EC-260
< COMPONENT DIAGNOSIS >[VK56DE]
P0455 EVAP CONTROL SYSTEM
•
Make sure that EVAP hoses are connected to EVAP canister purge volume control solenoid valve
properly.
• If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at
least 10 seconds before conducting the next test.
TESTING CONDITION:
• Perform “DTC WORK SUPPORT” when the fuel level is between 1/4 and 3/4 full, and vehicle is placed
on flat level surface.
• Open engine hood before conducting the following procedures.
WITH CONSULT-III
1. Tighten fuel filler cap secure ly until ratcheting sound is heard.
2. Turn ignition switch ON.
3. Turn ignition switch OFF and wait at least 10 seconds.
4. Turn ignition switch ON and select “DATA MONITOR” mode with CONSULT-III.
5. Make sure that the following conditions are met. COOLAN TEMP/S: 0 - 70 °C (32 - 158° F)
INT/A TEMP SE: 0 - 60 °C (32 - 140° F)
6. Select “EVP SML LEAK P0442/P1442” of “EVAPO RATIVE SYSTEM” in “DTC WORK SUPPORT” mode
with CONSULT-III.
Follow the instruction displayed.
NOTE:
If the engine speed cannot be maintained within t he range displayed on the CONSULT-III screen, go to
EC-13, "
Basic Inspection".
7. Make sure that “OK” is displayed. If “NG” is displayed, select “SELF-DIAG RE SULTS” mode and make sure that “EVAP GROSS LEAK
[P0455]” is displayed. If it is displayed, refer to EC-260, "
Diagnosis Procedure".
If P0442 is displayed, perform Diagnostic Procedure for DTC P0442, EC-225, "
Diagnosis Procedure".
WITH GST
NOTE:
Be sure to read the explanation of EC-462, "
DTC Index" before driving vehicle.
1. Start engine.
2. Drive vehicle according to EC-462, "
DTC Index".
3. Stop vehicle.
4. Turn ignition switch OFF, wait at least 10 seconds and then turn ON.
5. Select Service $07 with GST. • If P0441 is displayed on the screen, go to EC-220, "
Diagnosis Procedure".
• If P0442 is displayed on the screen, go to EC-225, "
Diagnosis Procedure".
• If P0455 is displayed on the screen, go to EC-260, "
Diagnosis Procedure".
Diagnosis ProcedureINFOID:0000000001351632
1.CHECK FUEL FILLER CAP DESIGN
1. Turn ignition switch OFF.
2. Check for genuine NISSAN fuel filler cap design.
OK or NG
OK >> GO TO 2.
NG >> Replace with genuine NISSAN fuel filler cap.
2.CHECK FUEL FILLER CAP INSTALLATION
Check that the cap is tightened proper ly by rotating the cap clockwise.
SEF915U
Revision: March 2010 2008 QX56
EC-268
< COMPONENT DIAGNOSIS >[VK56DE]
P0456 EVAP CONTROL SYSTEM
2. Set the pressure pump and a hose.
3. Also set a vacuum gauge via 3-way connector and a hose.
4. Turn ignition switch ON.
5. Connect GST and select Service $08.
6. Using Service $08, control the EV
AP canister vent control valve
(close).
7. Apply pressure and make sure the following conditions are sat- isfied.
Pressure to be applied: 2.7 kPa (20 mmHg, 0.79 inHg)
Time to be waited after the pressure drawn in to the EVAP
system and the pressure to be dropped: 60 seconds and
the pressure should not be dropped more than 0.4 kPa (3
mmHg, 0.12 inHg).
If NG, go to EC-268, "
Diagnosis Procedure" .
If OK, go to next step.
8. Disconnect GST.
9. Start engine and warm it up to normal operating temperature.
10. Turn ignition switch OFF and wait at least 10 seconds.
11. Restart engine and let it idle for 90 seconds.
12. Keep engine speed at 2,000 rpm for 30 seconds.
13. Turn ignition switch OFF. NOTE:
For more information, refer to GST Instruction Manual.
Diagnosis ProcedureINFOID:0000000001351636
1.CHECK FUEL FILLER CAP DESIGN
1. Turn ignition switch OFF.
2. Check for genuine NISSAN fuel filler cap design.
OK or NG
OK >> GO TO 2.
NG >> Replace with genuine NISSAN fuel filler cap.
2.CHECK FUEL FILLER CAP INSTALLATION
Check that the cap is tightened proper ly by rotating the cap clockwise.
OK or NG
OK >> GO TO 3.
NG >> 1. Open fuel filler cap, then clean cap and fuel filler neck threads using air blower.
2. Retighten until ratcheting sound is heard.
3.CHECK FUEL FILLER CAP FUNCTION
Check for air releasing sound while opening the fuel filler cap.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.CHECK FUEL TANK VACUUM RELIEF VALVE
Refer to EC-272, "
Component Inspection" .
OK or NG
OK >> GO TO 5.
NG >> Replace fuel filler cap with a genuine one.
SEF462UI
SEF915U
Revision: March 2010 2008 QX56
EC-308
< COMPONENT DIAGNOSIS >[VK56DE]
P1217 ENGINE OVER TEMPERATURE
4. Make sure that cooling fan operates.
OK or NG
OK >> GO TO 4.
NG >> Check cooling fan control circuit. (Go to "PROCEDURE
A".)
4.CHECK COOLING SYSTEM FOR LEAK
Refer to CO-10, "
Inspection".
OK or NG
OK >> GO TO 5.
NG >> Check the following for leak. •Hose
• Radiator
• Radiator cap
• Water pump
• Reservoir tank
5.CHECK COMPONENT PARTS
Check the following.
• RESERVOIR TANK CAP (Refer to CO-10, "
Inspection".)
• Thermostat. (Refer to CO-22, "
Removal and Installation".)
• Engine coolant temperature sensor. (Refer to EC-126, "
Component Inspection".)
OK or NG
OK >> GO TO 6.
NG >> Replace malfunctioning component.
6.CHECK MAIN 13 CAUSES
If the cause cannot be isolated, go to EC-308, "
Main 13 Causes of Overheating".
>> INSPECTION END
Main 13 Causes of OverheatingINFOID:0000000001351718
SEF882V
Engine Step Inspection item EquipmentStandardReference page
OFF 1 • Blocked radiator • Blocked condenser
• Blocked radiator grille
• Blocked bumper • Visual
No blocking —
2 • Coolant mixture • Coolant tester 50 - 50% coolant mixtureCO-10
3 • Coolant level • VisualCoolant up to MAX level in
reservoir tank and radiator
filler neck CO-11, "Changing Engine
Coolant"
4 • Reservoir tank cap • Pre
ssure tester 95 - 125 kPa
(0.97 - 1.28 kg/cm2, 14 -
18 psi) (Limit) CO-10, "
Inspection"
ON*25 • Coolant leaks
• VisualNo leaks CO-10, "Inspection"
ON*26 • Thermostat • Touch the upper and
lower radiator hoses Both hoses should be hot
CO-22, "Removal and In-
stallation"
ON*17 • Cooling fan • CONSULT-IIIOperating See trouble diagnosis for
DTC P1217 ( EC-36
).
Revision: March 2010 2008 QX56
P1217 ENGINE OVER TEMPERATUREEC-309
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
*1: Turn the ignition switch ON.
*2: Engine running at 3,000 rpm for 10 minutes.
*3: Drive at 90 km/h (55 MPH) for 30 minutes and then let idle for 10 minutes.
*4: After 60 minutes of cool down time.
For more information, refer to
CO-8, "
Troubleshooting Chart".
OFF 8 • Combustion gas leak • Color checker chemical
tester 4 Gas analyzerNegative
—
ON*
39 • Coolant temperature gauge • Visual Gauge less than 3/4 when
driving —
• Coolant overflow to res- ervoir tank • Visual
No overflow during driving
and idling CO-11, "
Changing Engine
Coolant"
OFF*410 • Coolant return from res-
ervoir tank to radiator • Visual Should be initial level in
reservoir tank CO-11, "Changing Engine
Coolant"
OFF 12 • Cylinder head
• Straight gauge feeler
gauge 0.1 mm (0.004 in) Maxi-
mum distortion (warping) EM-72, "Inspection After
Disassembly"
13 • Cylinder block and pis-
tons • Visual No scuffing on cylinder
walls or piston EM-90, "Inspection After
Disassembly"
Engine Step Inspection item
EquipmentStandardReference page
Revision: March 2010 2008 QX56
P1572 ICC BRAKE SWITCHEC-343
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
Without CONSULT-IIl
Check voltage between ECM terminal 101 and ground under the fol-
lowing conditions.
OK or NG
OK >> GO TO 14.
NG >> GO TO 7.
3.CHECK ICC BRAKE SWITCH POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect ICC brake switch harness connector.
3. Turn ignition switch ON.
4. Check voltage between ICC brake switch terminal 1 and ground with CONSULT-lll or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors M31, E152
• Fuse block (J/B) connector M4
• 10A fuse
• Harness for open or short between ICC brake switch and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK ICC BRAKE SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ICC brake switch terminal 2 and ECM terminal 108. Refer Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 6.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
6.CHECK ICC BRAKE SWITCH
Refer to EC-346, "
Component Inspection".
OK or NG
OK >> GO TO 14.
NG >> Replace ICC brake switch.
CONDITION VOLTAGE
Brake pedal: Fully released Approximately 0V
Brake pedal: Slightly depressed Battery voltage
PBIB1537E
Voltage: Battery voltage
BBIA0470E
Continuity should exist.
Revision: March 2010 2008 QX56
P1572 ICC BRAKE SWITCHEC-345
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
Check the following.
• Harness connectors M31, E152
• Fuse block (J/B) connector M60
• 10A fuse
• Harness for open or short between stop lamp switch and battery
>> Repair open circuit or short to ground or short to power in harness or connectors.
10.CHECK INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 101 and stop lamp switch terminal 4. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
5. Check harness continuity between ECM terminal 101 and ICC hold relay terminal 6. Refer to Wiring Diagram.
6. Also check harness for short to ground and short to power.
7. Disconnect ICC unit harness connector.
8. Check harness continuity between ECM terminal 101 and ICC unit terminal 38. Refer to Wiring Diagram.
9. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 12.
NG >> GO TO 11.
11 .DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E34, B40
• Harness for open or short between ICC unit and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
12.CHECK STOP LAMP SWITCH
Refer to EC-346, "
Component Inspection".
OK or NG
OK >> GO TO 13.
NG >> Replace stop lamp switch.
13.CHECK ICC BRAKE HOLD RELAY
Refer to EC-346, "
Component Inspection".
OK >> GO TO 14.
NG >> Replace ICC brake hold relay.
14.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
>> INSPECTION END
Continuity should exist.
Continuity should exist.
Continuity should exist.
Revision: March 2010
2008 QX56
P1572 ASCD BRAKE SWITCHEC-349
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
Without CONSULT-III
Check voltage between ECM terminal 101 and ground under the following conditions.
OK or NG
OK >> GO TO 11.
NG >> GO TO 7.
3.CHECK ASCD BRAKE SWITCH POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect ASCD brake switch harness connector.
3. Turn ignition switch ON.
4. Check voltage between ASCD brake switch terminal 1 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors M31, E152
• Fuse block (J/B) connector M4
• 10A fuse
• Harness for open or short between ASCD brake switch and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
CONDITION INDICATION
Brake pedal: Fully released OFF
Brake pedal: Slightly depressed ON
CONDITIONVOLTAGE
Brake pedal: Fully released Approximately 0V
Brake pedal: Slightly depressed Battery voltage
PBIB1537E
BBIA0373E
Voltage: Battery voltage
PBIB0857E
Revision: March 2010 2008 QX56
EC-350
< COMPONENT DIAGNOSIS >[VK56DE]
P1572 ASCD BRAKE SWITCH
5.CHECK ASCD BRAKE SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 108 and ASCD brake switch terminal 2. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 6.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
6.CHECK ASCD BRAKE SWITCH
Refer to EC-351, "
Component Inspection".
OK or NG
OK >> GO TO 11.
NG >> Replace ASCD brake switch.
7.CHECK STOP LAMP SWIT CH POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect stop lamp switch harness connector.
3. Check voltage between stop lamp switch terminal 3 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8.
8.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors M31, E152
• Fuse block (J/B) connector M60
• 10A fuse
• Harness for open or short between stop lamp switch and battery
>> Repair open circuit or short to ground or short to power in harness or connectors.
9.CHECK STOP LAMP SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Check harness continuity between ECM terminal 101 and stop lamp switch terminal 4. Refer to Wiring Diagram.Continuity should exist.
BBIA0373E
Voltage: Battery voltage
PBIB2102E
Revision: March 2010
2008 QX56