EC-664Revision: October 2005
ASCD INDICATOR
2005 QX56
ASCD INDICATORPFP:24814
Component DescriptionUBS00HDT
ASCD indicator lamp illuminates to indicate ASCD operation status. Lamp has two indicators, CRUISE and
SET, and is integrated in combination meter.
CRUISE indicator illuminates when MAIN switch on ASCD steering switch is turned ON to indicate that ASCD
system is ready for operation.
SET indicator illuminates when following conditions are met.
CRUISE indicator is illuminated.
SET/COAST switch on ASCD steering switch is turned ON while vehicle speed is within the range of
ASCD setting.
SET indicator remains lit during ASCD control.
Refer to EC-29, "
AUTOMATIC SPEED CONTROL DEVICE (ASCD)" for the ASCD function.
CONSULT-II Reference Value in Data Monitor ModeUBS00HDU
Specification data are reference value.
MONITOR ITEM CONDITION SPECIFICATION
CRUISE LAMP
Ignition switch: ONMAIN switch: Pressed at the 1st
time → at the 2nd timeON → OFF
SET LAMP
MAIN switch: ON
When vehicle speed is
between 40 km/h (25 MPH)
and 144 km/h (89 MPH)
ASCD: Operating ON
ASCD: Not operating OFF
SERVICE DATA AND SPECIFICATIONS (SDS)
EC-669
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: October 20052005 QX56
SERVICE DATA AND SPECIFICATIONS (SDS)PFP:00030
Fuel PressureUBS00HE9
Idle Speed and Ignition TimingUBS00HEA
*: Under the following conditions:
Air conditioner switch: OFF
Electric load: OFF (Lights and heater fan)
Steering wheel: Kept in straight-ahead position
Calculated Load ValueUBS00HEB
Mass Air Flow SensorUBS00HEC
*: Engine is warmed up to normal operating temperature and running under no load.
Intake Air Temperature SensorUBS00HED
Engine Coolant Temperature SensorUBS00HEE
A/F Sensor 1 HeaterUBS00HEF
Heated Oxygen sensor 2 HeaterUBS00HEG
Crankshaft Position Sensor (POS)UBS00HEH
Refer to EC-290, "Component Inspection" .
Camshaft Position Sensor (PHASE)UBS00HEI
Refer to EC-297, "Component Inspection" .
Throttle Control MotorUBS00HEJ
Fuel pressure at idling kPa (kg/cm2 , psi)Approximately 350 (3.57, 51)
Target idle speed
No-load* (in P or N position)650±50 rpm
Air conditioner: ON In P or N position 700 rpm or more
Ignition timing In P or N position 15° ± 5° BTDC
Condition Calculated load value % (Using CONSULT-II or GST)
At idle14.0 - 33.0
At 2,500 rpm12.0 - 25.0
Supply voltage Battery voltage (11 - 14V)
Output voltage at idle1.0 - 1.3V*
Mass air flow (Using CONSULT-II or GST)3.0 - 9.0 g·m/sec at idle*
9.0 - 28.0 g·m/sec at 2,500 rpm*
Temperature °C (°F) Resistance kΩ
25 (77)1.94 - 2.06
80 (176)0.295 - 0.349
Temperature °C (°F) Resistance kΩ
20 (68)2.1 - 2.9
50 (122)0.68 - 1.00
90 (194)0.236 - 0.260
Resistance [at 25°C (77°F)] 2.3 - 4.3Ω
Resistance [at 25°C (77°F)] 5.0 - 7.0Ω
Resistance [at 25°C (77°F)] Approximately 1 - 15Ω
EM-12Revision: October 2005
DRIVE BELTS
2005 QX56
DRIVE BELTSPFP:02117
Checking Drive BeltsEBS00LLW
WAR NIN G:
Be sure to perform when the engine is stopped.
1. Remove the air duct and resonator assembly when inspecting drive belt. Refer to EM-14
.
2. Make sure that the indicator (single line notch) of each auto tensioner is within the allowable working
range (between three line notches).
NOTE:
Check the auto tensioner indication when the engine is cold.
When the new drive belt is installed, the range should be as shown.
The indicator notch is located on the moving side of the auto tensioner.
3. Visually check entire belt for wear, damage or cracks.
4. If the indicator is out of allowable working range or belt is damaged, replace the belt.
Tension AdjustmentEBS00LLX
Belt tensioning is not necessary, as it is automatically adjusted by the auto tensioner.
Removal and InstallationEBS00LLY
DRIVE BELT
Removal
1. Remove the air duct and resonator assembly. Refer to EM-14 .
2. Install Tool on auto tensioner pulley bolt, move in the direction of
arrow (loosening direction of tensioner) as shown.
CAUTION:
Avoid placing hand in a location where pinching may occur
if the holding tool accidentally comes off.
3. Remove the drive belt.
LBIA0391E
1. Drive belt 2. Power steering oil pump pulley 3. Generator pulley
4. Crankshaft pulley 5. A/C compressor 6. Idler pulley
7. Cooling fan pulley 8. Water pump pulley 9. Drive belt tensioner
Tool number : — (J-46535)
WBIA0537E
EM-36Revision: October 2005
TIMING CHAIN
2005 QX56
NOTE:
To remove timing chain and associated parts, start with those on the left bank. The procedure for remov-
ing parts on the right bank is omitted because it is the same as that for removal on the left bank.
To install timing chain and associated parts, start with those on the right bank. The procedure for installing
parts on the left bank is omitted because it is the same as that for installation on the right bank.
REMOVAL
1. Remove the engine assembly from the vehicle. Refer to EM-69, "REMOVAL" .
2. Remove the following components and related parts:
Drive belt auto tensioner and idler pulley. Refer to EM-12, "DRIVE BELTS" .
Thermostat housing and water hose. Refer to CO-19, "Removal of Thermostat Housing, Water Outlet
and Heater Pipe" .
Power steering pump bracket. Refer to PS-26, "REMOVAL" .
Oil pan (lower), (upper) and oil strainer. Refer to EM-22, "OIL PAN AND OIL STRAINER" .
Ignition coil. Refer to EM-26, "IGNITION COIL" .
Rocker cover. Refer to EM-33, "ROCKER COVER" .
3. Remove the chain case cover (right bank) and (left bank).
a. Loosen and remove the bolts in the reverse of order shown.
b. Cut the liquid gasket and remove the covers using Tool.
CAUTION:
Do not damage mating surfaces.
4. Obtain compression TDC of No. 1 cylinder as follows:
a. Turn the crankshaft pulley clockwise to align the TDC identifica-
tion notch (without paint mark) with the timing indicator on the
front cover.
1. Camshaft sprocket (left bank EXH) 2. Camshaft sprocket (left bank INT) 3. Camshaft sprocket (right bank INT)
4. Camshaft sprocket (right bank EXH) 5. Front cover 6. Chain case cover (right bank)
7. Chain case cover (left bank) 8. Crankshaft pulley bolt 9. Crankshaft pulley
10. Chain tensioner cover 11. Front oil seal 12. Oil pump drive spacer
13. Oil pump assembly 14. Crankshaft sprocket 15. Bracket
16. O-ring 17. Timing chain tension guide (right
bank)18. Timing chain slack guide (right bank)
19. Timing chain (right bank) 20. Timing chain (left bank) 21. Chain tensioner (right bank)
22. Timing chain slack guide (left bank) 23. Timing chain tension guide (left
bank)24. Chain tensioner (left bank)
Tool number: KV10111100 (J-37228)
KBIA2475E
KBIA2476E
EM-70Revision: October 2005
ENGINE ASSEMBLY
2005 QX56
5. Remove the cowl extension. Refer to EI-18, "Removal and Installation" .
6. Remove the engine room cover using power tools.
7. Remove the air duct and air cleaner case assembly EM-14, "
REMOVAL" .
8. Disconnect the vacuum hose between the vehicle and engine and set it aside.
9. Remove the radiator assembly and hoses. Refer to CO-12, "
REMOVAL" .
10. Remove the drive belts. Refer to EM-12, "
Removal" .
11. Remove the fan blade. Refer to CO-15, "
REMOVAL" .
12. Disconnect the engine room harness from the fuse box and set it aside.
13. Disconnect the ECM.
14. Disconnect the engine room harness from the engine side and set it aside.
15. Disconnect the engine harness grounds.
16. Disconnect the power steering reservoir tank from the engine and move it aside.
17. Disconnect the power steering oil pump from the engine. Move it aside and secure it using suitable wire or
rope. Refer to PS-26, "
REMOVAL" .
18. Remove the A/C compressor bolts and set the compressor aside. Refer to ATC-179, "
REMOVAL" .
19. Disconnect the brake booster vacuum line.
20. Disconnect the EVAP line.
21. Disconnect the fuel hose at the engine side connection. Refer to EM-29, "
REMOVAL" .
22. Disconnect the heater hoses at cowl, and install plugs to avoid leakage of engine coolant.
23. Remove the A/T oil level indicator and indicator tube upper bolts.
24. Remove the front final drive assembly (4x4 only). Refer to FFD-11, "
REMOVAL" .
25. Remove the exhaust manifolds. Refer to EM-19, "
Removal and Installation" .
26. Install the engine slingers into the left bank cylinder head and
right bank cylinder head.
27. Remove the A/T. Refer to AT-244, "
Removal and Installation
(4x2)" or AT-247, "Removal and Installation (4x4)" .
28. Lift using hoist and secure the engine in position.
29. Remove the engine assembly from the vehicle, avoid interfer-
ence with the vehicle body.
CAUTION:
Before and during lifting, always check if any harnesses
are left connected.
30. Remove the parts that may restrict installation of the engine to the engine stand.
NOTE:
This procedure is described assuming that you use an engine stand mounting to the surface to which the
transmission mounts.
a. Remove the drive plate.
Holding the crankshaft pulley bolt, lock the crankshaft to remove the drive plate bolts.
Loosen the bolts diagonally.
WBIA0464E
Engine slinger torque: 45.0 N·m (4.6 kg-m, 33 ft-lb)
PBIC1556E
EM-72Revision: October 2005
ENGINE ASSEMBLY
2005 QX56
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
When replacing an engine or transmission you must make sure the dowels are installed correctly
during re-assembly.
Improper alignment caused by missing dowels may cause vibration, oil leaks or breakage of driv-
etrain components.
INSPECTION AFTER INSTALLATION
Before starting the engine, check oil/fluid levels including engine coolant and engine oil. If the levels are
lower than required quantity, fill to the specified level. Refer to MA-11, "
RECOMMENDED FLUIDS AND
LUBRICANTS" .
Use procedure below to check for fuel leakage.
Turn ignition switch ON (with engine stopped). With fuel pressure applied to the fuel piping, check for fuel
leakage at the connection points.
Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gas, or any oils/fluids includ-
ing engine oil and engine coolant.
Bleed air from passages in lines and hoses, such as in cooling system.
After cooling down the engine, again check oil/fluid levels including engine oil and engine coolant. Refill to
specified level if necessary.
Summary of the inspection items:
*Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluids* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gas — Leakage —
PREPARATION
FAX-3
C
E
F
G
H
I
J
K
L
MA
B
FA X
Revision: October 20052005 QX56
PREPARATIONPFP:00002
Special Service ToolsEDS001XA
The actual shapes of Kent-Moore tools may differ from those of special service tools illustrated here.
Commercial Service Tools EDS001XB
Tool number
(Kent-Moore No.)
Tool nameDescription
ST29020001
(J-24319-01)
Gear arm pullerRemoving ball joint for steering knuckle
a: 34 mm (1.34 in)
b: 6.5 mm (0.256 in)
c: 61.5 mm (2.421 in)
KV40107300
(—)
Boot band crimping toolInstalling boot bands
NT694
ZZA1229D
Tool nameDescription
Power toolsRemoving bolts and nuts
PBIC0190E
FAX-4
NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTING
Revision: October 20052005 QX56
NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTINGPFP:00003
NVH Troubleshooting ChartEDS001XC
Use the chart below to help you find the cause of the symptom. If necessary, repair or replace these parts.
×: ApplicableReference page
FAX -1 3FA X - 7FA X - 5FA X - 5FA X - 7FA X - 5
PR-3, "
NVH Troubleshooting Chart
"
FFD-6, "
NVH Troubleshooting Chart
"
FSU-4, "
NVH Troubleshooting Chart
"
WT-4, "
NVH Troubleshooting Chart
"
WT-4, "
NVH Troubleshooting Chart
"
BR-5, "
NVH Troubleshooting Chart
"
PS-5, "
NVH Troubleshooting Chart
"
Possible cause and SUSPECTED PARTS
Excessive joint angle
Joint sliding resistance
Imbalance
Improper installation, looseness
Parts interference
Wheel bearing damage
PROPELLER SHAFT
FRONT FINAL DRIVE
SUSPENSION
TIRES
ROAD WHEEL
BRAKES
STEERING
SymptomNoise×× ×× ×××××××
Shake× ××× × ×××××
Vibration××××× × ×× ×
Shimmy× ×× ×××××
Shudder×××× ×××××
Poor quality ride or
handling××× ×××