
HAC-2
Diagnosis Procedure ..............................................37
A/C INDICATOR ................................................39
Diagnosis Procedure ........................................... ...39
FRONT BLOWER MOTOR ................................41
Description ........................................................... ...41
Diagnosis Procedure ..............................................41
Component Inspection (Front Blower Motor) ..........43
Component Inspection (B lower Relay) ...................43
Component Inspection (Front Blower Motor Re-
sistor) ................................................................... ...
43
Component Inspection (Fan Switch) ......................43
MAGNET CLUTCH ............................................45
Description ........................................................... ...45
Component Function Check ...................................45
Diagnosis Procedure ..............................................45
SYMPTOM DIAGNOSIS .............................47
MANUAL AIR CONDITIONING SYSTEM ...... ...47
Symptom Table ................................................... ...47
INSUFFICIENT COOLING .................................48
Description ........................................................... ...48
Diagnosis Procedure ..............................................48
INSUFFICIENT HEATING .................................49
Description ........................................................... ...49
Diagnosis Procedure ..............................................49
COMPRESSOR DOES NOT OPERATE ...........50
Description ........................................................... ...50
Diagnosis Procedure ............................................ ...50
REMOVAL AND INSTALLATION ..............52
FRONT AIR CONTROL .................................. ...52
Exploded View ..................................................... ...52
Removal and Installation .........................................52
THERMO CONTROL AMPLIFIER ................. ...53
Removal and Installation .........................................53
REFRIGERANT PRESSURE SENSOR ......... ...54
Removal and Installation .........................................54
FRONT BLOWER MOTOR RESISTOR ......... ...55
Exploded View ..................................................... ...55
Removal and Installation .........................................55
DOOR CABLE ................................................ ...56
Exploded View ..................................................... ...56
INTAKE DOOR CABLE ......................................... ...56
INTAKE DOOR CABLE : Removal and Installation
...
56
INTAKE DOOR CABLE : Adjustment .................. ...56
MODE DOOR CABLE ............................................ ...57
MODE DOOR CABLE : Removal and Installation ...57
MODE DOOR CABLE : Adjustment ........................57
AIR MIX DOOR CABLE ......................................... ...57
AIR MIX DOOR CABLE : Removal and Installation
...
57
AIR MIX DOOR CABLE : Adjustment .................. ...57
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual SYSTEMHAC-11
< SYSTEM DESCRIPTION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYSTEM
System DescriptionINFOID:0000000012430717
SYSTEM DIAGRAM
SYSTEM DESCRIPTION
• The manual air co NISSAN NOTE 2016 Service Repair Manual SYSTEMHAC-11
< SYSTEM DESCRIPTION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYSTEM
System DescriptionINFOID:0000000012430717
SYSTEM DIAGRAM
SYSTEM DESCRIPTION
• The manual air co](/manual-img/5/57363/w960_57363-1978.png)
SYSTEMHAC-11
< SYSTEM DESCRIPTION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYSTEM
System DescriptionINFOID:0000000012430717
SYSTEM DIAGRAM
SYSTEM DESCRIPTION
• The manual air conditioning system is c ontrolled by a sequence of functions from the front air control, BCM,
ECM, and IPDM E/R.
• The fan speed of the front blower motor is changed by t he combination of the fan control dial (fan switch)
operation and blower resistor control.
Compressor ControlINFOID:0000000012430718
PRINCIPLE OF OPERATION
Compressor is not activated.
Functional Circuit Diagram
ALIIA0813GB
Module/Function Door control A/C request signalCompressor control Cooling fan control
Front air control HAC-13
— HAC-11—
BCM —BCS-7
(With Intelligent Key system)
BCS-78
(Without Intelligent Key system) ——
ECM — —HAC-11
EC-38
IPDM E/R — —HAC-11EC-38
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual MANUAL AIR CONDITIONING SYSTEMHAC-47
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYMPTOM DIAGNOSIS
MANUAL AIR CONDITIONING SYSTEM
Symptom TableINFOID:000000001243 NISSAN NOTE 2016 Service Repair Manual MANUAL AIR CONDITIONING SYSTEMHAC-47
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYMPTOM DIAGNOSIS
MANUAL AIR CONDITIONING SYSTEM
Symptom TableINFOID:000000001243](/manual-img/5/57363/w960_57363-2014.png)
MANUAL AIR CONDITIONING SYSTEMHAC-47
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
SYMPTOM DIAGNOSIS
MANUAL AIR CONDITIONING SYSTEM
Symptom TableINFOID:0000000012430749
SYMPTOM TABLE
Symptom Reference Page
A/C system does not come on. Go to Trouble Diagnosis Procedure for A/C System. HAC-30
A/C system cannot be controlled.Go to Self-diagnosis Function. HAC-28
Air outlet does not change.Go to Adjustment Procedure for Mode Door. HAC-57
Discharge air temperature does not change. Go to Adjustment Procedure for Air Mix Door. HAC-57
Intake door does not change.Go to Adjustment Procedure for Intake Door. HAC-56
Front blower motor operation is malfunction-
ing.Go to Trouble Diagnosis Procedure for Front Blower Motor.
HAC-41
Magnet clutch does not engage.Go to Trouble Diagnosis Procedure for Magnet Clutch. HAC-45
Insufficient cooling.Go to Trouble Diagnosis Procedure for Insufficient Cooling. HAC-48
Insufficient heating.Go to Trouble Diagnosis Procedure for Insufficient Heating. HAC-49
Noise.Go to Trouble Diagnosis Procedure for Noise. HA-17
A/C switch LED does not illuminate. Go to Trouble Diagnosis Procedure for A/C System. HAC-39
Both high- and low-pressure sides are too
high.Go to Trouble Diagnosis Procedure for Abnormal Pressure.
HA-15
High-pressure side is too high and low pres-
sure side is too low.Go to Trouble Diagnosis Procedure for Abnormal Pressure.
HA-15
High-pressure side is too low and low-pres-
sure side is too high.Go to Trouble Diagnosis Procedure for Abnormal Pressure.
HA-15
Both high- and low-pressure side sometimes
become negative.Go to Trouble Diagnosis Procedure for Abnormal Pressure.
HA-15
Low-pressure side sometimes becomes neg-
ative.Go to Trouble Diagnosis Procedure for Abnormal Pressure.
HA-15
Low-pressure side becomes negative. Go to Trouble Diagnosis Procedure for Abnormal Pressure. HA-15
Revision: August 20152016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual HAC-48
< SYMPTOM DIAGNOSIS >[MANUAL AIR CONDITIONING]
INSUFFICIENT COOLING
INSUFFICIENT COOLING
DescriptionINFOID:0000000012430750
Symptom
• Insufficient cooling
• No cool air comes out. (Air flow NISSAN NOTE 2016 Service Repair Manual HAC-48
< SYMPTOM DIAGNOSIS >[MANUAL AIR CONDITIONING]
INSUFFICIENT COOLING
INSUFFICIENT COOLING
DescriptionINFOID:0000000012430750
Symptom
• Insufficient cooling
• No cool air comes out. (Air flow](/manual-img/5/57363/w960_57363-2015.png)
HAC-48
< SYMPTOM DIAGNOSIS >[MANUAL AIR CONDITIONING]
INSUFFICIENT COOLING
INSUFFICIENT COOLING
DescriptionINFOID:0000000012430750
Symptom
• Insufficient cooling
• No cool air comes out. (Air flow volume is normal.)
Diagnosis ProcedureINFOID:0000000012430751
NOTE:
Perform self-diagnosis with CONSULT before performing
symptom diagnosis. If any malfunction result or DTC
is detected, perform the corresponding diagnosis.
1.CHECK MAGNET CLUTCH OPERATION
1. Turn ignition switch ON.
2. Turn fan control dial ON.
3. Press A/C switch.
4. Check that A/C indicator turns ON. Check visually and by sound that compressor operates.
5. Press A/C switch again.
6. Check that A/C indicator turns OFF. Check that compressor stops.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Check compressor operation. Refer to HAC-50, "
Diagnosis Procedure".
2.CHECK DRIVE BELT
Check tension of drive belt. Refer to EM-17, "
Inspection".
Is the inspection result normal?
YES >> GO TO 3.
NO >> Adjust or replace drive belt depending on the inspection results.
3.CHECK REFRIGERANT CYCLE PRESSURE
Connect the recovery/recycling recharging equipment to the vehicle and perform the pressure inspection
using gauge. Refer to HA-15, "
Symptom Table".
Is the inspection result normal?
YES >> GO TO 4.
NO >> Repair or replace parts depending on the inspection results.
4.CHECK AIR LEAKAGE FROM EACH DUCT
Check duct and nozzle, etc. of t he air conditioner system for leakage.
Is the inspection result normal?
YES >> Check air mix door cable installation and air mix door operation.
NO >> Repair or replace parts depending on the inspection results.
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual INSUFFICIENT HEATINGHAC-49
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
INSUFFICIENT HEATING
DescriptionINFOID:0000000012430752
Symptom
• Insufficient heating
NISSAN NOTE 2016 Service Repair Manual INSUFFICIENT HEATINGHAC-49
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
INSUFFICIENT HEATING
DescriptionINFOID:0000000012430752
Symptom
• Insufficient heating](/manual-img/5/57363/w960_57363-2016.png)
INSUFFICIENT HEATINGHAC-49
< SYMPTOM DIAGNOSIS > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
INSUFFICIENT HEATING
DescriptionINFOID:0000000012430752
Symptom
• Insufficient heating
• No warm air comes out. (Air flow volume is normal.)
Diagnosis ProcedureINFOID:0000000012430753
NOTE:
Perform self-diagnosis with CONSULT before performing sy mptom diagnosis. If any malfunction result or DTC
is detected, perform the corresponding diagnosis.
1.CHECK COOLING SYSTEM
1. Check engine coolant level and check for leakage. Refer to CO-8, "
Inspection".
2. Check radiator cap. Refer to CO-12, "
RADIATOR CAP : Inspection".
3. Check water flow sounds of the engine coolant. Refer to CO-9, "
Refilling".
Is the inspection result normal?
YES >> GO TO 2.
NO >> Refill engine coolant and repair or replace the parts depending on the inspection results.
2.CHECK HEATER HOSE
Check installation of heater hose by visually or touching.
Is the inspection result normal?
YES >> GO TO 3.
NO >> Repair or replace parts depending on the inspection results.
3.CHECK HEATER CORE
1. Check temperature of inlet hose and outlet hose of heater core.
2. Check that inlet side of heater core is hot and the outle t side is slightly lower than/almost equal to the inlet
side.
CAUTION:
Always perform the temperature inspection in a sh ort period of time because the engine coolant
temperature is very hot.
Is the inspection result normal?
YES >> GO TO 4.
NO >> Replace heater core. Refer to HA-35, "
HEATER CORE : Removal and Installation".
4.CHECK AIR LEAKAGE FROM EACH DUCT
Check duct and nozzle, etc. of air conditioning system for air leakage.
Is the inspection result normal?
YES >> Check air mix door cable inst allation and air mix door operation.
NO >> Repair or replace parts depending on the inspection results.
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual FRONT BLOWER MOTOR RESISTORHAC-55
< REMOVAL AND INSTALLATION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
FRONT BLOWER MOTOR RESISTOR
Exploded ViewINFOID:0000000012430760
Removal and NISSAN NOTE 2016 Service Repair Manual FRONT BLOWER MOTOR RESISTORHAC-55
< REMOVAL AND INSTALLATION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
FRONT BLOWER MOTOR RESISTOR
Exploded ViewINFOID:0000000012430760
Removal and](/manual-img/5/57363/w960_57363-2022.png)
FRONT BLOWER MOTOR RESISTORHAC-55
< REMOVAL AND INSTALLATION > [MANUAL AIR CONDITIONING]
C
D
E
F
G H
J
K L
M A
B
HAC
N
O P
FRONT BLOWER MOTOR RESISTOR
Exploded ViewINFOID:0000000012430760
Removal and InstallationINFOID:0000000012430761
REMOVAL
1. From under the LH side of the instrment panel, disconnect harness connector from front blower motor
resistor.
2. Remove screws and front blower motor resistor.
INSTALLATION
Installation is in the reverse order of removal.
1. Heating and cooling unit assembly 2. Front blower motor 3. Front blower motor resistor
AWIIA1465ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual HAC-56
< REMOVAL AND INSTALLATION >[MANUAL AIR CONDITIONING]
DOOR CABLE
DOOR CABLE
Exploded ViewINFOID:0000000012430762
INTAKE DOOR CABLE
INTAKE DOOR CABLE : Removal and InstallationINFOID:00000000124 NISSAN NOTE 2016 Service Repair Manual HAC-56
< REMOVAL AND INSTALLATION >[MANUAL AIR CONDITIONING]
DOOR CABLE
DOOR CABLE
Exploded ViewINFOID:0000000012430762
INTAKE DOOR CABLE
INTAKE DOOR CABLE : Removal and InstallationINFOID:00000000124](/manual-img/5/57363/w960_57363-2023.png)
HAC-56
< REMOVAL AND INSTALLATION >[MANUAL AIR CONDITIONING]
DOOR CABLE
DOOR CABLE
Exploded ViewINFOID:0000000012430762
INTAKE DOOR CABLE
INTAKE DOOR CABLE : Removal and InstallationINFOID:0000000012430763
The intake door cable is not serviced separately. Refer to
HAC-52, "Removal and Installation".
INTAKE DOOR CABLE : AdjustmentINFOID:0000000012430764
1. Remove glove box assembly. Refer to IP-25, "Removal and Installation".
2. Disconnect intake door cable (1) from clip (A).
3. Set intake door lever to REC position.
4. Push intake door link (2) in the direction shown, then carefully pull outer cable to front air control side and connect clip.
1. Heating and cooling unit assembly 2. Plate 3. Air mix door linkage 2
4. Air mix door linkage 1 5. Air mix door cable6. Intake door lever
7. Intake door linkage 8. Intake door cable9. Foot door lever
10. Mode door cable 11. Main linkage12. Ventilator door rod
13. Ventilator door lever
A. To front air control
JMIIA1742ZZ
JMIIA0617ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com

HA-2
LIQUID TANK : Removal and Installation of Liquid
Tank ........................................................................
32
REFRIGERANT PRESSURE SENSOR ....................32
REFRIGERANT PRESSURE SENSOR : Remov-
al and Installation ................................................. ...
32
HEATING AND COOLING UNIT ASSEMBLY ...33
Exploded View ..................................................... ...33
HEATING AND COOLING UNIT ASSEMBLY ....... ...34
HEATING AND COOLING UNIT ASSEMBLY :
Removal and Installation ........................................
34
HEATER CORE ...................................................... ...35
HEATER CORE : Removal and Installation ...........35
EVAPORATOR ....................................................... ...35
EVAPORATOR : Removal and Installation .............35
EXPANSION VALVE .............................................. ...35
EXPANSION VALVE : Removal and Installation ....36
SERVICE DATA AND SPECIFICATIONS
(SDS) .......... ................................. ...............
37
SERVICE DATA AND SPECIFICATIONS
(SDS) .............................................................. ...
37
Compressor ......................................................... ...37
Oil ............................................................................37
Refrigerant ..............................................................37
Revision: August 2015 2016 Versa Note
cardiagn.com