P0340 CMP SENSOR (PHASE)EC-207
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
• Harness for open or short between camshaft position sensor (PHASE) and ECM
• Harness for open or short between camshaft
position sensor (PHASE) and IPDM E/R
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK CMP SENSOR (PHASE) GRO UND CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Check harness continuity between CMP sensor (PHASE) terminal 1 and ground. Refer to wiring Diagram.
3. Also check harness for short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors F32, E2
• Harness for open or short betw een CMP sensor (PHASE) and ground
>> Repair open circuit or short to power in harness or connectors.
7.CHECK CMP SENSOR (PHASE) INPUT SI GNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Check harness continuity between ECM termi nal 14 and CMP sensor (PHASE) terminal 2.
Refer to Wiring Diagram.
3. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 8.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
8.CHECK CAMSHAFT POSITI ON SENSOR (PHASE)
Refer to EC-207, "
Component Inspection".
OK or NG
OK >> GO TO 9.
NG >> Replace camshaft position sensor (PHASE).
9.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
>> INSPECTION END
Component InspectionINFOID:0000000005149228
CAMSHAFT POSITION SENSOR (PHASE)
1. Loosen the fixing bolt of the sensor.
2. Disconnect camshaft position s ensor (PHASE) harness connector.
3. Remove the sensor. Continuity should exist.
Continuity should exist.
Revision: April 20092010 QX56
P0420, P0430 THREE WAY CATALYST FUNCTIONEC-211
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
Check the following items. Refer to
EC-13, "Basic Inspection".
OK or NG
OK >> GO TO 5.
NG >> Follow the EC-13, "
Basic Inspection".
5.CHECK FUEL INJECTOR
1. Stop engine and then turn ignition switch ON.
2. Check voltage between ECM terminals 21, 22, 23, 40, 41, 42, 44, 63 and ground with CONSULT-III or tester.
Refer to Wiring Diagram for fuel injector, EC-435, "
Wiring Dia-
gram - ENGINE CONTROL SYSTEM -".
OK or NG
OK >> GO TO 6.
NG >> Perform EC-407, "
Diagnosis Procedure".
6.CHECK FUNCTION OF IGNITION COIL-I
CAUTION:
Do the following procedure in the place where ventilation is good without the combustible.
1. Turn ignition switch OFF.
2. Remove fuel pump fuse in IPDM E/R to release fuel pressure.
NOTE:
Do not use CONSULT-III to release fuel pressure, or fuel pres-
sure applies again during the following procedure.
3. Start engine.
4. After engine stalls, crank it two or three times to release all fuel pressure.
5. Turn ignition switch OFF.
6. Remove all ignition coil harness connectors to avoid the electri- cal discharge from the ignition coils.
7. Remove ignition coil and spark plug of the cylinder to be checked.
8. Crank engine for 5 seconds or more to remove combustion gas in the cylinder.
9. Connect spark plug and harness connector to ignition coil.
10. Fix ignition coil using a rope etc. with gap of 13 - 17 mm (0.52 - 0.66 in) between the edge of the spark plug and grounded metal
portion as shown in the figure.
11. Crank engine for about 3 seconds, and check whether spark is
generated between the spark plug and the grounded metal por-
tion.
CAUTION:
• During the operation, always stay 0.5 m (1.6 ft) or moreaway from the spark plug and the ignition coil. Be careful
not to get an electrical sh ock while checking, because the
electrical discharge voltage becomes 20 kV or more.
• It might cause to damage the igni tion coil if the gap of more than 17 mm (0.66 in) is taken.
NOTE:
When the gap is less than 13 mm (0.52 in), a spark might be generated even if the coil is malfunc-
tioning.
Items Specifications
Target idle speed 650 ± 50 rpm (in P or N position)
Ignition timing 15 ± 5° BTDC (in P or N position)
Battery voltage should exist.
PBIB1527E
Spark should be generated.
BBIA0380E
PBIB2325E
Revision: April 20092010 QX56
P0443 EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-227
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
8. Start engine and let it idle until “TESTING” on CONSULT-III changes to “COMPLETED”. (It will take
approximately 10 seconds.)
If “TESTING” is not displayed afte r 5 minutes, retry from step 2.
9. Make sure that “OK” is displayed after touching “S ELF-DIAG RESULTS”. If “NG” is displayed, refer to EC-
227, "Diagnosis Procedure".
With GST
1. Start engine and warm it up to normal operating temperature.
2. Turn ignition switch OFF and wait at least 10 seconds.
3. Turn ignition switch ON.
4. Turn ignition switch OFF and wait at least 10 seconds.
5. Start engine and let it idle for at least 20 seconds.
6. Select Service $07 with GST.
7. If 1st trip DTC is detected, go to EC-227, "
Diagnosis Procedure".
Diagnosis ProcedureINFOID:0000000005149245
1.CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister purge volume control solenoid valve harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister purge volume control
solenoid valve terminal 1 and ground with CONSULT-III or
tester.
OK or NG
OK >> GO TO 3.
NG >> GO TO 2.
2.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E2, F32
• Harness for open or short between EVAP canister purge volume control solenoid valve and IPDM E/R
• Harness for open or short between EVAP canister purge volume control solenoid valve and ECM
>> Repair harness or connectors.
3.CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT
FOR OPEN AND SHORT1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 45 and EVAP canister purge volume control solenoid valve terminal 2. Refer to Wiring Diagram.
BBIA0366E
Voltage: Battery voltage
PBIB2245E
Continuity should exist.
Revision: April 20092010 QX56
EC-232
< COMPONENT DIAGNOSIS >[VK56DE]
P0444, P0445 EVAP CANISTER P
URGE VOLUME CONTROL SOLENOID
VALVE
DTC Confirmation Procedure
INFOID:0000000005149249
NOTE:
If DTC Confirmation Procedure has been previously conducted, always perform the following procedure
before conducting the next step.
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Turn ignition switch ON.
3. Turn ignition switch OFF and wait at least 10 seconds.
TESTING CONDITION:
Before performing the following procedure, confi rm battery voltage is more than 11 V at idle.
1. Start engine and let it idle for at least 13 seconds.
2. Check 1st trip DTC.
3. If 1st trip DTC is detected, go to EC-232, "
Diagnosis Procedure".
Diagnosis ProcedureINFOID:0000000005149250
1.CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister purge volume control solenoid valve harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister purge volume control solenoid valve terminal 1 and ground with CONSULT-III or
tester.
OK or NG
OK >> GO TO 3.
NG >> GO TO 2.
2.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E2, F32
• Harness for open or short between EVAP canister purge volume control solenoid valve and IPDM E/R
• Harness for open or short between EVAP canister purge volume control solenoid valve and ECM
>> Repair harness or connectors.
3.CHECK EVAP CANISTER PURGE VOLUME CONTRO L SOLENOID VALVE OUTPUT SIGNAL CIRCUIT
FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 45 and EVAP canister purge volume control solenoid
valve terminal 2. Refer to Wiring Diagram.
BBIA0366E
Voltage: Battery voltage
PBIB2245E
Continuity should exist.
Revision: April 20092010 QX56
P0447 EVAP CANISTER VENT CONTROL VALVEEC-235
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2.CHECK EVAP CANISTER VENT CONTROL VALVE CIRCUIT
With CONSULT-III
1. Turn ignition switch OFF and then turn ON.
2. Select “VENT CONTROL/V” in “A CTIVE TEST” mode with CONSULT-III.
3. Touch “ON/OFF” on CONSULT-III screen.
4. Check for operating sound of the valve. Clicking noise should be heard.
OK or NG
OK >> GO TO 7.
NG >> GO TO 3.
3.CHECK EVAP CANISTER VENT CONT ROL VALVE POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister vent control valve harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister vent control valve termi- nal 2 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E41, C1
• Harness for open or short between EVAP cani ster vent control valve and IPDM E/R
>> Repair harness or connectors.
5.CHECK EVAP CANISTER VENT CONTROL VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 1 17 and EVAP canister vent control valve terminal 1.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6.DETECT MALFUNCTIONING PART
Voltage: Battery voltage
BBIA0443E
PBIB0192E
Continuity should exist.
Revision: April 20092010 QX56
P0451 EVAP CONTROL SYSTEM PRESSURE SENSOREC-243
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
Refer to
EC-85, "Ground Inspection".
OK or NG
OK >> GO TO 2.
NG >> Repair or replace ground connections.
2.CHECK EVAP CONTROL SYS TEM PRESSURE SENSOR CONNECTOR FOR WATER
1. Disconnect EVAP control system pressure sensor harness connector.
2. Check sensor harness connector for water.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness connector.
3.CHECK EVAP CONTROL SYS TEM PRESSURE SENSOR
Refer to EC-243, "
Component Inspection".
OK or NG
OK >> GO TO 4.
NG >> Replace EVAP control system pressure sensor.
4.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
For wiring diagram, refer to EC-246, "
Diagnosis Procedure".
>> INSPECTION END
Component InspectionINFOID:0000000005149266
EVAP CONTROL SYSTEM PRESSURE SENSOR
1. Remove EVAP control system pr essure sensor with its harness connector connected from EVAP canister.
Always replace O-ring with a new one.
2. Install a vacuum pump to EVAP control system pressure sensor.
BBIA0354E
Water should not exist.
BBIA0443E
Revision: April 20092010 QX56
P0452 EVAP CONTROL SYSTEM PRESSURE SENSOREC-247
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
3.CHECK EVAP CONTROL SYS
TEM PRESSURE SENSOR POWER SUPPLY CIRCUIT
1. Turn ignition switch ON.
2. Check voltage between EVAP control system pressure sensor terminal 3 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors C1, E41
• Harness connectors E5, F14
• Harness for open or short between EVAP c ontrol system pressure sensor and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK EVAP CONTROL SYSTEM PRESSURE SENSOR GROUND CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between EVAP control s ystem pressure sensor terminal 1 and ECM terminal
67.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors C1, E41
• Harness connectors E5, F14
• Harness for open or short between EVAP c ontrol system pressure sensor and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7.CHECK EVAP CONTROL SYSTEM PRESSURE SENS OR INPUT SIGNAL CIRCUIT FOR OPEN AND
SHORT
1. Check harness continuity between ECM terminal 32 and EVAP control system pressure sensor terminal 2.
Refer to Wiring Diagram.
2. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8.
8.DETECT MALFUNCTIONING PART Voltage: Approximately 5V
PBIB0138E
Continuity should exist.
Continuity should exist.
Revision: April 20092010 QX56
P0453 EVAP CONTROL SYSTEM PRESSURE SENSOREC-251
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
OK >> GO TO 3.
NG >> Repair or replace harness connector.
3.CHECK EVAP CONTROL SYS
TEM PRESSURE SENSOR POWER SUPPLY CIRCUIT
1. Turn ignition switch ON.
2. Check voltage between EVAP control system pressure sensor terminal 3 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors C1, E41
• Harness connectors E5, F14
• Harness for open or short between EVAP c ontrol system pressure sensor and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK EVAP CONTROL SYSTEM PRESSURE SENSOR GROUND CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between EVAP control s ystem pressure sensor terminal 1 and ECM terminal
67.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors C1, E41
• Harness connectors E5, F14
• Harness for open or short between EVAP c ontrol system pressure sensor and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7.CHECK EVAP CONTROL SYSTEM PRESSURE SENS OR INPUT SIGNAL CIRCUIT FOR OPEN AND
SHORT
1. Check harness continuity between ECM terminal 32 and EVAP control system pressure sensor terminal 2.
Refer to Wiring Diagram.
2. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8. Voltage: Approximately 5V
PBIB0138E
Continuity should exist.
Continuity should exist.
Revision: April 20092010 QX56