2001 TOYOTA SEQUOIA oil filter

[x] Cancel search: oil filter

Page 52 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual MA004±18
P08488
Back Front
± MAINTENANCEENGINE
MA±5
52 Author: Date:
2005 SEQUOIA   (RM1146U)
ENGINE
INSPECTION
HINT:
Perform the following procedures when the engine is cold.
1. REPLACE TIMING B

Page 76 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual PP24A±06
PP±18
± PREPARATIONLUBRICATION
76 Author: Date:
2005 SEQUOIA   (RM1146U)
LUBRICATION
SST (Special Service Tools)
09032±00100Oil Pan Seal Cutter
09228±07501Oil Filter Wrench
09316±6001

Page 79 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual PP1AW±08
± PREPARATIONLUBRICATION
PP±21
79 Author: Date:
2005 SEQUOIA   (RM1146U)
LUBRICANT
ItemCapacityClassification
Engine oil
  Dry fill
  Drain and refill
w/ Oil filter change
w/o Oil filter

Page 159 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual SS0OC±05
± SERVICE SPECIFICATIONSLUBRICATION
SS±17
159 Author: Date:
2005 SEQUOIA   (RM1146U)
TORQUE SPECIFICATION
Part tightenedN´mkgf´cmft´lbf
No.2 oil pan x Drain plug3940029
Oil pump body

Page 207 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual ± DIAGNOSTICSENGINE
DI±13
207 Author: Date:
2005 SEQUOIA   (RM1146U)
4 Check air filter.
PREPARATION:
Remove the air filter.
CHECK:
Visual check that the air filter is not excessively dirty or oil

Page 275 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual ± DIAGNOSTICSENGINE
DI±81
275 Author: Date:
2005 SEQUOIA   (RM1146U)
1 Check operation of OCV.
PREPARATION:
(a) Connect  the hand±held tester to the DLC3.
(b) Start the engine and warm it up.
(c)

Page 277 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual A02852
A23658
± DIAGNOSTICSENGINE
DI±83
277 Author: Date:
2005 SEQUOIA   (RM1146U)
5 Check VVT controller assembly.
PREPARATION:
(a) Remove the timing belt (See page EM±16).
(b) Remove the cylind

Page 278 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual DI±84
± DIAGNOSTICSENGINE
278 Author: Date:
2005 SEQUOIA   (RM1146U)
7 Check whether or not DTC P0010, P0012, P0021 or P0022 is stored.
PREPARATION:
(a) Clear the DTC (See page DI±43).
(b) Perfor
Page:   1-8 9-16 17-24 25-32 32 next >