Page 36 of 1575
5.Remove the fuel inlet hose(A) from the delivery pipe.
6.Disconnect the engine wiring harness connectors.
(1) Disconnect the No.1/No.2 knock sensor connectors(A,B), the oil pressure switch connector(C), the ignition coil
harness(D) and the No.1 VIS(Variable Induction System) connector(E).
(2)Disconnect the bank 1 front/rear O2 sensor connectors(A).
(3)Disconnect the injection connectors(A,B,C), the ground lines(D), the condensor connector(E) and the Ignition
coil connectors(F).
Page 37 of 1575
(4)Disconnect the injection harness connector(A), the No.2 VIS(Variable Induction System) connector(B), the
No.1/No.2 OCV(Oil Control Valve) connectors(C,D) and the OTS(Oil Temperature Sensor) connector(E).
(5)Disconnect the MAPS(Manifold Absolute Pressure Sensor) connector(A), the ETC(Electronic Throttle Control)
connector(B) and the PCSV(Purge Control Solenoid Valve) connector(C).
(6)Disconnect the generator connector(A) and the air conditioning compressor connector(B).
Page 39 of 1575
8.Disconnect the brake vaccume hose(A).
9.Remove the heater hoses.
10. Remove the drive belt(A).
11.Remove the power steering pump.(Refer to 'ST' group).
12. Remove the exhaust manifold assembly.(Refer to 'Intake and exhause system').
13. Remove the intake manifold assembly.(Refer to 'Intake and exhause system').
14. Remove the timing belt.(Refer to 'Timing system').
15. Remove the ignition coils.
16. Remove the water temp. control assembly.
17. Remove the cylinder head cover(A).
Page 43 of 1575
Ensure the LH/RH classification of the cylinder head gasket when installing.
2. Tighten the cylinder head bolts with the plain washers in several steps as following order.
a.In assembling washers, the marked surface should face upward.
b. In installing the cylinder head bolts, apply engine oil on the thread of the bolts and the surface of the
washers.
Tightening torque
22.6~26.5Nm(2.3~2.7kgf.m, 16.6~19.5lb - ft) + (60° + 2°) + (45° + 2°)
Using the SST(09221- 4A000), tighten the bolts which need to be tightened with the angular tightening method.
3. Install the CVVT assembly and camshaft chain sprocket with the dowel pin in the CVVT installed to the intake
camshaft. Ensure that the pin will not be installed in the hole for oil feeding.
Page 44 of 1575
camshaft. Ensure that the pin will not be installed in the hole for oil feeding.
Tightening torque
66.7~78.5Nm(6.8~8.0kgf.m, 49.2~57.9lb - ft)
After tightening the CVVT bolts, rotate the CVVT assembly housing counterclockwise by hand to seat the lock
pin in the CVVT assembly in good position.
Fix the hexagonal part of the camshaft in a vice when tightening the CVVT bolts. Do not fix the CVVT housing
or sprocket in a vice.
4. Install the camshaft in the cylinder head assembly.
(1) Align the timing mark of the camshaft timinig chain.
LH camshaft chain timing mark
RH camshaft chain timing mark
Both timing marks should face upward in reassemby.
5. Install the timing chain tensioner.
(1) Insert the set pin by pressing the timing chain tensioner.
(2) Install the chain tensioner(A) in the cylinder head assembly.
Page 46 of 1575
7.Using the SST(09214- 21000), install the camshaft oil seal.
a.Befor installing, apply engine oil.
b. The camshaft cap surface should adhere to the cylinder head assembly.
c. Do not press an eccentric load.
8. Install the CKP sensor connector bracket(A).
9.Install the bank 1 timing belt rear cover(A).
10. Install the bank 2 timing belt rear cover(A).
Page 47 of 1575
The length of the bolt(B) is longer than that of the bolt(C).
11. Install the timing belt.(Refer to 'Timing system').
12. Check and adjust the valve clearance.
13. Install the cylinder head cover.
(1) Remove oil, dust or sealant on the upper surface of the cylinder before assembling cylinder head cover.
(2) Assemble the cylinder head cover in five minites after applying liquid gasket(LOCTITE 5900) on the camshaft
cap and packing part.
(3)Tighten the cylinder head cover bolts as following order(A).
Tightening torque
7.8~9.8Nm(0.8~1.0kgf.m, 5.8~7.2lb- ft)
Page 50 of 1575
(6)Connect the injection harness connector(A), the No.2 VIS(Variable Induction System) connector(B), the
No.1/No.2 OCV(Oil Control Valve) connectors(C,D) and the OTS(Oil Temperature Sensor) connector(E).
(7)Connect the injection connectors(A,B,C), the ground lines(D), the condensor connector(E) and the Ignition coil
connectors(F).
(8)Connect the bank 1 front/rear O2 sensor connectors(A).