2009 NISSAN LATIO ignition

[x] Cancel search: ignition

Page 2149 of 4331

NISSAN LATIO 2009  Service Repair Manual DTC P0441 EVAP CONTROL SYSTEM
EC-793
< SERVICE INFOMATION >
[MR TYPE 1] C
D E
F
G H
I
J
K L
M A EC
NP
O
1. Start engine and warm it up to normal operating temperature.
2. Turn ignition switch OFF and

Page 2150 of 4331

NISSAN LATIO 2009  Service Repair Manual EC-794< SERVICE INFOMATION >
[MR TYPE 1]
DTC P0441 EVAP CONTROL SYSTEM
  With CONSULT-III
1. Disconnect vacuum hose connected to EVAP canister  purge volume control solenoid valve at EVAP ser-
vice po

Page 2154 of 4331

NISSAN LATIO 2009  Service Repair Manual EC-798< SERVICE INFOMATION >
[MR TYPE 1]
DTC P0442 EVAP CONTROL SYSTEM
If  DTC  Confirmation  Procedure  has  been  previously  conduc ted,  always  turn  ignition  switch  OFF  and  wait  at
least 10

Page 2156 of 4331

NISSAN LATIO 2009  Service Repair Manual EC-800< SERVICE INFOMATION >
[MR TYPE 1]
DTC P0442 EVAP CONTROL SYSTEM
4. Using  EVAP  leak  detector,  locate  the  EVAP  leak.  For  the  leak detector, refer to the instruction manual for more deta

Page 2161 of 4331

NISSAN LATIO 2009  Service Repair Manual EC
NP
O
On Board Diagnosis Logic
INFOID:0000000004537294
DTC Confirmation Procedure INFOID:0000000004537295
NOTE:
If  DTC  Confirmation  Procedure  has  been  previously  conduc ted,  always  turn  ig

Page 2163 of 4331

NISSAN LATIO 2009  Service Repair Manual DTC P0443 EVAP CANISTE
R PURGE VOLUME CONTROL SOLENOID VALVE
EC-807
< SERVICE INFOMATION >
[MR TYPE 1] C
D E
F
G H
I
J
K L
M A EC
NP
O
Do not use ECM ground terminals wh
en measuring input/output volt

Page 2164 of 4331

NISSAN LATIO 2009  Service Repair Manual EC-808< SERVICE INFOMATION >
[MR TYPE 1]
DTC P0443 EVAP CANISTER PURGE VO
LUME CONTROL SOLENOID VALVE
4. Check  voltage  between  EVAP  canister  purge  volume  control solenoid  valve  terminal  1  a

Page 2170 of 4331

NISSAN LATIO 2009  Service Repair Manual EC-814< SERVICE INFOMATION >
[MR TYPE 1]
DTC P0444, P0445 EVAP CANISTER 
PURGE VOLUME CONTROL SOLENOID 
VALVE
Do not use ECM ground terminals when measuring in put/output voltage. Doing so may result