 6E2-14. . . . . . . . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2-15. . . . . . . . . . . . . . . . . .
Throttle Body 6E2-15. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve 6E2-17. . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2-18. . . . . . . . . . . . . .
Fuel Pressure Inspection 6E2-18. . . . . . . . . . . . . .
Fuel Pump 6E2-21. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator 6E2-22. . . . . . . . . . . . . . .
Fuel Injector 6E2-23. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2-27. . . . . .
ECM / PCM 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . . .
MAP Sensor 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor 6E2-28. . . . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor 6E2-29. . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor 6E2-30. . . . . . . . . . . . . . . . . . . . . . . . . Heated Oxygen Sensor -1 and -2 6E2-31. . . . . . .
Camshaft Position Sensor 6E2-32. . . . . . . . . . . . .
Crankshaft Position Sensor 6E2-32. . . . . . . . . . . .
Vehicle Speed Sensor 6E2-33. . . . . . . . . . . . . . . . .
Fuel Level Sensor (gauge) 6E2-33. . . . . . . . . . . . .
Main Relay, Fuel Pump Relay and
Radiator Fan Control Relay 6E2-33. . . . . . . . . . .
Fuel Cut Operation (Inspection) 6E2-34. . . . . . . .
Radiator Fan Control System 6E2-34. . . . . . . . . .
System Inspection 6E2-34. . . . . . . . . . . . . . . . . .
Radiator Fan 6E2-34. . . . . . . . . . . . . . . . . . . . . . .
EMISSION CONTROL SYSTEM 6E2-35. . . . . . . . .
EGR System 6E2-35. . . . . . . . . . . . . . . . . . . . . . . . .
EVAP Control System 6E2-36. . . . . . . . . . . . . . . . .
EVAP Canister Purge Inspection 6E2-36. . . . . .
Vacuum Passage Inspection 6E2-37. . . . . . . . .
Vacuum Hose Inspection 6E2-37. . . . . . . . . . . .
EVAP Canister Purge Valve
Inspection 6E2-37. . . . . . . . . . . . . . . . . . . . . . . .
EVAP Canister Inspection 6E2-38. . . . . . . . . . .
PCV System 6E2-38. . . . . . . . . . . . . . . . . . . . . . . . .
PCV Hose Inspection 6E2-38. . . . . . . . . . . . . . .
PCV Valve Inspection 6E2-38. . . . . . . . . . . . . . .
SPECIAL TOOLS6E2-39 . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS6E2-39 . . . . . . . . . . . . . . . . . . . . .
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SFI FOR G13)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
12 W / R “N”-range signal (A / T)
13 R Heated oxygen sensor-2
14 Y / R “D”-range signal (A / T)
15 R / W “R”-range signal (A / T)
16 Lg / B A / C SW signal
17 R / W EGR valve (stepper motor coil 4)
18 P / G Radiator fan relay
19 Y / Bl Fuel pump relay
20 —— ———
21 W / B “P”-range signal (A / T)
22 P / Bl Fuel level gauge
23 R / B “L”-range signal (A / T)
24 —— ———
1 V Malfunction indicator lamp
Vehicle speed sensor (M / T)
Output shaft speed sensor (+)
(A / T)
3 —— ———
4 G / W Shift solenoid – A (A / T)
5 Gr Throttle position (TP) sensor
6 B / W Ignition switch signal
7 Y / B Data link connector
Output shaft speed sensor (–)
(A / T)
9 —— ———
10 G GND for HO2S-2
11 G / Or Shift solenoid – B (A / T)
12 —— ———
13 —— ———
14 —— ———
15 —— ———
16 Br Tachometer signal
17 B / Y Engine start signal
CON-
NECTORTERMINALWIRE
COLORCIRCUITCON-
NECTORTERMINALWIRE
COLORCIRCUIT
20
Br / Y 19
Br / W
C02 C01C02
C03
Wire color
B : Black
B / Or : Black / Orange
B / W : Black / White
B / Y : Black / Yellow
Bl : Blue
Bl / Or : Blue / Orange
Bl / B : Blue / Black
Bl / R : Blue / Red
Bl / Y : Blue / Yellow
Br : Brown
Br / W : Brown / White
Br / Y : Brown / Yellow
G : Green
G / Or : Green / Orange
G / R : Green / Red
G / W : Green / White
Gr : Gray
Gr / R : Gray / Red
Lg / B : Lightgreen / Black
Lg / R : Lightgreen / RedP : Pink
P / Bl : Pink / Blue
P / G : Pink / Green
V : Violet
V / G : Violet / Green
V / R : Violet / Red
V / W : Violet / White
W : White
W / B : White / Black
W / R : White / Red
R : Red
R / B : Red / Black
R / Bl : Red / Blue
R / G : Red / Green
R / W : Red / White
R / Y : Red / Yellow
Y / B : Yellow / Black
Y / Bl : Yellow / Blue
Y / R : Yellow / Red
2
P
8
Bl
6E2-12 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
1 B Ground for ECM / PCM
2 B / Or Ground for drive circuit
3 B / Or Ground for drive circuit
4 V / R Canister purge valve
5 G / W Power steering pressure switch
6 V / W IAC valve
7 Bl Heater of HO2S-1
8 Bl / Or No.4 fuel injector
9 Bl / R No.1 fuel injector
10 G Ground for sensor circuit
11 B / W CMP sensor
12 —— ———
13 R Heated oxygen sensor-1
14 Lg / R Coolant temp. sensor
15 Gr / R Intake air temp. sensor
16 —— ———
17 Br / Y Electric load (+)
18 —— ———
IG coil assembly for
No.2 and 3 spark plugs
IG coil assembly for
No.1 and 4 spark plugs
21 Bl / B No.2 fuel injector
22 P Power supply for sensor
23 W CKP sensor (+)
24 B CKP sensor (–)
25 —— ———
26 G MAP sensor
27 —— ———
28 V / G Immobilizer indicator lamp
29 —— ———
30 —— ———
31 Bl / Y No.3 fuel injector
1 G / R A / C compressor clutch
2 R / Y EGR valve (stepper motor coil 1)
3 R / G Data link connector
4 Lg / B Heater of HO2S-2
5 R / B Power source
6 R / B Power source
7 W Backup power source
8 R EGR valve (stepper motor coil 3)
9 R / Bl EGR valve (stepper motor coil 2)
10 Gr Ground for main relay
11 Y / B “2”-range signal (A / T)