FRONT TIMING CHAIN CASE
EM-55
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
18. Remove collared O-ring from front timing chain case (left and
right side).
19. Remove rocker covers (right and left banks). Refer toEM-51, "
ROCKER COVER" .
NOTE:
When only timing chain (primary) is removed, rocker cover does not need to be removed.
20. Obtain No. 1 cylinder at TDC of its compression stroke as follows:
NOTE:
When timing chain is not removed/installed, this step is not required.
a. Rotate crankshaft pulley clockwise to align timing mark (grooved
line without color) with timing indicator.
b. Make sure that intake and exhaust cam noses on No. 1 cylinder
(engine front side of right bank) are located as shown in the fig-
ure.
If not, turn crankshaft one revolution (360 degrees) and align
as shown in the figure.
NOTE:
When only timing chain (primary) is removed, rocker cover does
not need to be removed. To make sure that No. 1 cylinder is at
its compression TDC, remove front timing chain case first. Then
check mating marks on camshaft sprockets. Refer to EM-72,
"INSTALLATION" .
21. Remove crankshaft pulley as follows:
a. Remove rear cover plate (2WD models) or starter motor (AWD
models) and set ring gear stopper (SST) as shown in the figure.
Refer to SC-10, "
STARTING SYSTEM" .
PBIC2631E
KBIA1717J
SEM418G
PBIC1098E
FRONT TIMING CHAIN CASE
EM-63
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
10. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
11. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
EM-72
[VQ35DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
39. Use a scraper to remove all traces of liquid gasket from water
pump cover, chain tensioner cover and intake valve timing con-
trol covers.
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and any excessive wear at link plates and roller
links of timing chain. Replace timing chain as necessary.
INSTALLATION
NOTE:
The below figure shows the relationship between the mating mark on each timing chain and that on the corre-
sponding sprocket, with the components installed.
SEM926E
PBIC0282E
PBIC3493E
TIMING CHAIN
EM-75
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
g. After installing rear timing chain case, check the surface height
difference between the following parts on the oil pan (upper)
mounting surface.
If not within the standard, repeat the installation procedure.
3. Install water pump with new O-rings. Refer to CO-24, "
WATER PUMP" .
4. Make sure that dowel pin hole, dowel pin and crankshaft key are
located as shown in the figure. (No. 1 cylinder at compression
TDC)
NOTE:
Though camshaft does not stop at the position as shown in the
figure, for the placement of cam nose, it is generally accepted
camshaft is placed for the same direction of the figure.
CAUTION:
Hole on small dia. side must be used for intake side dowel pin hole. Do not misidentify (ignore big
dia. side).
5. Install timing chains (secondary) and camshaft sprockets as follows:
CAUTION:
Mating marks between timing chain and sprockets slip easily. Confirm all mating mark positions
repeatedly during the installation process.
a. Push plunger of timing chain tensioner (secondary) and keep it
pressed in with a stopper pin.Standard
Rear timing chain case to cylinder block:
–0.24 to 0.14 mm (–0.0094 to 0.0055 in)
SEM943G
Camshaft dowel pin hole (intake side)
: At cylinder head upper face side in each bank.
Camshaft dowel pin (exhaust side)
: At cylinder head upper face side in each bank.
Crankshaft key
: At cylinder head side of right bank.
KBIA1073E
SEM430G
EM-76
[VQ35DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
b. Install timing chains (secondary) and camshaft sprockets.
Align the mating marks on timing chain (secondary) (gold link)
with the ones on intake and exhaust camshaft sprockets
(punched), and install them.
NOTE:
Mating marks for intake camshaft sprocket are on the back
side of camshaft sprocket (secondary).
There are two types of mating marks, circle and oval types.
They should be used for the right and left banks, respec-
tively.
Align dowel pin and pin hole on camshafts with the groove
and dowel pin on sprockets, and install them.
On the intake side, align pin hole on the small diameter side of
the camshaft front end with dowel pin on the back side of
camshaft sprocket, and install them.
On the exhaust side, align dowel pin on camshaft front end
with pin groove on camshaft sprocket, and install them.
In case that positions of each mating mark and each dowel
pin are not fit on mating parts, make fine adjustment to the
position holding the hexagonal portion on camshaft with wrench or equivalent.
Mounting bolts for camshaft sprockets must be tightened in the next step. Tightening them by hand is
enough to prevent the dislocation of dowel pins.
It may be difficult to visually check the dislocation of mating
marks during and after installation. To make the matching
easier, make a mating mark on the top of sprocket teeth and
its extended line in advance with paint.
c. After confirming the mating marks are aligned, tighten camshaft
sprocket mounting bolts.
Secure camshaft using a wrench at the hexagonal portion to
tighten mounting bolts.Right bank : Use circle type.
Left bank : Use oval type.
PBIC2981E
PBIC0891E
KBIA1698J
TIMING CHAIN
EM-81
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
e. After installing front timing chain case, check the surface height
difference between the following parts on the oil pan (upper)
mounting surface.
If not within the standard, repeat the installation procedure.
15. Install right and left intake valve timing control covers as follows:
a. Install new seal rings in shaft grooves.
b. Apply a continuous bead of liquid gasket with the tube presser
[SST: WS39930000 ( — )] to intake valve timing control cov-
ers as shown in the figure.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS" .
c. Install new collared O-rings in front timing chain case oil hole
(left and right sides).
d. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain
case with holes to install intake valve timing control covers.
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
16. Install oil pans (upper and lower). Refer to EM-29, "
OIL PAN AND OIL STRAINER" .
17. Install rocker covers (right and left banks). Refer to EM-51, "
ROCKER COVER" .
18. Install crankshaft pulley as follows:
a. Fix crankshaft using the ring gear stopper [SST: KV10117700 (J44716)].
b. Install crankshaft pulley, taking care not to damage front oil seal.
When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference). Standard
Front timing chain case to rear timing chain case:
–0.14 to 0.14 mm (–0.005 to 0.0055 in)
SEM943G
SBIA0492E
PBIC2631E
PBIC0918E
EM-82
[VQ35DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
c. Tighten crankshaft pulley bolt.
d. Place a matching mark (A) on crank pulley (1) aligning with the
matching (B) of crank pulley mounting bolt (2). Tighten the bolts
90 degrees (one marks).
NOTE:
The figure shows crankshaft pulley bolt with four marks.
Use an angle wrench (SST) for a crankshaft pulley bolt with
six–marks.
e. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
19. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.: 44.1 Nꞏm (4.5 kg-m, 33 ft-lb)
PBIC4627J
PBIC3821E
EM-88
[VQ35DE]
CAMSHAFT
Revision: 2006 January2006 M35/M45
2. Measure the camshaft sprocket runout with a dial indicator.
(Total indicator reading)
If it exceeds the limit, replace camshaft sprocket.
Valve Lifter
Check if surface of valve lifter has any wear or cracks.
If anything above is found, replace valve lifter. Refer to EM-153,
"Available Valve Lifter" .
Valve Lifter Clearance
VALVE LIFTER OUTER DIAMETER
Measure the outer diameter at 1/2 height of valve lifter with a
micrometer since valve lifter is in barrel shape.
VALVE LIFTER HOLE DIAMETER
Measure the inner diameter of valve lifter hole of cylinder head
with an inside micrometer.
VALVE LIFTER CLEARANCE
(Valve lifter clearance) = (Valve lifter hole diameter) – (Valve lifter outer diameter)
If the calculated value is out of the standard, referring to each standard of valve lifter outer diameter and
valve lifter hole diameter, replace either or both valve lifter and cylinder head. Limit : 0.15 mm (0.0059 in)
PBIC0930E
KBIA0182E
Standard (Intake and exhaust)
: 33.977 - 33.987 mm (1.3377 - 1.3381 in)
JEM798G
Standard (Intake and exhaust)
: 34.000 - 34.016 mm (1.3386 - 1.3392 in)
SEM867E
Standard (Intake and exhaust)
: 0.013 - 0.039 mm (0.0005 - 0.0015 in)