1953 JEEP DJ Service Manual

Page 65 of 376

JEEP DJ 1953  Service Manual 
Jeep
 UNIVERSAL
 SERIES
 SERVICE
 MANUAL 

D 

FIG.
 D-38—CHECKING
 FLYWHEEL
 RUN-OUT 
 place the flywheel on the mounting
 bolts
 in the 

crankshaft.
 When installing a new crankshaft or 
flywh

Page 66 of 376

JEEP DJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 

FIG.
 D-40—TIMING
 GEARS  Be
 sure
 to install a new rubber oil
 seal
 ring on each 

intake
 valve stem before installing the retainer 

locks.
 With
 the retainer and

Page 67 of 376

JEEP DJ 1953  Service Manual 
Jeep
 UNIVERSAL
 SERIES SERVICE
 MANUAL 

D 
Lubricate
 the connecting rod bearing surfaces 
generously with
 engine
 oil and install the bearing 
cap with the numbered side matched to the num­
be

Page 68 of 376

JEEP DJ 1953  Service Manual 
D 
HURRICANE
 F4
 ENGINE 
D-101.
 Install
 Manifold 

If
 manifold studs were removed for replacement, 
apply sealer on the stud threads
 before
 installing 
 a
 new stud. 
See Section Fl for exhaust

Page 69 of 376

JEEP DJ 1953  Service Manual 
Jeep9
 UNIVERSAL
 SERIES
 SERVICE
 MANUAL 

h.
 Check
 ignition (distributor) timing; reset if 
necessary. 

i.
 Check
 carburetor
 adjustments; reset if necessary, 

j.
 With
 engine
 fully warmed

Page 70 of 376

JEEP DJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 
 D-112.
 SERVICE
 DIAGNOSIS 

Poor
 Fuel
 Economy  Ignition Timing Slow or Spark Advance Stuck 

Carburetor
 Float High 
Accelerator Pump Not Properly Adjusted 
High
 Fuel

Page 71 of 376

JEEP DJ 1953  Service Manual 
Jeep*
 UNIVERSAL
 SERIES
 SERVICE
 MANUAL 

D D-l 13. HURRICANE
 F4
 ENGINE SPECIFICATIONS 

MODEL: 
 ENGLISH 
ENGINE: 

Type 

Number of Cylinders 

Bore 
 Stroke 
Piston Displacement...........

Page 72 of 376

JEEP DJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 
D-l
 13
 HURRICHNE
 F4
 ENGINE
 SPECIFICATIONS
 (Continued) 

MODEL: 
 CONNECTING
 RODS: 
 Material. 

Weight 
Length
 (center to
 center)...... 

Bearing: 
 Type. 
Materia