Page 741 of 2490

Installation
19.70.28.
15. Remove the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
16. Remove the coolant output pipe. Refer to Operation (SC)
26.31.08.
17. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
18. Remove the supercharger as sembly. Refer to operation
18.50.15.
19. Remove the B-Bank intercooler. Refer to Operation 18.50.19.
20. Disconnect the fuel injector harness.
1. Disconnect the multi-plugs from the B-Bank injectors.
2. Loosen, do not remove, the nuts which secure the
harness to the camshaft cover.
3. Reposition the harness for access.
21. Remove the fuel rail.
1. Remove the three bolts whic h secure the fuel rail to
the intercooler adaptor.
2. Remove the fuel rail from the adaptor; still connected
to the fuel crossover pi pe and fuel feed pipe.
22. Remove the intercoole r adaptor assembly.
1. Remove and discard the seals from the fuel rail.
2. Remove the five bolts which secure the adaptor
assembly to the cylinder head.
3. Remove the adaptor assembly from the cylinder head.
Remove the gasket; adaptor assembly to cylinder head.
23. Clean and inspect all relevant mating faces.
1. Fit the intercooler adaptor assembly.
1. Fit a new gasket; adaptor assembly to cylinder head.
2. Align and fit the adaptor assembly to the cylinder head.
Page 742 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel feed pipe. Locate the
fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the B-Bank injectors.
4. Fit the B-Bank intercooler. Refer to Operation 18.50.19.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation (SC) 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 744 of 2490

Engine - Intake Manifold Gasket RH
In-vehicle Repair
1. Open the engine compartment and fit paintwork protection
sheets.
2. Disconnect the batt ery ground cable.
Remove the battery cover.
3. WARNING: BEFORE PROCEEDING, IT IS ESSENTIAL THAT THE WARNINGS GIVEN IN SECTION 100-00 (UNDER THE
HEADING 'SAFETY PRECAUTIONS') ARE READ AND
UNDERSTOOD.
Depressurise the fuel system.
Ensure that the ignition is switched off and remove the
valve cap from the fuel cross-over pipe. Place a cloth
under the valve to collect any spillage.
Place a closed container, su itable for collecting fuel,
adjacent to the vehicle. Remove the lid.
4. Connect the fuel injection pres sure test equipment 310 - 058
(or other suitable type). Insert the drain / bleed tube into the
fuel container. Follow the ma nufacturer's instructions and
depressurise the fuel system.
5. Store the drained fuel safely and ensure that the lid is closed
securely. Remove the equipmen t and discard the cloth from
beneath the valve. refit the valve cap.
6. Drain the radiator coolant. Refer to Operation 26.10.01.
7. Disconnect the breather pipe fro m the A-Bank camshaft cover.
1. Disconnect the breather pipe from the stub pipe.
2. Remove and discard the O-ring seal from the breather
pipe.
Page 746 of 2490

Installation
19.70.28.
15. Remove the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
16. Remove the coolant output pipe. Refer to Operation (SC)
26.31.08.
17. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
18. Remove the supercharger as sembly. Refer to operation
18.50.15.
19. Remove the A-Bank intercooler. Refer to Operation 18.50.18.
20. Disconnect the fuel injector harness.
1. Disconnect the multi-plugs from the A-Bank injectors.
2. Loosen, do not remove, the nuts which secure the
harness to the camshaft cover.
3. Reposition the harness for access.
21. Remove the fuel rail.
1. Remove the three bolts whic h secure the fuel rail to
the intercooler adaptor.
2. Remove the fuel rail from the adaptor; still connected
to the fuel crossover pipe and fuel return pipe.
22. Remove the intercoole r adaptor assembly.
1. Remove and discard the seals from the fuel rail.
2. Remove the five bolts which secure the adaptor
assembly to the cylinder head.
3. Remove the adaptor assembly from the cylinder head.
Remove the gasket; adaptor assembly to cylinder head.
23. Clean and inspect all relevant mating faces.
1. Fit the intercooler adaptor assembly.
1. Fit a new gasket; adaptor assembly to cylinder head.
2. Align and fit the adaptor assembly to the cylinder head.
Page 747 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 848 of 2490

Engine - Upper Oil Pan4.0L SC V8 - AJ26, 4.0L, Vehicles With:
Supercharger
In-vehicle Repair
Removal
Special Tool(s)
Installer/remover, Oil Filter
303-752
1. Disconnect the batt ery ground cable.
Remove the battery cover.
2. Open the engine compartment and fit paintwork protection
sheets.
3. Remove the engine compartmen t cover. Refer to Operation
76.16.01.
4. Remove the twin fan and motor assembly. Refer to Operation
26.25.12.
5. Remove the coolant outlet pipe . Refer to Operation 26.31.08.
6. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
7. Remove the supercharger drive belt idler pulley. Refer to
Operation 18.50.09.
8. Remove the supercharger idle r pulley mounting bracket.
1. Remove the three bolts which secure the mounting
bracket.
2. Remove the mounting bracket.
9. Remove the supercharger driv e belt tensioner. Refer to
Operation 18.50.24.
10. Remove the timing cover and al l associated components, as
detailed in Operation 12.65.01.
11. Remove both front wheel and tyre assemblies. Refer to
Operation 74.20.05.
Page 858 of 2490

23.
Install the supercharger driv e belt tensioner. Refer to
Operation 18.50.24.
24. Install the supercharger idle r pulley mounting bracket.
1. Position the mounting bracket to the timing cover.
2. Install the three bolts which secure the mounting bracket. Tighten to 8-10 Nm.
25. Install the supercharger drive belt idler pulley. Refer to
Operation 18.50.09. (34-46 Nm).
26. Install the supercharger driv e belt. Refer to Operation
18.50.08.
27. Install the coolant outlet pipe. Refer to Operation 26.31.08.
28. Install the twin fan and motor assembly. Refer to Operation
26.25.12.
29. Refill the cooling system. Refer to Operation 26.10.01 in
General Procedures section of the cooling system.
30. NOTE: When the engine is star ted from cold and run for a
short period only, before being swit ched off, a quantity of oil will
be 'hung up' within the engine because it is not up to operating
temperature.
Should the oil level subsequently be topped-up, the level could
become too high, causing oil burning.
Typically, 0.875 L is hung up.
Refill the engine with the correct specification engine oil.
31. Connect the battery and in stall the battery cover.
Refer to the Battery Reconnection Procedure 86.15.15.
32. Check the oil level and start th e engine. Check for leaks and
that the engine runs correctly.
33. Install the engine compartmen t cover. Refer to Operation
76.16.01.
34. Remove the paintwork protection sheets and close the engine
compartment cover.
Page 875 of 2490

Engine - Valve Springs LH
In-vehicle Repair
Removal
Special Tool(s)
Valve spring compressor
303-252 1. Open the engine compartment and fit paintwork protection
sheets.
2. Set the engine compartment cover to the service access
position.
3. Disconnect the batt ery ground cable.
Remove the battery cover.
4. Remove the Timing Co ver. Refer to Operation 12.65.01 in this
Section. This operation includes draining the coolant from the
radiator and removing the cam covers.
5. Remove the Inlet Manifold. Refer to Operation 30.15.01 in this
Section. This operation includes depressurising the fuel system
and removing the throttle housing.
6. Remove the Cylinder Head an d Gasket. Refer to Operation
12.29.02 in this Section.
7. Remove the valve collets from the first valve.
1. Fit the valve spring compressor 303 - 252 to the relevant spring.
2. Compress the spring and remove the collets.
8. Remove the valve spring.
Remove the valve spring compressor 303 - 252.
1. Remove the valve collar.
2. Remove the valve spring.