2000 SUZUKI SWIFT generator

[x] Cancel search: generator

Page 337 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 6A1-42 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
Ignition coil assembly
Ground wires from 
intake manifold
EVAP canister purge
valve
ECT sensorInjectors, TP sensor and
IAC valve wires at t

Page 360 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-65
12) Disconnect the following electric wires:
Ignition coil assembly
Ground wires from intake manifold
Engine oil pressure switch
EVAP canist

Page 475 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 1. Pickup coil
2. Signal rotor
3. Screws
1. Distributor
2. Coupler
3. Ohmmeter
6F-8 IGNITION SYSTEM
DISTRIBUTOR
DISTRIBUTOR CAP AND ROTOR
INSPECTION
Check cap and rotor for crack and their terminals f

Page 477 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 1. Cap
2. Cap seal
3. Cap screw
4. Rotor
5. CMP sensor 
(Signal generator)
6. Screw
7. Cover
8. Housing
9. O-ring
A: Slot offset
1. Distributor case
2. O-ring3. Distributor coupling
4. Camshaft
6F-10

Page 535 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual NOTE:
Terminal arrangement of coupler viewed from harness side.
Coupler A
1. To generator W / R
2. To ignition switch B / W
3. To ECM V / G
4. To ECM V
5. Blank –
6. To ECT sensor Y / W
7. Blank —
Page:   < prev 1-8 9-16