(6) Install the right cable to the front cable.
(7) Adjust the brake cable at the equalizer and
using the adjuster nut.
INSTALLATION - LEFT REAR CABLE
(1) Install the brake cable to the brake lever (Fig.
61).
(2) Install the brake cable to the frame bracket.
(3) Install the left brake cable to the equalizer.
(4) Adjust the brake cable at the equalizer and
adjuster nut.
SHOES
REMOVAL
(1) Raise and support the vehicle.
(2) Remove the tire and wheel assembly.
(3) Remove the disc brake caliper,(Refer to 5 -
BRAKES/HYDRAULIC/MECHANICAL/DISC
BRAKE CALIPERS - REMOVAL).
(4) Remove the disc brake rotor, (Refer to 5 -
BRAKES/HYDRAULIC/MECHANICAL/ROTORS -
REMOVAL).
(5) Lockout the parking brake cable (Fig. 63).
(6) Disengage the park brake cable from behind
the rotor assembly to allow easier disassembly of the
park brake shoes (Fig. 64).
(7) Remove the axleshaft (Fig. 65) (Refer to 3 -
DIFFERENTIAL & DRIVELINE/REAR AXLE - 9 1/4/
AXLE SHAFTS - REMOVAL).
(8) Disassemble the rear park brake shoes (Fig.
56).
CLEANING - REAR DRUM IN HAT BRAKE
Clean the individual brake components, including
the support plate exterior, with a water dampened
cloth or with brake cleaner. Do not use any other
cleaning agents. Remove light rust and scale from
the brake shoe contact pads on the support plate
with fine sandpaper.
INSPECTION - REAR DRUM IN HAT BRAKE
As a general rule, riveted brake shoes should be
replaced when worn to within 0.78 mm (1/32 in.) of
the rivet heads. Bonded lining should be replaced
when worn to a thickness of 1.6 mm (1/16 in.).
Examine the lining contact pattern to determine if
the shoes are bent or the drum is tapered. The lining
should exhibit contact across its entire width. Shoes
exhibiting contact only on one side should be
Fig. 62 PARKING BRAKE CABLE
1 - SUPPORT PLAT
2 - CABLE
3 - LEVER
Fig. 63 LOCK OUT PARKING CABLE
1 - LOCKING PLIERS
2 - PARKING BRAKE CABLE
Fig. 64 DISENGAGEMENT OF CABLE
1 - LEVER
2 - CABLE END
DRBRAKES - BASE 5 - 33
CABLES (Continued)
replaced and the drum checked for runout or taper
(Fig. 66).
Inspect the adjuster screw assembly. Replace the
assembly if the star wheel or threads are damaged,
or the components are severely rusted or corroded
(Fig. 66).
Discard the brake springs and retainer components
if worn, distorted or collapsed. Also replace the
springs if a brake drag condition had occurred. Over-
heating will distort and weaken the springs.
Inspect the brake shoe contact pads on the support
plate, replace the support plate if any of the pads are
worn or rusted through. Also replace the plate if it is
bent or distorted (Fig. 66).
INSTALLATION
NOTE: On a new vehicle or after parking brake lin-
ing replacement, it is recommended that the park-
ing brake system be conditioned prior to use. This
is done by making one stop from 25 mph on dry
pavement or concrete using light to moderate force
on the parking brake foot pedal.
(1) Reassemble the rear park brake shoes (Fig.
56).
(2) Install the axleshaft (Fig. 65) (Refer to 3 - DIF-
FERENTIAL & DRIVELINE/REAR AXLE - 9 1/4/
AXLE SHAFTS - INSTALLATION).
(3) Install the park brake cable to the lever behind
the support plate.
(4) Unlock the park brake cable.
(5) Install the disc brake rotor (Refer to 5 -
BRAKES/HYDRAULIC/MECHANICAL/ROTORS -
INSTALLATION).(6) Install the disc brake caliper (Refer to 5 -
BRAKES/HYDRAULIC/MECHANICAL/DISC
BRAKE CALIPERS - INSTALLATION).
(7) Adjust the rear brake shoes (Refer to 5 -
BRAKES/PARKING BRAKE/SHOES - ADJUST-
MENTS).
(8) Install the tire and wheel assembly (Refer to 22
- TIRES/WHEELS/WHEELS - STANDARD PROCE-
DURE).
(9) Lower the vehicle.
ADJUSTMENTS
ADJUSTMENT - PARKING BRAKE SHOES
CAUTION: Before adjusting the park brake shoes be
sure that the park brake pedal is in the fully
released position. If park brake pedal is not in the
fully released position, the park brake shoes can
not be accurately adjusted.
(1) Raise vehicle.
(2) Remove tire and wheel.
(3) Remove disc brake caliper from caliper adapter
(Refer to 5 - BRAKES/HYDRAULIC/MECHANICAL/
DISC BRAKE CALIPERS - REMOVAL).
(4) Remove rotor from the axleshaft (Refer to 5 -
BRAKES/HYDRAULIC/MECHANICAL/ROTORS -
REMOVAL).
Fig. 65 AXLE SHAFT
1 - AXLE SHAFT
2 - SUPPORT PLATE
3 - CALIPER
4 - PARK BRAKE SHOE ASSEMBLY
Fig. 66 PARK BRAKE SHOES
5 - 34 BRAKES - BASEDR
SHOES (Continued)
BIN - INSTALLATION, STORAGE.........23-62
BIN - INSTALLATION, UNDER SEAT
STORAGE...........................23-81
BIN - REMOVAL, STORAGE.............23-62
BIN - REMOVAL, UNDER SEAT STORAGE . . 23-81
BIN COVERING - INSTALLATION, UNDER
SEAT STORAGE......................23-81
BIN COVERING - REMOVAL, UNDER
SEAT STORAGE......................23-81
BIN LATCH - INSTALLATION, UNDER
SEAT STORAGE......................23-81
BIN LATCH - REMOVAL, UNDER SEAT
STORAGE...........................23-81
BLADE - DESCRIPTION, WIPER.........8R-19
BLADE - INSTALLATION, WIPER.........8R-20
BLADE - OPERATION, WIPER...........8R-19
BLADE - REMOVAL, WIPER............8R-19
BLEEDING - STANDARD PROCEDURE......5-27
BLEEDING - STANDARD PROCEDURE,
ABS BRAKE..........................5-40
BLEEDING - STANDARD PROCEDURE,
MANUAL.............................5-5
BLEEDING - STANDARD PROCEDURE,
MASTER CYLINDER...................5-20
BLEEDING - STANDARD PROCEDURE,
PRESSURE...........................5-5
BLEND DOOR - INSTALLATION..........24-25
BLEND DOOR - REMOVAL.............24-24
BLEND DOOR ACTUATOR -
DESCRIPTION.......................24-16
BLEND DOOR ACTUATOR -
INSTALLATION.......................24-17
BLEND DOOR ACTUATOR - OPERATION . . . 24-16
BLEND DOOR ACTUATOR - REMOVAL....24-17
BLOCK - CLEANING, ENGINE . 9-127,9-200,9-249,
9-38,9-380
BLOCK - DESCRIPTION, BLOWER
MOTOR RESISTOR...................24-17
BLOCK - DESCRIPTION, ENGINE.....9-126,9-37
BLOCK - INSPECTION, ENGINE....9-127,9-200,
9-249,9-38,9-380
BLOCK - INSTALLATION, BLOWER
MOTOR RESISTOR...................24-18
BLOCK - INSTALLATION, BRAKE
JUNCTION...........................5-19
BLOCK - OPERATION, BLOWER MOTOR
RESISTOR..........................24-17
BLOCK - REMOVAL, BLOWER MOTOR
RESISTOR..........................24-18
BLOCK - REMOVAL, BRAKE JUNCTION....5-19
BLOCK HEATER - 5.9L DIESEL -
DESCRIPTION, ENGINE.................7-43
BLOCK HEATER - 5.9L DIESEL -
INSTALLATION, ENGINE................7-44
BLOCK HEATER - 5.9L DIESEL -
OPERATION, ENGINE...................7-43
BLOCK HEATER - 5.9L DIESEL -
REMOVAL, ENGINE....................7-43
BLOCK HEATER - DESCRIPTION, ENGINE . . . 7-42
BLOCK HEATER - DIAGNOSIS AND
TESTING, ENGINE.....................7-42
BLOCK HEATER - INSTALLATION,
ENGINE.............................7-43
BLOCK HEATER - OPERATION, ENGINE....7-42
BLOCK HEATER - REMOVAL, ENGINE......7-43
BLOCK REFACING - STANDARD
PROCEDURE, CYLINDER
...............9-312
BLOWER MOTOR - DESCRIPTION
.......24-25
BLOWER MOTOR - DIAGNOSIS AND
TESTING
...........................24-26
BLOWER MOTOR - INSTALLATION
.......24-26
BLOWER MOTOR - OPERATION
.........24-25
BLOWER MOTOR - REMOVAL
...........24-26
BLOWER MOTOR RESISTOR -
DIAGNOSIS AND TESTING
.............24-18
BLOWER MOTOR RESISTOR BLOCK -
DESCRIPTION
.......................24-17
BLOWER MOTOR RESISTOR BLOCK -
INSTALLATION
.......................24-18
BLOWER MOTOR RESISTOR BLOCK -
OPERATION
.........................24-17
BLOWER MOTOR RESISTOR BLOCK -
REMOVAL
..........................24-18
BLOWER MOTOR SWITCH -
DESCRIPTION
.......................24-18
BLOWER MOTOR SWITCH - DIAGNOSIS
AND TESTING
.......................24-18BLOWER MOTOR SWITCH -
INSTALLATION.......................24-19
BLOWER MOTOR SWITCH - OPERATION . . 24-18
BLOWER MOTOR SWITCH - REMOVAL . . . 24-19
BODY - ADJUSTMENTS, VALVE . . 21-308,21-487
BODY - ASSEMBLY, VALVE......21-299,21-477,
21-590
BODY & CABLE - DESCRIPTION,
ANTENNA...........................8A-4
BODY & CABLE - INSTALLATION,
ANTENNA...........................8A-6
BODY & CABLE - OPERATION, ANTENNA . . . 8A-4
BODY & CABLE - REMOVAL, ANTENNA....8A-6
BODY - CLEANING, VALVE......21-298,21-476,
21-588
BODY - DESCRIPTION, THROTTLE.......14-45
BODY - DESCRIPTION, VALVE . . . 21-267,21-445,
21-584
BODY - DISASSEMBLY, VALVE . . . 21-287,21-465,
21-586
BODY - INSPECTION, VALVE....21-298,21-476,
21-588
BODY - INSTALLATION, THROTTLE.......14-47
BODY - INSTALLATION, VALVE . . . 21-307,21-486,
21-590
BODY - OPERATION, THROTTLE.........14-45
BODY - OPERATION, VALVE.....21-272,21-450,
21-585
BODY - REMOVAL, THROTTLE..........14-45
BODY - REMOVAL, VALVE . 21-286,21-464,21-585
BODY AND CABLE - DIAGNOSIS AND
TESTING, ANTENNA...................8A-4
BODY CODE PLATE - DESCRIPTION.....Intro.-4
BODY ISOLATORS - INSTALLATION......23-37
BODY ISOLATORS - REMOVAL..........23-36
BODY LUBRICATION - STANDARD
PROCEDURE.........................23-3
BODY OPENING DIMENSIONS -
SPECIFICATIONS.....................23-99
BODY PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC.................23-3
BODY SIDE MOLDINGS - INSTALLATION . . 23-36
BODY SIDE MOLDINGS - REMOVAL......23-36
BODY, SPECIAL TOOLS................23-14
BODY VENT - INSTALLATION...........23-72
BODY VENT - REMOVAL...............23-72
BOOST PRESSURE - DIAGNOSIS AND
TESTING, TURBOCHARGER.............11-10
BOOSTER - DESCRIPTION, POWER
BRAKE..............................5-25
BOOSTER - DIAGNOSIS AND TESTING,
HYDRAULIC..........................5-25
BOOSTER - DIAGNOSIS AND TESTING,
MASTER CYLINDER/POWER.............5-20
BOOSTER - INSTALLATION, HYDRO-
BOOST BRAKE........................5-27
BOOSTER - INSTALLATION, POWER
BRAKE..............................5-25
BOOSTER - OPERATION, POWER BRAKE . . . 5-25
BOOSTER - REMOVAL, HYDRO-BOOST
BRAKE..............................5-27
BOOSTER - REMOVAL, POWER BRAKE....5-25
BOOT - INSTALLATION, 4WD FLOOR
SHIFT..............................23-64
BOOT - INSTALLATION, EXTENSION
HOUSING SEAL AND DUST......21-652,21-716
BOOT - REMOVAL, 4WD FLOOR SHIFT....23-63
BOOT - REMOVAL, EXTENSION HOUSING
SEAL AND DUST..............21-652,21-716
BORE - DE-GLAZE - STANDARD
PROCEDURE, CYLINDER...............9-313
BORE HONING - STANDARD
PROCEDURE, CYLINDER . 9-126,9-233,9-360,9-37
BORE REPAIR - STANDARD
PROCEDURE, CAM...................9-315
BORE REPAIR - STANDARD
PROCEDURE, CYLINDER...............9-313
BOX - INSTALLATION, CARGO..........23-37
BOX - INSTALLATION, GLOVE...........23-53
BOX - REMOVAL, CARGO..............23-37
BOX - REMOVAL, GLOVE..............23-53
BOX - TIE DOWN - INSTALLATION,
CARGO
............................23-37
BOX - TIE DOWN - REMOVAL, CARGO
....23-37
BOX LAMP/SWITCH - INSTALLATION,
GLOVE
.............................8L-25
BOX LAMP/SWITCH - REMOVAL, GLOVE
. . 8L-25
BOX LATCH - INSTALLATION, GLOVE
.....23-53BOX LATCH - REMOVAL, GLOVE.........23-53
B-PILLAR GRAB HANDLE -
INSTALLATION.......................23-69
B-PILLAR GRAB HANDLE - REMOVAL....23-69
B-PILLAR LOWER TRIM - INSTALLATION . . 23-65
B-PILLAR LOWER TRIM - REMOVAL.....23-64
B-PILLAR UPPER TRIM - INSTALLATION . . 23-65
B-PILLAR UPPER TRIM - REMOVAL......23-65
BRACKET - INSTALLATION, REARVIEW
MIRROR SUPPORT...................23-71
BRACKET - INSTALLATION, STEERING
COLUMN OPENING SUPPORT...........23-62
BRACKET - REMOVAL, STEERING
COLUMN OPENING SUPPORT...........23-61
BRACKETS - INSTALLATION, SEAT BACK
REAR - FOOTMANS LOOP..............23-85
BRACKETS - REMOVAL, SEAT BACK
REAR - FOOTMANS LOOP..............23-85
BRAKE - CLEANING, REAR DRUM IN
HAT ................................5-33
BRAKE - DESCRIPTION, CONTROLLER
ANTILOCK...........................8E-3
BRAKE - DESCRIPTION, PARKING........5-30
BRAKE - INSPECTION, REAR DRUM IN
HAT ................................5-33
BRAKE - INSTALLATION, CONTROLLER
ANTILOCK...........................8E-3
BRAKE - OPERATION, CONTROLLER
ANTILOCK...........................8E-3
BRAKE - OPERATION, PARKING..........5-30
BRAKE - REMOVAL, CONTROLLER
ANTILOCK...........................8E-3
BRAKE BLEEDING - STANDARD
PROCEDURE, ABS.....................5-40
BRAKE BOOSTER - DESCRIPTION,
POWER.............................5-25
BRAKE BOOSTER - INSTALLATION,
HYDRO-BOOST.......................5-27
BRAKE BOOSTER - INSTALLATION,
POWER.............................5-25
BRAKE BOOSTER - OPERATION, POWER . . . 5-25
BRAKE BOOSTER - REMOVAL,
HYDRO-BOOST.......................5-27
BRAKE BOOSTER - REMOVAL, POWER....5-25
BRAKE CABLE - INSTALLATION, FRONT
PARKING............................5-32
BRAKE CABLE - INSTALLATION, REAR
PARK...............................5-32
BRAKE CABLE - REMOVAL, FRONT
PARKING............................5-31
BRAKE CABLE - REMOVAL, REAR PARK . . . 5-31
BRAKE CALIPER ADAPTER MOUNT -
INSTALLATION, DISC...................5-17
BRAKE CALIPERS - DESCRIPTION, DISC . . . 5-11
BRAKE CALIPERS - OPERATION, DISC.....5-12
BRAKE FLUID CONTAMINATION -
DIAGNOSIS AND TESTING..............5-18
BRAKE FLUID LEVEL - STANDARD
PROCEDURE.........................5-18
BRAKE FLUID, SPECIFICATIONS..........5-18
BRAKE HOSE - INSTALLATION, FRONT......5-9
BRAKE HOSE - INSTALLATION, REAR.......5-9
BRAKE HOSE - REMOVAL, REAR..........5-8
BRAKE INDICATOR - DESCRIPTION,
BRAKE/PARK........................8J-18
BRAKE INDICATOR - DIAGNOSIS AND
TESTING...........................8J-19
BRAKE INDICATOR - OPERATION,
BRAKE/PARK........................8J-19
BRAKE JUNCTION BLOCK -
INSTALLATION........................5-19
BRAKE JUNCTION BLOCK - REMOVAL.....5-19
BRAKE LAMP - INSTALLATION...........8L-8
BRAKE LAMP - REMOVAL...............8L-8
BRAKE LAMP SWITCH - DESCRIPTION....8L-8
BRAKE LAMP SWITCH - DIAGNOSIS
AND TESTING........................8L-9
BRAKE LAMP SWITCH - INSTALLATION . . . 8L-10
BRAKE LAMP SWITCH - OPERATION......8L-8
BRAKE LAMP SWITCH - REMOVAL.......8L-9
BRAKE PADS/SHOES - INSTALLATION.....5-10
BRAKE PADS/SHOES - REMOVAL
.........5-10
BRAKE PROPORTIONING -
DESCRIPTION, ELECTRONIC VARIABLE
....5-43
BRAKE PROPORTIONING - OPERATION,
ELECTRONIC VARIABLE
................5-43
BRAKE SHOES - ADJUSTMENT, PARKING
. . 5-34
BRAKE, SPECIFICATIONS - BASE
..........5-7
4 INDEXDR
Description Group-Page Description Group-Page Description Group-Page
OVERDRIVE UNIT - DISASSEMBLY.....21-220,
21-399
OVERDRIVE UNIT - INSPECTION . 21-227,21-406
OVERDRIVE UNIT - INSTALLATION.....21-236,
21-414
OVERDRIVE UNIT - REMOVAL . . . 21-220,21-398
OVERFLOW VALVE - DESCRIPTION,
CASCADE...........................14-77
OVERFLOW VALVE - OPERATION,
CASCADE...........................14-77
OVERHEAD CONSOLE - DESCRIPTION....8M-1
OVERHEAD CONSOLE - DIAGNOSIS AND
TESTING............................8M-2
OVERHEAD CONSOLE - OPERATION......8M-2
OVERHEAD CONSOLE REMOVAL,
REMOVAL...........................8M-5
OVERHEAD CONSOLE, SPECIAL TOOLS . . . 8M-6
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
ASSEMBLY...................21-239,21-416
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
CLEANING...................21-238,21-416
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
DESCRIPTION................21-237,21-415
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
DISASSEMBLY................21-238,21-415
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
INSPECTION.................21-238,21-416
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
OPERATION..................21-237,21-415
OXYGEN SENSOR - DESCRIPTION.......14-43
OXYGEN SENSOR - INSTALLATION.......14-45
OXYGEN SENSOR - OPERATION.........14-43
OXYGEN SENSOR - REMOVAL..........14-44
PADS/SHOES - INSTALLATION, BRAKE.....5-10
PADS/SHOES - REMOVAL, BRAKE........5-10
PAINT CODE - DESCRIPTION...........23-74
PAINT CODES - SPECIFICATIONS........23-74
PAINT TOUCH-UP - DESCRIPTION.......23-75
PAINT TOUCH-UP - STANDARD
PROCEDURE........................23-75
PAN - CLEANING, OIL . . . 9-270,9-342,9-397,9-65
PAN - DESCRIPTION, OIL...............9-65
PAN - INSPECTION, OIL . 9-271,9-342,9-397,9-66
PAN - INSTALLATION, OIL . . . 9-153,9-217,9-271,
9-342,9-398,9-66
PAN - REMOVAL, OIL . . 9-153,9-217,9-270,9-342,
9-397,9-65
PANEL - INSTALLATION, TRIM.....23-24,23-33
PANEL - REMOVAL, TRIM.........23-24,23-33
PANEL ANTENNA CABLE -
INSTALLATION, INSTRUMENT............8A-7
PANEL ANTENNA CABLE - REMOVAL,
INSTRUMENT........................8A-6
PANEL ASSEMBLY - INSTALLATION,
INSTRUMENT.......................23-56
PANEL ASSEMBLY - REMOVAL,
INSTRUMENT.......................23-53
PANEL CENTER BEZEL - INSTALLATION,
INSTRUMENT
.......................23-58
PANEL CENTER BEZEL - REMOVAL,
INSTRUMENT
.......................23-58
PANEL DRIVER SIDE BEZEL -
INSTALLATION, INSTRUMENT
...........23-59
PANEL DRIVER SIDE BEZEL - REMOVAL,
INSTRUMENT
.......................23-58
PANEL DUCTS - INSTALLATION,
INSTRUMENT
.......................24-29
PANEL DUCTS - REMOVAL,
INSTRUMENT
.......................24-29
PANEL HEADLAMP SWITCH BEZEL -
INSTALLATION, INSTRUMENT
...........23-57
PANEL HEADLAMP SWITCH BEZEL -
REMOVAL, INSTRUMENT
..............23-57
PANEL LOWER SURROUND -
INSTALLATION, INSTRUMENT
...........23-60
PANEL LOWER SURROUND - REMOVAL,
INSTRUMENT
.......................23-60
PANEL OUTLETS - INSTALLATION
.......24-24
PANEL OUTLETS - REMOVAL
...........24-24
PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC BODY
............23-3PANEL TOP COVER - INSTALLATION,
INSTRUMENT.......................23-60
PANEL TOP COVER - REMOVAL,
INSTRUMENT.......................23-59
PANEL TRIM - INSTALLATION, REAR
CAB BACK..........................23-70
PANEL TRIM - REMOVAL, REAR CAB
BACK..............................23-70
PARK BRAKE CABLE - INSTALLATION,
REAR...............................5-32
PARK BRAKE CABLE - REMOVAL, REAR . . . 5-31
PARK LAMP RELAY - DESCRIPTION......8L-19
PARK LAMP RELAY - DIAGNOSIS AND
TESTING...........................8L-20
PARK LAMP RELAY - INSTALLATION.....8L-21
PARK LAMP RELAY - OPERATION.......8L-19
PARK LAMP RELAY - REMOVAL.........8L-20
PARKING BRAKE - DESCRIPTION.........5-30
PARKING BRAKE - OPERATION...........5-30
PARKING BRAKE CABLE -
INSTALLATION, FRONT.................5-32
PARKING BRAKE CABLE - REMOVAL,
FRONT..............................5-31
PARKING BRAKE SHOES - ADJUSTMENT . . . 5-34
PARK/TURN SIGNAL LAMP -
INSTALLATION.......................8L-21
PARK/TURN SIGNAL LAMP - REMOVAL . . . 8L-21
PARTS - STANDARD PROCEDURES,
CLEANING FUEL SYSTEM..............14-58
PASSENGER AIRBAG - DESCRIPTION....8O-34
PASSENGER AIRBAG - INSTALLATION....8O-37
PASSENGER AIRBAG - OPERATION......8O-35
PASSENGER AIRBAG - REMOVAL........8O-35
PASSENGER AIRBAG ON/OFF SWITCH -
DESCRIPTION.......................8O-38
PASSENGER AIRBAG ON/OFF SWITCH -
INSTALLATION......................8O-39
PASSENGER AIRBAG ON/OFF SWITCH -
OPERATION.........................8O-38
PASSENGER AIRBAG ON/OFF SWITCH -
REMOVAL..........................8O-39
PASSENGER SEAT SWITCH -
DESCRIPTION.......................8N-16
PASSENGER SEAT SWITCH - DIAGNOSIS
AND TESTING.......................8N-17
PASSENGER SEAT SWITCH -
INSTALLATION......................8N-18
PASSENGER SEAT SWITCH - OPERATION . 8N-17
PASSENGER SEAT SWITCH - REMOVAL . . . 8N-17
PATTERNS - DIAGNOSIS AND TESTING,
TIRE WEAR..........................22-8
PCM - DESCRIPTION...................8E-8
PCM - OPERATION...................8E-11
PCM INPUT - OPERATION, ASD SENSE.....8I-6
PCM OUTPUT - DESCRIPTION............8I-6
PCM OUTPUT - OPERATION............14-32
PCM OUTPUT - OPERATION.............8I-6
PCM/SKIM PROGRAMMING - STANDARD
PROCEDURE........................8E-14
PCV VALVE - 3.7L V-6/ 4.7L V-8 -
DIAGNOSIS AND TESTING.............25-19
PCV VALVE - 5.9L V-8 - DIAGNOSIS AND
TESTING...........................25-19
PCV VALVE - DESCRIPTION............25-16
PCV VALVE - OPERATION..............25-17
PEDAL - DESCRIPTION.................5-22
PEDAL - INSTALLATION
............5-23,5-36
PEDAL - INSTALLATION, ACCELERATOR
. . . 14-24
PEDAL - OPERATION
...................5-22
PEDAL - REMOVAL
................5-23,5-36
PEDAL - REMOVAL, ACCELERATOR
......14-24
PEDAL MOTOR - DESCRIPTION,
ADJUSTABLE
.........................5-24
PEDAL MOTOR - INSTALLATION,
ADJUSTABLE
.........................5-24
PEDAL MOTOR - REMOVAL,
ADJUSTABLE
.........................5-24
PEDAL POSITION SENSOR -
DESCRIPTION, ACCELERATOR
..........14-25
PEDAL POSITION SENSOR -
INSTALLATION, ACCELERATOR
..........14-25
PEDAL POSITION SENSOR - OPERATION,
ACCELERATOR
.......................14-25
PEDAL POSITION SENSOR - REMOVAL,
ACCELERATOR
.......................14-25
PEDAL POSITION SWITCH -
DESCRIPTION, CLUTCH
.................6-14PEDAL POSITION SWITCH - DIAGNOSIS
AND TESTING, CLUTCH.................6-14
PEDAL POSITION SWITCH - OPERATION,
CLUTCH.............................6-14
PEDAL SWITCH - INSTALLATION,
ADJUSTABLE..........................5-6
PEDAL SWITCH - REMOVAL,
ADJUSTABLE..........................5-6
PER MILE, SPECIFICATIONS - TIRE
REVOLUTIONS.......................22-10
PERFORMANCE - DIAGNOSIS AND
TESTING, A/C........................24-2
PERFORMANCE - DIAGNOSIS AND
TESTING, ENGINE DIAGNOSIS.....9-179,9-226,
9-354,9-4,9-89
PERFORMANCE - DIAGNOSIS AND
TESTING, HEATER.....................24-5
PILOT BEARING - INSTALLATION.........6-12
PILOT BEARING - REMOVAL.............6-12
PINION GEAR/RING GEAR -
INSTALLATION....................3-42,3-66
PINION GEAR/RING GEAR - REMOVAL . 3-40,3-65
PINION GEAR/RING GEAR/TONE RING -
INSTALLATION..............3-123,3-150,3-96
PINION GEAR/RING GEAR/TONE RING -
REMOVAL.................3-122,3-149,3-94
PINION SEAL - INSTALLATION . 3-113,3-140,3-35,
3-60,3-85
PINION SEAL - REMOVAL....3-113,3-140,3-34,
3-60,3-85
PIPE - INSPECTION, EXHAUST...........11-7
PIPE - INSTALLATION, EXHAUST.........11-7
PIPE - REMOVAL, EXHAUST.............11-7
PISTON & CONNECTING ROD -
CLEANING...........9-138,9-206,9-261,9-389
PISTON & CONNECTING ROD -
DESCRIPTION . . . 9-137,9-205,9-260,9-329,9-388,
9-47
PISTON & CONNECTING ROD -
INSPECTION.........9-138,9-206,9-261,9-389
PISTON & CONNECTING ROD -
INSTALLATION........9-139,9-207,9-261,9-389
PISTON & CONNECTING ROD -
REMOVAL......9-137,9-205,9-261,9-330,9-389
PISTON AND CONNECTING ROD -
CLEANING..........................9-331
PISTON FITTING - STANDARD
PROCEDURE.....9-137,9-205,9-260,9-389,9-50
PISTON RETAINER - ASSEMBLY,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-239,21-416
PISTON RETAINER - CLEANING,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-238,21-416
PISTON RETAINER - DESCRIPTION,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-237,21-415
PISTON RETAINER - DISASSEMBLY,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-238,21-415
PISTON RETAINER - INSPECTION,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-238,21-416
PISTON RETAINER - OPERATION,
OVERRUNNING CLUTCH CAM/
OVERDRIVE..................21-237,21-415
PISTON RING FITTING - STANDARD
PROCEDURE.....9-140,9-207,9-262,9-333,9-52
PISTON RINGS - STANDARD
PROCEDURE, FITTING.................9-390
PISTONS - DESCRIPTION . 21-241,21-418,21-569
PISTONS - INSPECTION...............9-331
PISTONS - OPERATION . . . 21-241,21-418,21-569
PITMAN ARM - INSTALLATION..........19-36
PITMAN ARM - REMOVAL.............19-35
PLANETARY GEARTRAIN - ASSEMBLY . . . 21-573
PLANETARY GEARTRAIN - CLEANING....21-573
PLANETARY GEARTRAIN - DESCRIPTION . 21-571
PLANETARY GEARTRAIN -
DISASSEMBLY......................21-573
PLANETARY GEARTRAIN - INSPECTION
. . 21-573
PLANETARY GEARTRAIN - OPERATION
. . 21-571
PLANETARY GEARTRAIN/OUTPUT SHAFT
- ASSEMBLY
.................21-245,21-423
PLANETARY GEARTRAIN/OUTPUT SHAFT
- DESCRIPTION
...............21-242,21-420
PLANETARY GEARTRAIN/OUTPUT SHAFT
- DISASSEMBLY
..............21-243,21-421
24 INDEXDR
Description Group-Page Description Group-Page Description Group-Page