1997 TOYOTA SUPRA relay

[x] Cancel search: relay

Page 1088 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 99
VOLTAGE IS ALWAYS APPLIED FROM THE MAIN FUSE, THROUGH THE HEADLIGHT RELAY (COIL SIDE) TO
TERMINAL 5 OF THE DAYTIME RUNNING LIGHT RELAY (MAIN), TERMINAL 6 OF THE INTEGRATION RELAY,
TERMINAL 14 OF TH

Page 1089 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 100
HEADLIGHT (CANADA)
: PARTS LOCATION
CODESEE PAGECODESEE PAGECODESEE PAGE
B224 (2JZ-GTE)D628H424 (2JZ-GTE)
C1228G224 (2JZ-GTE)I2029
C1328H124 (2JZ-GTE)P529
D2A24H224 (2JZ-GTE)
D3B24H324 (2JZ-GTE)
:

Page 1091 of 1807

TOYOTA SUPRA 1997  Service Repair Manual B 5
1 2
2 3
1 2
1 2
OFF
TAI L
HEAD 2
EB EA IE
W- L
G
G
G
G
G W- B
W- B
W- B W- B W- BW- B W- BB
G- W G
G
W- B G
11
2 1
2 2
1
G
INTEGRATION
RELAY
LIGHT CONTROL SW
[COMB.  SW] C13
BATTERY
LICENSE PLATE

Page 1093 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 104
TAILLIGHT
WHEN THE LIGHT CONTROL SW IS TURNED TO TAIL OR HEAD POSITION. THE CURRENT FLOWS TO TERMINAL 3
OF THE LIGHT FAILURE SENSOR THROUGH THE TAIL FUSE.
WHEN THE IGNITION SW IS TURNED ON, THE CU

Page 1095 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 15A
HEAD(
LH- LWR)
(
CANADA) 15A
HE AD (
LH)
(
USA)15A
FOG
25 13
IB2 15
IE EB EA1 2
1 2 22 22
22
9 12
3 7 6 21
G- W G- R
BR
W- B
W- B
W- BG- W
G- W OO R-B
FROM POWER SOURCE SYSTEM (
SEE PAGE 56)
FOG L

Page 1096 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 107
FOG LIGHT RELAY
(2)3-(2)5 : CLOSED WITH THE LIGHT CONTROL SW AT HEAD POSITION, DIMMER SW AT LOW POSITION AND THE
FOG LIGHT SW ON POSITION
: PARTS LOCATION
CODESEE PAGECODESEE PAGECODESEE PAGE
C132

Page 1097 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 2
A 3 A 2
A 4A1
IEBI 2 3 BATTERY
LIGHT CONTROL SW
[COMB.  SW]
DOOR COURTESY
SW LH 7. 5A
DOME10A
GAU GE
13 2
117 2
I20 A
INTEGRATION RELAY
C13
D10
W- B R- B R- BW- BB
R
GG- W R
W- LR- Y
W- B
R- Y
FROM

Page 1098 of 1807

TOYOTA SUPRA 1997  Service Repair Manual 109
WITH THE IGNITION SW TURNED ON, THE CURRENT FLOWS TO TERMINAL 7 OF THE INTEGRATION RELAY
THROUGH GAUGE FUSE. VOLTAGE IS APPLIED AT ALL TIMES TO TERMINAL (A) 2 OF THE INTEGRATION RELAY
THROUGH THE