6A-22 ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE)
Valve Springs
Referring to data given below, check to be sure that each spring
is in sound condition, free of any evidence of breakage or weak-
ening. Remember, weakened valve springs can cause chatter,
not to mention possibility of reducing power output due to gas
leakage caused by decreased seating pressure.
Item
StandardLimit
Valve spring
free length42.29 mm
(1.6649 in.)41.0 mm
1.6142 in.)
Valve spring
preload
209 – 235 N
(20.9 – 23.5 kg) at
32.6 mm (46.1 –
51.8 lb at 1.28 in.)187 N (18.7 kg)
at 32.6 mm
(41.2 lb at 1.28 in.)
Spring squareness:
Use a square and surface plate to check each spring for square-
ness in terms of clearance between end of valve spring and
square. Valve spring found to exhibit a larger clearance than limit
must be replaced.
Valve spring
2 0 mm (0 079 in )g
squareness limit.2.0 mm (0.079 in.)
1. Rear mounting
2. Left mounting
3. Left mounting bracket
4. Right mounting
5. Right mounting bracket
For M / T model
For A / T model
1. Rear mounting
2. Rear mounting No.2
bracket
3. Rear mounting No.1
bracket
4. Left mounting No.1
bracket
5. Stopper6. Left mounting
7. Left mounting No.2
bracket
8. Right mounting bracket
9. Right mounting
10. Torque rod bracket
11. Stiffener
12. Torque rod
ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE) 6A-25
11) Disconnect the following cables.
Accelerator cable from throttle body.
Clutch cable from transmission. (For M / T model)
Gear select cable and oil pressure control cable from trans-
mission. (For A / T model)
Speedometer cable from transmission.
12) Hoist vehicle.
13) Remove fender apron extensions.
14) Remove exhaust pipe from exhaust manifold (or WU-TWC).
15) Remove gear shift control shaft from transmission and remove
extension rod. (For M / T model)
16) Drain engine oil and transmission oil.
17) Remove drive shaft joints from differential gears of transmis-
sion.
Refer to Section 4 (DRIVE SHAFT) for procedure to disconnect
drive shaft joints.
For engine and transmission removal, it is not necessary to re-
move drive shafts from steering knuckle.
18) Remove A / C compressor (if equipped) from compressor
bracket with hose still attached.
NOTE:
Suspend removed A / C compressor at a place where no
damage will be caused during removal / installation of en-
gine with transmission.
19) Remove engine rear torque rod bracket from transmission.
(For A / T model)
20) Lower vehicle.
21) Install lifting device.
22) Remove rear mounting from body.
23) Remove left side engine mounting and bracket. (For M / T mod-
el)
Remove left mounting from body. (For A / T model)
24) Remove right side engine mounting from its bracket.
25) Before removing engine with transmission, recheck to make
sure all hoses, electric wires and cables are disconnected from
engine and transmission.
26) Remove engine with transmission from body.
2. Upper half of bearing
(a)
6A-28 ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE)
INSTALLATION
NOTE:
All parts to be installed must be perfectly clean.
Be sure to oil crankshaft journals, journal bearings, thrust
bearings, crankpins, connecting rod bearings, pistons, pis-
ton rings and cylinder bores.
Journal bearings, bearing caps, connecting rods, rod bear-
ings, rod bearing caps, pistons and piston rings are in com-
bination sets. Do not disturb combination and try to see that
each part goes back to where it came from, when installing.
1) Fit main bearings to cylinder block (1).
Among two halves of main bearing, one halt has oil groove (3).
Install this half with oil groove to cylinder block, and another half
without oil groove to bearing cap.
Make sure that two halves are painted in the same color.
2) Fit thrust bearings (1) to cylinder block between No.2 and No.3
cylinders. Face oil groove (2) sides to crank webs.
3) Put crankshaft on cylinder block.
4) Fit bearing caps sequentially in ascending order, 1, 2, 3 and 4,
starting from pulley side. Be sure to point arrow mark (2) (on
each cap) to crankshaft pulley side (1).
Gradual and uniform tightening is important for bearing cap
bolts. Make sure that four caps become tight equally and pro-
gressively till specified torque is attained.
Tightening Torque
(a): 53 N
.m (5.3 kg-m, 38.5 lb-ft)
NOTE:
After tightening cap bolts, check to be sure that crankshaft
rotates smoothly when turned by hand.
ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE) 6A-29
5) Install oil seal housing and its gasket.
Install new gasket. Do not reuse gasket removed in disassem-
bly. Oil lip portion of oil seal before installing. Tighten housing
bolts to specification.
After installing oil seal housing, gasket edges might bulge out;
if so, cut them off to make them flush with cylinder block and
oil seal housing.
Tightening Torque
(b): 12 N
.m (1.2 kg-m, 9.0 lb-ft)
6) Install oil pump.
Refer to item “Oil pump” for installation of oil pump.
7) Install flywheel (M / T model) or drive plate (A / T model).
Using special tool, lock flywheel and torque its bolts (1) to spec-
ification.
Special Tool
(A): 09924-17810
Tightening Torque
(c): 78 N
.m (7.8 kg-m, 56.5 lb-ft)
8) Install pistons and connecting rods as previously outlined.
9) Install oil pump strainer and oil pan.
10) Install cylinder head assembly to cylinder block (1).
Before installing cylinder head assembly to cylinder block,
install check valve (2) into oil gallery in cylinder block, directing
slit of valve toward top of cylinder block.
NOTE:
Tighten cylinder head bolts to specified torque as pre-
viously outlined.
Whenever installing cylinder head to new cylinder block,
use following procedure to tighten cylinder head bolts.
Tighten cylinder head bolts to specified torque as pre-
viously outlined and loosen them once till tightening
torque becomes “zero”. And then torque them to specifi-
cation again.
11) Install crankshaft timing belt pulley, timing belt, crankshaft
pulley, water pump pulley, etc., as previously outlined.
12) Install clutch to flywheel (M / T model).
For clutch installation, refer to Section 7C.
13) Install engine with transmission to body as previously outlined.
6A1
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-1
SECTION 6A1
ENGINE MECHANICAL
(G13B, 1-CAM 16-VALVES ENGINE)
WARNING:
For vehicles equipped with Supplement Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either or these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
GENERAL DESCRIPTION6A1- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine6A1- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Lubrication6A1- 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Block6A1- 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crankshaft and Main Bearings 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pistons, Rings, Piston Pins and Connecting Rods 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Head and Value Train 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ON VEHICLE SERVICE6A1- 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compression Check6A1- 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Vacuum Check6A1- 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pressure Check6A1- 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valve Lash (Clearance)6A1- 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Cleaner Element6A1-11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Cleaner Outlet Hose6A1-12 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Head Cover6A1-13 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Throttle Body and Intake Manifold 6A1-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exhaust Manifold6A1-17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Timing Belt and Belt Tensioner 6A1-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pan and Oil Pump Strainer 6A1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pump6A1-28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rocker Arms, Rocker Arm Shaft and Camshaft 6A1-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valves and Cylinder Head6A1-41 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Piston, Piston Rings, Connecting Rods and Cylinders 6A1-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
UNIT REPAIR OVERHAUL6A1-64 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Assembly6A1-64 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Main Bearings, Crankshaft and Cylinder Block 6A1-68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPECIAL TOOLS6A1-80 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REQUIRED SERVICE MATERIALS6A1-81 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE SPECIFICATIONS6A1-82 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NOTE:
For what each abbreviation stands for (i.e., full term), refer to SECTION 0A.
1
2
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-5
ON-VEHICLE SERVICE
COMPRESSION CHECK
Check compression pressure on all four cylinders as follows:
1) Warm up engine.
2) Stop engine after warming up.
NOTE:
After warming up engine, place transmission gear shift le-
ver in “Neutral” (shift selector lever to “P” range for A / T
model), and set parking brake and block drive wheels.
3) Remove ignition coil assemblies (1) and all spark plugs (2) refer-
ring to Section 6F.
WARNING:
Failure in disconnecting couplers from ignition coil as-
semblies can cause spark to occur in engine room possi-
bly resulting in a dangerous explosion.
4) Disconnect fuel injector wire harness at couplers (2).
5) Install special tools (Compression gauge) into spark plug hole.
Special Tool
(A): 09915-64510-001
(B): 09915-64510-002
(C): 09915-64530
(D): 09915-67010
6) Disengage clutch (to lighten starting load on engine) for M / T
model, and depress accelerator pedal all the way to make
throttle valve full-open.
7) Crank engine with fully charged battery, and read the highest
pressure on compression gauge.
Compression pressure
Standard1400 kPa
(14.0 kg / cm
2, 199.0 psi)
Limit1100 kPa
(11.0 kg / cm
2, 156.4 psi)
Max. difference between any
two cylinders100 kPa
(1.0 kg / cm
2, 14.2 psi)
8) Carry out steps 5) through 7) on each cylinder to obtain four
readings.
9) After checking, connect couplers to fuel injectors securely and
install spark plugs and ignition coil assemblies.
6A1-6 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
ENGINE VACUUM CHECK
The engine vacuum that develops in the intake line is a good indica-
tor of the condition of the engine. The vacuum checking procedure
is as follows:
1) Warm up engine to normal operating temperature.
NOTE:
After warming up engine, place transmission gear shift le-
ver in “Neutral” (shift selector lever to “P” range for A / T
model), and set parking brake and block drive wheels.
2) With engine stopped, disconnect EVAP canister purge valve
hose from intake manifold and connect 3-way joint, hoses and
special tools (vacuum gauge and joint) between intake manifold
and vacuum hose disconnected.
Special Tool
(A): 09915-67311
(B): 09918-08210
SUZUKI GENUINE PARTS
(C): Hose 09343-03087
(D): 3-way joint 09367-04002
3) Run engine at specified idle speed, and read vacuum gauge.
Vacuum should be within the following specification.
Vacuum specification (at sea level):
52.6 – 65.8 kPa (40 – 50 cmHg, 15.7 – 19.7 in.Hg) at specified
idling speed
4) After checking, connect vacuum hose to intake surge tank.
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-7
OIL PRESSURE CHECK
NOTE:
Prior to checking oil pressure, check the following items.
Oil level in oil pan.
If oil level is low, add oil up to Full level mark on oil level
gauge.
Oil quality.
If oil is discolored, or deteriorated, change it.
For particular oil to be used, refer to the table in Section 0B.
Oil leaks.
If leak is found, repair it.
1) Remove oil pressure switch (1) from cylinder block.
2) Install special tool (Oil pressure gauge) to vacated threaded
hole.
Special Tool
(A): 09915-77311
3) Start engine and warm it up to normal operating temperature.
NOTE:
Be sure to place transmission gear shift lever in “Neutral”
(shift selector lever to “P” range for A / T model), and set
parking brake and block drive wheels.
4) After warming up, raise engine speed to 4,000 r / min and mea-
sure oil pressure.
Oil pressure specification:
360 – 440 kPa (3.6 – 4.4 kg / cm
2, 51.2 – 62.6 psi) at 4,000 r / min
(rpm)
5) Stop engine and remove oil pressure gauge.