2007 ISUZU KB P190 ECO mode

[x] Cancel search: ECO mode

Page 827 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A – 22  ENGINE MECHANICAL 
RECOMMENDED LIQUID GASKET 
Type Brand  Name Manufacturer Remarks 
RTV* 
Silicon Base  ThreeBond 1207B  
ThreeBond 1207C  Three Bond 
Three Bond   
  W ater Base 
ThreeBon

Page 830 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 25 
  Replenished Engine Oil MAX lit (US/UK gal)
Condition
  
 
Model  Engine Dry 
  W ith oil filter 
replacement  W ithout oil 
filter 
replacement 
4  × 2 
4  × 4 
(4JA

Page 832 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 27 
111R300001 
  
 
 COOLING SYSTEM 
Coolant Level 
Check the coolant level and replenish the radiator reserve  
tank as necessary.  
If the coolant level falls below the

Page 841 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A – 36  ENGINE MECHANICAL 
GENERAL DESCRIPTION 
  
 
  
 
 
 
 
 
 
 RTW 46AMF000401 
  
The 4J series automotive diesel engine has special designed combustion chambers in the piston. This design

Page 846 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 41 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coolant Replenishment 
Warning:  
When the coolant is heated to a hig

Page 910 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 105 
  
 
  
 
 
 
5.  Crankshaft Thrust Bearing 
Apply an ample coat of engine oil to the thrust bearings  
before installation.  
Install the thrust bearings to the cranks

Page 914 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 109 
 
   
 
 16. Crank Case 
1.  Apply the recommended liquid gasket (Three bond  1207B) or its equivalent to arch gasket fitting surface  
as shown in the illustration. 
2

Page 920 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL   6A – 115 
   
 
 
RTW 46ASH002201    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4JA1T(L): 
4.  Tighten the injection pump bolts to the specified torque. 
5.  Install the injection