M161 ENGINE ELECTRICAL 1E 2 -- 9
D AEW OO M Y_2000
Removal & Installation Procedure
1. Disconnect the battery negative cable.
2. Unscrew the 3 screws and remove the ignition cable
duct cover.
Installation Notice
Tightening Torque
9--11NSm (80 -- 97 lb-in)
3. Seperate the cable from the ignition cable and the
spark plug.
4. Remove the 2 bolts from each ignition cable and re-
move the ignition cables.
Installation Notice
Tightening Torque
9--11NSm (80 -- 97 lb-in)
Install the ignition cable to the cylinder 2 and 4 and
connect the cable from 1 to 4, and from 2 to 3.
-- T1/1 : Cylinder 1 and 4
-- T1/2 : Cylinder 2 and 3
5. Installation should follow the removal procedure in
the reverse order.
Ignition Cable and Cable Lay- out
1. Firing Order : 1 -- 3 -- 4 -- 2
2. T1/1 : Connect the cylinder 1 + 4
3. T1/2 : Connect the cylinder 2 + 3
Inspection & Maintenance (for E2.3 MSE)
1. Measure the primary resistance between the cable
terminals 1 and 15 after removing the ignition cable
wiring connector (1 and 15) with ignition switch OFF.
Notice:Replace the ignition coil if out of the specified
resistance.
Specified Value
0.9 -- 1.6Ω
2. Measure the primary voltage(T1/1) between the ECU
terminals No.72 and No.69 during the engine crank-
ing (starter motor activated).
Specified Value
200 -- 350 v