![NISSAN NOTE 2016 Service Repair Manual EM-44
< REMOVAL AND INSTALLATION >[HR16DE]
FUEL INJECTOR AND FUEL TUBE
• Handle O-ring with bare hands. Do not wear gloves.
• Lubricate O-ring with new engine oil.
• Do not clean O-ring with sol NISSAN NOTE 2016 Service Repair Manual EM-44
< REMOVAL AND INSTALLATION >[HR16DE]
FUEL INJECTOR AND FUEL TUBE
• Handle O-ring with bare hands. Do not wear gloves.
• Lubricate O-ring with new engine oil.
• Do not clean O-ring with sol](/manual-img/5/57363/w960_57363-1044.png)
EM-44
< REMOVAL AND INSTALLATION >[HR16DE]
FUEL INJECTOR AND FUEL TUBE
• Handle O-ring with bare hands. Do not wear gloves.
• Lubricate O-ring with new engine oil.
• Do not clean O-ring with solvent.
• Check that O-ring and its mating pa
rt are free of foreign material.
• When installing O-ring, be careful not to scratch it.
• Do not twist or stretch O-ring. If O-ring was st retched while it was being attached, allow it to
retract before inserting it into fuel tube.
• Insert O-ring straight into fuel tube. Do not angle or twist it.
2. Install fuel injector (4) to fuel tube (1):
a. Insert new clip (2) into clip groove (G) on fuel injector (4). • Insert new clip (2) so that protrusion (F) of fuel injector
matches cut-out (D) of clip.
CAUTION:
• Do not reuse clip. Replace it with a new one.
• Be careful to keep clip from interfering with O-ring. If interference occurs, replace O-ring.
b. Insert fuel injector (4) into fuel tube (1) with clip (2) attached. • Insert fuel injector (4) while matching it to the axial center.
• Insert fuel injector (4) so that protrusion (B) of fuel tubematches cut-out (C) of clip (2).
• Check that fuel tube flange (A) is securely located in flange groove (E) on clip (2).
c. Check that installation is complete by checking that fuel injector (4) does not rotate or come off.
3. Set fuel tube and fuel injector assembly in position for installation on cylinder head. CAUTION:
For installation, be careful not to interfere with fuel injector nozzle.
• Tighten bolts in numerical order as shown.
4. Install fuel tube protector. Fuel tube side
: Black
Nozzle side : Green
(3) : O-ring (black)
(5) : O-ring (green)
JPBIA4530ZZ
: Engine front
JPBIA4133ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual FUEL INJECTOR AND FUEL TUBEEM-45
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Tighten bolts in numerical order as shown.
5. Connect harness connectors to fuel injectors.
NISSAN NOTE 2016 Service Repair Manual FUEL INJECTOR AND FUEL TUBEEM-45
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Tighten bolts in numerical order as shown.
5. Connect harness connectors to fuel injectors.](/manual-img/5/57363/w960_57363-1045.png)
FUEL INJECTOR AND FUEL TUBEEM-45
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Tighten bolts in numerical order as shown.
5. Connect harness connectors to fuel injectors.
6. Connect harness connectors to intake and ex haust valve timing control solenoid valves.
7. Connect fuel feed tube (engine side):
a. Check for damage or foreign material on the fuel tube and quick connector.
b. Apply new engine oil lightly to area around the top of fuel tube.
c. Align center to insert quick connector straight into fuel tube. • Insert quick connector (1) to fuel tube until the top spool (C) on
fuel tube is inserted completely and the 2nd level spool (D) is
positioned slightly below quick connector bottom end.
CAUTION:
• Hold in position (A) as sh own when inserting fuel tube
into quick connector.
• Carefully align center to avoid inclined insertion to pre-
vent damage to O-ring inside quick connector.
• Insert until you hear a “click” sound and actually feel
the engagement.
d. To avoid misidentification of engagement with a simi lar sound, pull quick connector hard by hand. Check it
is completely engaged (connected) so that it does not come out from fuel tube.
e. Install quick connector cap (engine side) (1) to quick connector connection.
• Install quick connector cap (engine side) (1) with the sidearrow facing quick connector side (fuel feed tube side) as
shown.
CAUTION:
• Check that the quick connector and fuel tube aresecurely engaged with the qu ick connector cap (engine
side) groove.
• If the quick connector cap (engine side) cannot be installed easily the quick connector may not be con-
nected correctly. Remove and reconnect.
f. Install fuel feed hose to hose clamp.
8. Connect fuel feed tube (floor piping side):
a. Check the connection for damage or any foreign materials.
b. Align the quick connector with the tube, then insert the connector straight into the centralized under floor piping until a click is heard.
: Engine front
JPBIA4132ZZ
(B) : Upright insertion
(E) : Correctly connected
JPBIA2256ZZ
JPBIA4131ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual ROCKER COVEREM-49
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Loosen bolts in reverse order as shown.
6. Remove rocker cover gasket from rocker cover.
7. Remove all trace NISSAN NOTE 2016 Service Repair Manual ROCKER COVEREM-49
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Loosen bolts in reverse order as shown.
6. Remove rocker cover gasket from rocker cover.
7. Remove all trace](/manual-img/5/57363/w960_57363-1049.png)
ROCKER COVEREM-49
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Loosen bolts in reverse order as shown.
6. Remove rocker cover gasket from rocker cover.
7. Remove all traces of liquid gasket from cylinder head and front cover using suitable tool. CAUTION:
Do not scratch or damage the mating su rface when cleaning off old liquid gasket.
INSTALLATION
CAUTION:
Do not reuse O-ring.
1. Install the rocker cover:
a. Press gasket onto the bosses for the rocker cover bolt holes as
shown to prevent the gasket from dropping off.
b. Apply liquid gasket to the cylinder head (1) and front cover (2) as shown.
Use Genuine RTV Silicone Seal ant or equivalent. Refer to
GI-22, "
Recommended Chemical Products and Sealants".
CAUTION:
• The components must be inst alled within 5 minutes of the
liquid gasket application.
• Then allow 30 minutes for th e liquid gasket to set before
putting oil in the engine.
c. Install rocker cover to cylinder head. CAUTION:
Check that the gasket has no t slipped out of position.
• Tighten bolts in numerical order in at least three separate stages as shown.
: Engine front
JPBIA4135ZZ
: Engine front
JPBIA4136ZZ
(a) : 2.5 - 3.5 mm diameter
JPBIA4137ZZ
: Engine front
JPBIA4135ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual TIMING CHAINEM-51
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
TIMING CHAIN
Exploded ViewINFOID:0000000012431718
Removal and InstallationINFOID:0000000012431719
CAUTION:
The r NISSAN NOTE 2016 Service Repair Manual TIMING CHAINEM-51
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
TIMING CHAIN
Exploded ViewINFOID:0000000012431718
Removal and InstallationINFOID:0000000012431719
CAUTION:
The r](/manual-img/5/57363/w960_57363-1051.png)
TIMING CHAINEM-51
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
TIMING CHAIN
Exploded ViewINFOID:0000000012431718
Removal and InstallationINFOID:0000000012431719
CAUTION:
The rotation direction indicated in the t
ext is as viewed from the engine front.
NOTE:
• When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from
spilling.
• When removing the camshafts, the oil pump drive chain does not need to be removed.
REMOVAL
1. Timing chain slack guide 2. Timing chain tensioner3. Camshaft sprocket (EXH)
4. Camshaft sprocket (INT )5. Plug 6. Front oil seal
7. Crankshaft pulley 8. Crankshaft pulley bolt9. Front cover
10. Crankshaft sprocket 11. Crankshaft sprocket key 12. Oil pump sprocket
13. Oil pump drive chain 14. Oil pump drive chain tensioner 15. Timing chain
16. Timing chain tension guide A. Refer to INSTALLATION
AWBIA1475ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual EM-52
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
1. Remove front wheel and tire (RH). Refer to
WT-48, "Removal and Installation".
2. Remove front fender protector (RH). Refer to EXT-38, "
Rem NISSAN NOTE 2016 Service Repair Manual EM-52
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
1. Remove front wheel and tire (RH). Refer to
WT-48, "Removal and Installation".
2. Remove front fender protector (RH). Refer to EXT-38, "
Rem](/manual-img/5/57363/w960_57363-1052.png)
EM-52
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
1. Remove front wheel and tire (RH). Refer to
WT-48, "Removal and Installation".
2. Remove front fender protector (RH). Refer to EXT-38, "
Removal and Installation".
3. Drain engine oil. Refer to LU-8, "
Draining".
CAUTION:
• Perform this step when engine is cold.
• Do not spill engine oil on drive belt.
4. Drain coolant. Refer to CO-8, "
Draining Engine Coolant".
5. Remove the drive belt. Refer to EM-16, "
Removal and Installation".
6. Remove the rocker cover. Refer to EM-48, "
Removal and Installation".
7. Remove the water pump pulley. Refer to CO-18, "
Removal and Installation".
8. Support the bottom surface of engine (1) using a transmission jack (2), and then remove engine mounting insulator (RH). Refer
to EM-86, "
Exploded View".
CAUTION:
• Position a suitable jack under the engine and transaxle assembly as shown.
• Do not damage the front exhaust tube or transaxle oil pan with the jack.
9. Set No. 1 cylinder at TDC of its compression stroke:
a. Rotate crankshaft pulley (2) clockwise and align TDC mark (without paint mark) (A) to timing indicator (1) on front cover.
b. Check the matching marks on each camshaft sprocket are posi- tioned as shown.
• If not, rotate crankshaft pulley one more turn to align matchingmarks to the positions.
10. Remove crankshaft pulley:
ALBIA0894GB
(B) : White paint mark (Not use for service)
PBIC3673E
(1) : Timing chain
(2) : Camshaft sprocket (EXH)
(3) : Camshaft sprocket (INT)
(A) : Matching mark (Peripheral groove)
(B) : Pink link
(C) : Matching mark (Peripheral groove)
JPBIA4138ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual EM-56
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
a. Install the crankshaft sprocket (1), the oil pump drive chain (2),
and the oil pump sprocket (3) at the same time.
• Install the crankshaft NISSAN NOTE 2016 Service Repair Manual EM-56
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
a. Install the crankshaft sprocket (1), the oil pump drive chain (2),
and the oil pump sprocket (3) at the same time.
• Install the crankshaft](/manual-img/5/57363/w960_57363-1056.png)
EM-56
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
a. Install the crankshaft sprocket (1), the oil pump drive chain (2),
and the oil pump sprocket (3) at the same time.
• Install the crankshaft sprocket so that its invalid gear area (A)is toward the back of the engine.
• Install the oil pump sprocket so that its protrusion faces the front of engine.
NOTE:
There is no matching mark in the oil pump drive related parts.
b. Hold the top of the oil pump shaft using the socket (size: E8), and then tighten the oil pump sprocket nut.
c. Install oil pump drive chain tensioner (1). • Insert the body into the shaft (B) while inserting the spring intothe attaching hole (A) of cylinder block front surface.
• Check that the tension is applied to the oil pump drive chain
after installing.
2. Install timing chain:
• Install by aligning matching marks on each sprocket and tim-ing chain.
• If these matching marks are not aligned, rotate the camshaft
slightly to correct the position.
CAUTION:
• After the matching marks are aligned, keep them aligned by holding them.
• To avoid skipped teeth, do not rotate crankshaft and cam- shaft until front cover is installed.
: Engine front
JPBIA5248ZZ
(1) : Crankshaft sprocket
(2) : Oil pump drive chain
(3) : Oil pump sprocket
JPBIA4230ZZ
JPBIA4143ZZ
(A) : Matching mark (Peripheral groove)
(B) : Pink link
(C) : Matching mark (Peripheral groove)
(D) : Orange link
(E) : Matching mark (stamp)
(F) : Crankshaft key (point straight up)
JPBIA4144ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual TIMING CHAINEM-57
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
3. Install timing chain tension guide (2) and timing chain slack
guide (1).
4. Install chain tensioner (1). • NISSAN NOTE 2016 Service Repair Manual TIMING CHAINEM-57
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
3. Install timing chain tension guide (2) and timing chain slack
guide (1).
4. Install chain tensioner (1). •](/manual-img/5/57363/w960_57363-1057.png)
TIMING CHAINEM-57
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
3. Install timing chain tension guide (2) and timing chain slack
guide (1).
4. Install chain tensioner (1). • Secure the plunger at the most compressed position using a
stopper pin (A), and then install it.
• Pull out the stopper pin after installing the chain tensioner.
5. Check matching mark position of timing chain and each sprocket again.
6. Install the front oil seal to the front cover. Refer to EM-74, "
FRONT OIL SEAL : Removal and Installation".
7. Install front cover with the following procedure:
a. Apply a continuous bead of liquid gasket to the engine block joint locations (A) as shown. Use Genuine Silicone RTV Sealant or equivalent. Refer to GI-22, "
Recommended Chemical Products
and Sealants"
CAUTION:
• Do not confirm torque after the 5 minutes have elapsed.
• Then allow 30 minutes for the liquid gasket to set before
adding oil to the engine.
b. Apply a continuous bead of liquid gasket to front cover as shown using suitable tool. Use Genuine Silicone RTV Sealant or equivalent. Refer to GI-22, "
Recommended Chemical Products
and Sealants".
JPBIA4141ZZ
PBIC3722E
(1) : Cylinder head
(2) : Cylinder block
(3) : Oil pan (upper)
(A) : Liquid gasket application area [3.0 - 4.0 mm (0.12 - 0.16 in) diam-
eter]
JPBIA4145ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com
![NISSAN NOTE 2016 Service Repair Manual EM-58
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
CAUTION:
• Do not confirm torque afte
r the 5 minutes have elapsed.
• Then allow 30 minutes for the liquid gasket to set before
adding oil t NISSAN NOTE 2016 Service Repair Manual EM-58
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
CAUTION:
• Do not confirm torque afte
r the 5 minutes have elapsed.
• Then allow 30 minutes for the liquid gasket to set before
adding oil t](/manual-img/5/57363/w960_57363-1058.png)
EM-58
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
CAUTION:
• Do not confirm torque afte
r the 5 minutes have elapsed.
• Then allow 30 minutes for the liquid gasket to set before
adding oil to the engine.
c. Tighten bolts in the numerical order as shown. NOTE:
Refer to the following for the installation position of bolts.
d. After all bolts are tightened, retighten them to specified torque in numerical order as shown.
CAUTION:
Be sure to wipe off any excessive liquid gasket leaking to
surface.
8. Insert crankshaft pulley by aligning with crankshaft key. • When inserting crankshaft pulley with a plastic hammer, tap on its center portion (not circumference).CAUTION:
Do not damage front oil seal lip section.
9. Tighten crankshaft pulley bolt:
(1) : Front cover edge
(A) : Liquid gasket application area
(b) : 4.0 - 5.6 mm
(c) : Liquid gasket application area [3.0 - 4.0 mm (0.12 - 0.16 in) diame-
ter]
JPBIA4146ZZ
M6 bolt : No. 1
6.6 N·m (0.67 kg-m,
58 in-lb)
M10 bolts : No. 11, 12, 13 55.0 N·m (5.6 kg-m, 41 ft-lb)
M10 bolts : No. 14, 15 55.0 N·m (5.6 kg-m, 41 ft-lb)
M8 bolts : Except above 25.0 N·m (2.6 kg-m, 18 ft-lb)
JPBIA4139ZZ
Revision: August 2015 2016 Versa Note
cardiagn.com