![NISSAN NOTE 2016 Service Repair Manual LAN-22
< PRECAUTION >[CAN]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000012433342
The Supplemental Rest NISSAN NOTE 2016 Service Repair Manual LAN-22
< PRECAUTION >[CAN]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000012433342
The Supplemental Rest](/manual-img/5/57363/w960_57363-2209.png)
LAN-22
< PRECAUTION >[CAN]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000012433342
The Supplemental Restraint System such as “A IR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. Information necessary to service the system safely is included in the SR and SB section of
this Service Manual.
WARNING:
• To avoid rendering the SRS inopera tive, which could increase the risk of personal injury or death in
the event of a collision which would result in air bag inflation, all maintenance must be performed by
an authorized NISSAN/INFINITI dealer.
• Improper maintenance, including in correct removal and installation of the SRS, can lead to personal
injury caused by unintent ional activation of the system. For re moval of Spiral Cable and Air Bag
Module, see the SR section.
• Do not use electrical test equipmen t on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harn esses can be identified by yellow and/or orange harnesses or har-
ness connectors.
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
• When working near the Airbag Diagnosis Sensor Unit or other Airbag System sensors with the Igni-
tion ON or engine running, DO NOT use air or electri c power tools or strike near the sensor(s) with a
hammer. Heavy vibration could activate the sensor( s) and deploy the air bag(s), possibly causing
serious injury.
• When using air or electric power tools or hammers , always switch the Ignition OFF, disconnect the
battery and wait at least three minutes before performing any service.
Precautions for Trouble DiagnosisINFOID:0000000012433343
CAUTION:
Follow the instructions listed below. Fail ure to do this may cause damage to parts:
• Never apply 7.0 V or more to the measurement terminal.
• Use a tester with open terminal voltage of 7.0 V or less.
• Turn the ignition switch OFF and disconnect th e battery cable from the negative terminal when
checking the harness.
Precautions for Harness RepairINFOID:0000000012433344
• Solder the repaired area and wrap tape around the soldered area. NOTE:
A fray of twisted lines must be within 110 mm (4.33 in).
SKIB8766E
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN
SYSTEMLAN-31
< SYSTEM DESCRIPTION > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
Vehicle speed signal (ABS)
TR R R R R
Brake warning lamp signal TR
Detention switch signal TR
Front wiper stop position sign NISSAN NOTE 2016 Service Repair Manual LAN
SYSTEMLAN-31
< SYSTEM DESCRIPTION > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
Vehicle speed signal (ABS)
TR R R R R
Brake warning lamp signal TR
Detention switch signal TR
Front wiper stop position sign](/manual-img/5/57363/w960_57363-2218.png)
LAN
SYSTEMLAN-31
< SYSTEM DESCRIPTION > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
Vehicle speed signal (ABS)
TR R R R R
Brake warning lamp signal TR
Detention switch signal TR
Front wiper stop position signal TR
High beam status signal RT
Ignition switch ON signal TR
RT
Interlock/PNP switch signal TR
RT
Low beam status signal RT
Push-button ignition switch status signal TR
OD OFF indicator signal RT
RT
Starter control relay signal TR
RT
Starter relay status signal TR
RT
Sleep-ready signal TR
TR
Wake up signal TR
Input shaft revolution signal RT
O/D OFF indicator signal TR
Output shaft revolution signal RT
Shift position signal RT RR
Target gear ratio signal RT
EPS warning lamp signal TR
Overdrive control switch signal RT
Fuel filler cap warning reset signal RT
O/D OFF switch signal RT
Odometer signal TR
Vehicle speed signal (Meter) RR TR
Wake up signal TR
Steering angle sensor signal RR T
A/C ON signal R T
Blower fan ON signal R T
Buzzer output signal RT
Dimmer signal RT
Door switch signal RRT
Engine start operation indicator lamp signal RT
Front wiper request signal RT
High beam request signal RRT
Key warning lamp signal RT
Low beam request signal RRT
Signal name
ECM
ABS
IPDM-E
TCMAV M
EPS
M&A
STRG
BCM
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUITLAN-41
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433355
1.C NISSAN NOTE 2016 Service Repair Manual LAN
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUITLAN-41
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433355
1.C](/manual-img/5/57363/w960_57363-2228.png)
LAN
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUITLAN-41
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN IPDM-E AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433355
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cabl e from the negative terminal.
3. Check the following terminals and connectors for damage, bend and loose connection (connector side
and harness side).
- Harness connector E7
- Harness connector M69
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
1. Disconnect the following harness connectors.
- IPDM E/R
- Harness connectors E7 and M69
2. Check the continuity between the IPDM E/R harness connector and the harness connector.
Is the inspection result normal?
YES >> GO TO 3.
NO >> Repair the main line between the IPDM E/R and the harness connector E7.
3.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
Check the continuity between the harness connector and the data link connector.
Is the inspection result normal?
YES (Present error)>>Check CA N system type decision again.
YES (Past error)>>Error was detected in the main line between the IPDM E/R and the data link connector.
NO >> Repair the main line between the harness connector M69 and the data link connector.
IPDM E/R harness connector Harness connector
Continuity
Connector No. Terminal No.Connector No. Terminal No.
E46 62
E721A
Existed
61 20AExisted
Harness connector Data link connector
Continuity
Connector No. Terminal No.Connector No. Terminal No.
M69 21A
M22 6
Existed
20A 14Existed
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN-42
< DTC/CIRCUIT DIAGNOSIS >[CAN]
MAIN LINE BETWEEN IPDM-E AND AVM CIRCUIT
MAIN LINE BETWEEN IP
DM-E AND AVM CIRCUIT
Diagnosis ProcedureINFOID:0000000012433356
1.CHECK CONNECTOR
1. Turn the igniti NISSAN NOTE 2016 Service Repair Manual LAN-42
< DTC/CIRCUIT DIAGNOSIS >[CAN]
MAIN LINE BETWEEN IPDM-E AND AVM CIRCUIT
MAIN LINE BETWEEN IP
DM-E AND AVM CIRCUIT
Diagnosis ProcedureINFOID:0000000012433356
1.CHECK CONNECTOR
1. Turn the igniti](/manual-img/5/57363/w960_57363-2229.png)
LAN-42
< DTC/CIRCUIT DIAGNOSIS >[CAN]
MAIN LINE BETWEEN IPDM-E AND AVM CIRCUIT
MAIN LINE BETWEEN IP
DM-E AND AVM CIRCUIT
Diagnosis ProcedureINFOID:0000000012433356
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the following terminals and connectors for damage, bend and loose connection (connector side and harness side).
- Harness connector E7
- Harness connector M69
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
1. Disconnect the following harness connectors.
- IPDM E/R
- Harness connectors E7 and M69
2. Check the continuity between the IPDM E/R harness connector and the harness connector.
Is the inspection result normal?
YES >> GO TO 3.
NO >> Repair the main line between the IPDM E/R and the harness connector E7.
3.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
1. Disconnect the harness connectors M13 and B30.
2. Check the continuity bet ween the harness connectors.
Is the inspection result normal?
YES (Present error)>>Check CAN system type decision again.
YES (Past error)>>Error was detected in the main line between the IPDM E/R and the around view monitor
control unit.
NO >> Repair the main line between the harness c onnector M69 and around view monitor control unit.
IPDM E/R harness connector Harness connector
Continuity
Connector No. Terminal No.Connector No. Terminal No.
E46 62
E721A
Existed
61 20AExisted
Harness connector Harness connector
Continuity
Connector No. Terminal No.Connector No. Terminal No.
M69 21A
M13 5
Existed
20A 17Existed
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN
MAIN LINE BETWEEN AVM AND DLC CIRCUITLAN-43
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN AVM AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433357
1.CHECK H NISSAN NOTE 2016 Service Repair Manual LAN
MAIN LINE BETWEEN AVM AND DLC CIRCUITLAN-43
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN AVM AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433357
1.CHECK H](/manual-img/5/57363/w960_57363-2230.png)
LAN
MAIN LINE BETWEEN AVM AND DLC CIRCUITLAN-43
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
MAIN LINE BETWEEN AVM AND DLC CIRCUIT
Diagnosis ProcedureINFOID:0000000012433357
1.CHECK HARNESS CONTI
NUITY (OPEN CIRCUIT)
1. Turn the ignition switch OFF.
2. Disconnect the battery cabl e from the negative terminal.
3. Disconnect the following harness connectors.
-ECM
- Around view monitor control unit
4. Check the continuity between the around view monitor control unit harness connector and the data link connector.
Is the inspection result normal?
YES (Present error)>>Check CA N system type decision again.
YES (Past error)>>Error was detected in the main line between the around view monitor control unit and the data link connector.
NO >> Repair the main line between the around view monitor control unit and the data link connector.
Around view monitor control unit harness connector Date link connector
Continuity
Connector No. Terminal No.Connector No. Terminal No.
B54 12
M22 6
Existed
10 14Existed
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN-44
< DTC/CIRCUIT DIAGNOSIS >[CAN]
ECM BRANCH LINE CIRCUIT
ECM BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433358
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the ba NISSAN NOTE 2016 Service Repair Manual LAN-44
< DTC/CIRCUIT DIAGNOSIS >[CAN]
ECM BRANCH LINE CIRCUIT
ECM BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433358
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the ba](/manual-img/5/57363/w960_57363-2231.png)
LAN-44
< DTC/CIRCUIT DIAGNOSIS >[CAN]
ECM BRANCH LINE CIRCUIT
ECM BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433358
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the ECM for damage, bend and loose connection (unit side and connector side).
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.CHECK HARNESS FOR OPEN CIRCUIT
1. Disconnect the connector of ECM.
2. Check the resistance between the ECM harness connector terminals.
Is the measurement value within the specification?
YES >> GO TO 3.
NO >> Repair the ECM branch line.
3.CHECK POWER SUPPLY AND GROUND CIRCUIT
Check the power supply and the ground circuit of the ECM. Refer to EC-159, "
Diagnosis Procedure".
Is the inspection result normal?
YES (Present error)>>Replace the ECM. Refer to EC-477, "Removal and Installation".
YES (Past error)>>Error was detected in the ECM branch line.
NO >> Repair the power supply and the ground circuit.
ECM harness connector Resistance (Ω)
Connector No. Terminal No.
E16 8483Approx. 108 – 132
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN
ABS BRANCH LINE CIRCUITLAN-45
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABS BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433359
1.CHECK CONNECTOR
1. Turn the ignitio NISSAN NOTE 2016 Service Repair Manual LAN
ABS BRANCH LINE CIRCUITLAN-45
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABS BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433359
1.CHECK CONNECTOR
1. Turn the ignitio](/manual-img/5/57363/w960_57363-2232.png)
LAN
ABS BRANCH LINE CIRCUITLAN-45
< DTC/CIRCUIT DIAGNOSIS > [CAN]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABS BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433359
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cabl e from the negative terminal.
3. Check the terminals and connectors of the ABS act uator and electric unit (control unit) for damage, bend
and loose connection (unit side and connector side).
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.CHECK HARNESS FOR OPEN CIRCUIT
1. Disconnect the connector of ABS actuat or and electric unit (control unit).
2. Check the resistance between the ABS actuator and electric unit (control unit) harness connector termi-
nals.
Is the measurement value within the specification?
YES >> GO TO 3.
NO >> Repair the ABS actuator and electric unit (control unit) branch line.
3.CHECK POWER SUPPLY AND GROUND CIRCUIT
Check the power supply and the ground circuit of the A BS actuator and electric unit (control unit). Refer to
BRC-121, "
Diagnosis Procedure".
Is the inspection result normal?
YES (Present error)>>Replace the ABS actuator and electric unit (control unit). Refer to BRC-144, "Removal
and Installation".
YES (Past error)>>Error was detected in the ABS actuator and electric unit (control unit) branch line.
NO >> Repair the power supply and the ground circuit.
ABS actuator and electric unit (control unit) harness connector Resistance (Ω)
Connector No. Terminal No.
E33 1110Approx. 54 – 66
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual LAN-46
< DTC/CIRCUIT DIAGNOSIS >[CAN]
IPDM-E BRANCH LINE CIRCUIT
IPDM-E BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433360
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect NISSAN NOTE 2016 Service Repair Manual LAN-46
< DTC/CIRCUIT DIAGNOSIS >[CAN]
IPDM-E BRANCH LINE CIRCUIT
IPDM-E BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433360
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect](/manual-img/5/57363/w960_57363-2233.png)
LAN-46
< DTC/CIRCUIT DIAGNOSIS >[CAN]
IPDM-E BRANCH LINE CIRCUIT
IPDM-E BRANCH LINE CIRCUIT
Diagnosis ProcedureINFOID:0000000012433360
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the IPDM E/R for damage, bend and loose connection (unit side and connector side).
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.CHECK HARNESS FOR OPEN CIRCUIT
1. Disconnect the connector of IPDM E/R.
2. Check the resistance between the IPDM E/R harness connector terminals.
Is the measurement value within the specification?
YES >> GO TO 3.
NO >> Repair the IPDM E/R branch line.
3.CHECK POWER SUPPLY AND GROUND CIRCUIT
Check the power supply and the ground circuit of the IPDM E/R. Refer to PCS-29, "
Diagnosis Procedure".
Is the inspection result normal?
YES (Present error)>>Replace the IPDM E/R. Refer to PCS-30, "Removal and Installation".
YES (Past error)>>Error was detected in the IPDM E/R branch line.
NO >> Repair the power supply and the ground circuit.
IPDM E/R harness connector Resistance (Ω)
Connector No. Terminal No.
E46 6261Approx. 54 – 66
Revision: August 2015 2016 Versa Note
cardiagn.com