1997 SUBARU LEGACY service

[x] Cancel search: service

Page 1395 of 3342

SUBARU LEGACY 1997  Service Repair Manual 3. CONDITIONS FOR COMPLETION OF ABS
SEQUENCE CONTROL
When the following conditions develop, the ABS sequence
control stops and ABS and TCS warning lights come on
while the ABS and TCS function will th

Page 1396 of 3342

SUBARU LEGACY 1997  Service Repair Manual 4. CONDITIONS FOR ABS SEQUENCE CONTROL
B4M0637A
NOTE:
When select monitor is used, control operation starts at
point A. It is not required to operate brake lamp switch for
starting ABS sequence contro

Page 1397 of 3342

SUBARU LEGACY 1997  Service Repair Manual E: CHECKING THE HYDRAULIC UNIT TCS
OPERATION
1. CHECKING THE HYDRAULIC UNIT TCS
OPERATION BY PRESSURE GAUGE
1) Lift-up vehicle and remove wheels.
2) Disconnect the air bleeder screws from the FL and F

Page 1398 of 3342

SUBARU LEGACY 1997  Service Repair Manual 2. CHECKING THE HYDRAULIC UNIT TCS
OPERATION WITH BRAKE TESTER
1) Prepare for operating TCS sequence control. <Ref. to
4-4 [W20F1] step 1 or 4-4 [W20F2] step 1.>
B4M0638
2) Set the front wheels on the

Page 1399 of 3342

SUBARU LEGACY 1997  Service Repair Manual F: TCS SEQUENCE CONTROL
1) Under the TCS sequence control, after the hydraulic
unit solenoid valve is driven, the operation of the hydraulic
unit can be checked by means of the brake tester or pres-
s

Page 1400 of 3342

SUBARU LEGACY 1997  Service Repair Manual 2. OPERATIONAL GUIDELINES OF THE TCS
SEQUENCE CONTROL WITH SELECT MONITOR
1) Connect select monitor to data link connector beside
driver’s seat heater unit. <Ref. to 4-4 [W19D0] step 1).>
2) Engine

Page 1401 of 3342

SUBARU LEGACY 1997  Service Repair Manual 3. CONDITIONS FOR COMPLETION OF TCS
SEQUENCE CONTROL
When the following conditions develop, the TCS sequence
control stops and ABS and TCS warning lights come on
while the ABS and TCS function will th

Page 1402 of 3342

SUBARU LEGACY 1997  Service Repair Manual 4. CONDITIONS FOR TCS SEQUENCE CONTROL
B4M0642A
NOTE:
When select monitor is used, control operation starts at
point A. It is not required to operate TCS OFF switch for
starting control operation. The