1998 JAGUAR X308 clock

[x] Cancel search: clock

Page 680 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
allow the chain tensioning tool 303-532 to be approximately vertical, as shown. 
Remove the chain tensioni ng tool; during future 
operations, do not move the sprocket within the chain.  
 
2.  P

Page 717 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
 
 
25. Reconnect the air flow  meter multi-plug. 
26.  fit a new strap to secures the vacuum pipe to the induction 
elbow. 
 
27.  Connect the breather pipe to  the A-Bank camshaft cover. 
1. Fit a

Page 728 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
 
 
2. Reconnect the breather pipe to the stub pipe. 
21.  Carefully refit the engine covers, taking care not to damage 
the plastic fixings or  the rubber inserts. 
22.  Connect the battery ground

Page 765 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
sprocket, B-Bank. 
Reposition the sprocket (and the VVT unit) for the most 
advantageous position for use of the tool.  
Remove the tool.  
 
2.  Refit the primary timing chain, B-Bank. 
1. Fi

Page 767 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
 
10. Fit the primary chain tensioner blade. 
1. Position the tensioner blade to the cylinder block. 
2. Fit the retaining / pivot bolt and tighten it to 12 - 16 Nm. 
 
11.  Refit the primary chain

Page 775 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
camshaft sprocket, Bank 2. 
Reposition the sprocket to the most advantageous position for use of the tool.  
Remove the tool.  
 
2. Install the primary timi ng chain, Bank 2. 
1. Install the

Page 777 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
 
10. Install the primary ch ain tensioner blade. 
1. Position the tensioner blade to the cylinder block. 
2. Install the retaining / pivo t bolt and tighten it to 12-
16 Nm. 
 
11.  Install the pri

Page 783 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
Reposition the sprocket (and the VVT unit) for the most 
advantageous position for use of the tool.  
Remove the tool.  
 
3.  Refit the primary timing chain. 
1. Fit the primary chain to posi
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 112 next >