2000 DODGE NEON Cooling system

[x] Cancel search: Cooling system

Page 1251 of 1285

DODGE NEON 2000  Service Repair Manual (1) Discharge refrigerant system using recovery/re-
cycling equipment if charge is present.
(2) Disconnect refrigerant lines from A/C compres-
sor. Cap the open lines to prevent moisture from
entering

Page 1253 of 1285

DODGE NEON 2000  Service Repair Manual BLOWER MOTOR RESISTOR
CAUTION: Stay clear of the blower motor and resis-
tor block (Hot). Do not operate the blower motor
with the resistor block removed.
REMOVAL
(1) Remove windshield wipers.
(2) Rem

Page 1259 of 1285

DODGE NEON 2000  Service Repair Manual REMOVAL
(1) Remove the wire connector from the low pres-
sure cut-off switch.
(2) Remove the center bolt of refrigerant line
plumbing sealing plate (Fig. 37).
(3) Carefully pull the refrigerant line-s

Page 1263 of 1285

DODGE NEON 2000  Service Repair Manual (3) Remove line at expansion valve.
(4) Remove line at compressor (Fig. 46).
INSTALLATION
For installation, reverse the above procedures.
TEMPERATURE CONTROL CABLE
The Control Cable can be removed and

Page 1268 of 1285

DODGE NEON 2000  Service Repair Manual HEATING AND AIR CONDITIONING
TABLE OF CONTENTS
page page
REMOVAL AND INSTALLATION
EVAPORATOR CORE ± R. H. D...............1
HEATER CORE ± R. H. D....................3SPECIFICATIONS
TORQUE SPECIFICAT

Page 1270 of 1285

DODGE NEON 2000  Service Repair Manual (7) Install the A/C-Heater housing retaining fas-
teners. Torque the fasteners to 20 N´m (177 in. lbs.).
(8) Install the heater core coolant supply hoses on
the heater core (Fig. 5).
(9) Install the

Page 1273 of 1285

DODGE NEON 2000  Service Repair Manual (12) Install the instrument panel. Refer to Group
8E, Instrument Panel and Systems for the procedure.
(13) Charge the refrigerant system.
(14) Fill the cooling system. Refer to Group 7,
Cooling System
Page:   < prev 1-10 ... 33-40 41-48 49-56 57-64 65-72