Page 266 of 3641
![NISSAN NOTE 2016 Service Repair Manual BCS
PRECAUTIONSBCS-5
< PRECAUTION > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
PRECAUTION
PRECAUTIONS
Precaution for Supplemental
Restraint System (SRS) "AIR BAG" and "SEAT BELT
PRE NISSAN NOTE 2016 Service Repair Manual BCS
PRECAUTIONSBCS-5
< PRECAUTION > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
PRECAUTION
PRECAUTIONS
Precaution for Supplemental
Restraint System (SRS) "AIR BAG" and "SEAT BELT
PRE](/manual-img/5/57363/w960_57363-265.png)
BCS
PRECAUTIONSBCS-5
< PRECAUTION > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
PRECAUTION
PRECAUTIONS
Precaution for Supplemental
Restraint System (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000012432303
The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severi ty of injury to the driver and front passenger for certain
types of collision. Information necessary to service the system safely is included in the SR and SB section of
this Service Manual.
WARNING:
• To avoid rendering the SRS inoper ative, which could increase the risk of personal injury or death in
the event of a collision which would result in air bag inflation, all maintenance must be performed by
an authorized NISSAN/INFINITI dealer.
• Improper maintenance, including in correct removal and installation of the SRS, can lead to personal
injury caused by unintentional act ivation of the system. For removal of Spiral Cable and Air Bag
Module, see the SR section.
• Do not use electrical test equipm ent on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harnesses can be identi fied by yellow and/or orange harnesses or har-
ness connectors.
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
• When working near the Airbag Diagnosis Sensor Un it or other Airbag System sensors with the Igni-
tion ON or engine running, DO NOT use air or el ectric power tools or strike near the sensor(s) with a
hammer. Heavy vibration could activate the sensor( s) and deploy the air bag(s), possibly causing
serious injury.
• When using air or electric power tools or hammers, always switch the Ignition OFF, disconnect the
battery and wait at least three mi nutes before performing any service.
Revision: August 2015 2016 Versa Note
cardiagn.com
Page 313 of 3641
BCS-52
< WIRING DIAGRAM >[WITH INTELLIGENT KEY SYSTEM]
BCM
WIRING DIAGRAM
BCM
Wiring DiagramINFOID:0000000012432336
ABMWA3493GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 314 of 3641
BCS
BCM
BCS-53
< WIRING DIAGRAM > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABMWA3489GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 315 of 3641
BCS-54
< WIRING DIAGRAM >[WITH INTELLIGENT KEY SYSTEM]
BCM
ABMWA3272GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 316 of 3641
BCS
BCM
BCS-55
< WIRING DIAGRAM > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABMIA7841GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 317 of 3641
BCS-56
< WIRING DIAGRAM >[WITH INTELLIGENT KEY SYSTEM]
BCM
ABMIA7842GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 318 of 3641
BCS
BCM
BCS-57
< WIRING DIAGRAM > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
ABMIA7843GB
Revision: August 2015
2016 Versa Note
cardiagn.com
Page 328 of 3641
![NISSAN NOTE 2016 Service Repair Manual BCS
POWER SUPPLY AND GROUND CIRCUITBCS-67
< DTC/CIRCUIT DIAGNOSIS > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
POWER SUPPLY AND GROUND CIRCUIT
Diagnosis ProcedureINFOID:00000000124323 NISSAN NOTE 2016 Service Repair Manual BCS
POWER SUPPLY AND GROUND CIRCUITBCS-67
< DTC/CIRCUIT DIAGNOSIS > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
POWER SUPPLY AND GROUND CIRCUIT
Diagnosis ProcedureINFOID:00000000124323](/manual-img/5/57363/w960_57363-327.png)
BCS
POWER SUPPLY AND GROUND CIRCUITBCS-67
< DTC/CIRCUIT DIAGNOSIS > [WITH INTELLIGENT KEY SYSTEM]
C
D
E
F
G H
I
J
K L
B A
O P
N
POWER SUPPLY AND GROUND CIRCUIT
Diagnosis ProcedureINFOID:0000000012432353
Regarding Wiring Diagram information, refer to
BCS-52, "Wiring Diagram".
1.CHECK FUSES AND FUSIBLE LINK
Check that the following fuses and fusible link are not blown.
Is the fuse blown?
YES >> Replace the blown fuse or fusible link after repairing the affected circuit.
NO >> GO TO 2.
2.CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connector M99.
2. Check voltage between BCM connector M99 and ground.
Is the inspection result normal?
YES >> GO TO 3.
NO >> Repair harness or connector.
3.CHECK GROUND CIRCUIT
Check continuity between BCM connector M99 and ground.
Is the inspection result normal?
YES >> Inspection End.
NO >> Repair harness or connector.
Terminal No. Signal nameFuses and fusible link No.
57 Battery power supply 12 (10A)
70 G (40A)
BCM
Ground Voltage
Connector Terminal
M99 57
— Battery voltage
70
BCM GroundContinuity
Connector Terminal
M99 67—Yes
Revision: August 2015 2016 Versa Note
cardiagn.com