Page 53 of 891
ENGINE E7J-26210
ENGINE ASSEMBLY
10 - 28
CYLINDERS BLOCK REMOUNTING
Clean the cylinders block, especially t he
jackets s eating and sealing surfaces.
Preparation of assembly
“ pistons-jackets”
The parts contained in the kit are in pairs.
Ma rk the part s assembly from A to D in
order to keep the matching.
Dismounting – Remounting
Remove completely the anti-rust foil.
REMARK:
Never scrape the parts. Jackets over-height
These engines are equipped with rubber
rings for jackets sealing, ensuring only the seal-
ing, jackets being seated directly on the cylin-
ders block and over-height being done from
manufacturing. The checking of the jackets over-height is
to be performed as follows: - place the jackets in the cylinders block
without the sealing ring;
- check t he X over-he ight by means of
the devices MOT 251-01 and MOT 252-01.
vnx.su
Page 55 of 891

ENGINE E7J-26210
ENGINE ASSEMBLY
10 - 30
The arrow marked on the piston head must
be oriented towards engine flywheel. The c onnecting rods ha ve no mounting
direction, but the ha lf-bearings spurs are to
be positioned on the same part. In order to assemble the piston and the
connecting rod, proceed as follows: -place the bushing B 13 on the support
and attach the piston (with the arrow oriented
upwards) on the bushing;
Dismounting – Remounting
- lubricate the centering guide and the
piston bolt with engine oil;
- check t he free gliding of the piston
bolt and the piston positioning.
When the connecting rod end is reaching
the necessary temperature (about 250 °C),
proceed to the ra pid of the piston bolt, as
follows: -introduce the centering guide in the
piston; - position the connecting rod i n the
piston;
-press till end the piston bold.
Check if the pi ston bolt is remaining re -
tired as against the piston outer diameter for
each of the connecting rod position in the pis-
ton.
Rings mounting
Mount the rings on the pi ston in the
following sequence: -
oiling ring ( 3);
-s ealing ri ng (2) w ith the mark “TOP”
upwards; -compression ri ng (1) with t he mark
“TOP” upward. The compression and sealing rings are to be
mounted with the slots disposed at 90° against
de bolt’s axle and displaced between them with
180°. The oiling ring is to be mounted with the
slot oriented at 45° against the bolt’s a xle.
The rings slots being adjusted, shall never be
reworked.
Lubricate the pistons with engine oil.
M ount the assemblies “connecting rod-
piston-rings” in the cylinder’s jackets, by means
of the mounting bushing. Mount the sealing gaskets on the cylinder
jackets.
vnx.su
Page 56 of 891

ENGINE E7J-26210
ENGINE ASSEMBLY
10 - 31
Mount the assembly i n the bl ock, as per
previous established sequence and check and
ensure that a 0.1 mm gauge is passing be-
tween jackets.
Dismounting – Remounting
MOT 484
Block the jackets by means of the device
MOT 484 or the clamps MOT 588.
M ount the base bearing on the cylinders
block. Hal-bearing lining that are mounted on
casing are provided with oiling holes.
The beari ngs lining are matching with the
crankshaft in two classes, as follows: Mount connecting rod bearings (connecting
rod bearings are the same) Lubricate the cranckpin and the bearings.
Mount the crankshaft and the axial bearings.
Mount the bearings caps. On the no.1 cap
(area K) apply a layer of LOCTITE 518, be-
tween 0.6 and 1 mm thick.
Tighten the bearings caps to a required mo-
ment of 2.5 daNm then to an a ngle of 43° ± 6°.
Check the axial clearance of the crankshaft,
which must be between:
*0.045 and 0.852 with wear;
* 0.045 and 0.252 without wear.
Marking on bearing
Red
Bl ue
Marking on crankshaft
A
B
Ide nt i dfi cation of m atching c lasses on
crankshaft i s performed by m arking on t he
balance-weight of bearing number 5. Marking example on crankshaft:
A AB AB
vnx.su
Page 57 of 891
ENGINE E7J-26210
ENGINE ASSEMBLY
10 - 32
The axial bearings may have the following
thickness: 2.80, 2.85, 2.90, 295 mm.
M ount the connecting rods caps and
tighten to the required moment of 4.2 daNm.
Check:
-connecting rods lateral clearance;
- assembly rotation.
Mount: -gear and driving chain of the oil pump;
- oil pump (check the existence of the
centering bushings) and tighten the screws to
the required moment of 2.5 daNm;
Dismounting – Remounting
MOT 550
- the crankshaft closing casing; the
sealing is performed using LOCTITE 518 (
the layer H must be 0.6 – 1 mm thick);
- sealing gasket from crankshaft clos-
ing casing (lubricated with oil) by means of
the MOT 550 device;
-crankshaft sealing gasket towards fly-
wheel (at no. 1 bearing) by means of the MOT
1129-01 device. Lubricate the sealing gasket external part
and lip with engine oil.
vnx.su
Page 66 of 891
ENGINE E7J-26210
ENGINE ASSEMBLY
10 - 41
DISMOUNTIN G
Drain the oil from the engine.
Dismount :
- lower casing (see chapter 10”Lower casing on vehicle”).
Dismount the oil pump attachmen t screws on casing.
Dismount the drive chain from the oil pump gear.
Dismount the oil pump cap.
Check the gears clearance in the oil pump (see chapter 10” Engine assembly”)
REMOU NT I NG
Perform the dismounting operations in the reverse order;
Fill up engine with oil
Check the oil pressure at 80 °C:
At idling 1 bar;
At 4000 rot/min 3 bar. Oil pump attachment screws 2.5
Oil pump cap attachment screws 1
TIGHTENING MOMENTS (daNm)
O
il pump
vnx.su
Page 74 of 891

ENGINE E7J-26212
12 - 2
F UEL M IXTURE
DENOMINATION PARTICU LARITIES
UCE injection SIEMENS - Connector with 90 ways
In jection system Sequential multi-point
I gnition Static with double coil PINI R (W)
I gnition control led by
RA- C0,52
ΩΩΩΩ
± 10%
UCE in
jectionRB-C0,52
ΩΩΩΩ
± 10%
R 1 -47,2 KΩΩΩΩ ±
10%
R
2-37,2 KΩΩ ΩΩ ±
10%
Characteristics
Detonation sensor Sagem – piezo-electric type
Tightening moment = 2 daNm.
RPM sensor ELECTRICFIL or SIEMENS
R = 200………….270 Ù
Spa rk plugs SAGEM – Type RFC 52 LZ
Ti ghtening moment = 2.5 –3 daNm
Fuel filter For de-pollution norm 1504
Mounted under the vehicle in front the fuel tank.
Replacement at every scheduled checking
For EURO 00 and EURO 96;
Insi de the fue l tank, attached on the fuel pump assembly.
Do not replace it separately.
Feeding pump Immersed in the fuel tank
For de-pol lution norm 1504:
- Flow: 1.3 l/min. Pressure: 3 bars at 12 V ten sion.
For EURO 00 and EURO 96:
- Pressure: 3.5 bars at 12 V tension.
Pressure regulator For de-pollution norm 1504:
Regulator attached on the injection ramp.
Adjusted pressure : 3 ± 0.2 b ars at zero depression
2.5± 0.2 bars at 500 mbars depression
For EURO 00 and EURO 96:
Mounted inside the fuel tank on the fuel pump assembly.
Adjusted pressure : 3.5 bars
Electro-magnetic Injectors SIEMEN S
R = 14.5 Ù ± 5 % AT 20 º C
Supply + 12V
Step by step engine R
A-D = 53 Ù 10% at 25º C
R
B- C = 53 Ù 10% at 25 ºC
vnx.su
Page 85 of 891

ENGINE E7J - 26214
14 - 2
ANTI-POLLUTION
Pet rol vapors re-aspiration
OPERATING PRINCIPLE
The communication of the t ank with t he
atmosphere is done through the carbon can. The petrol vapors are retained when they are
passing through the active carbon from the carbon
can. By means of a purging valve controlled by a
RCO signal issued by UCE injection, the petrol
vapors are re-aspired through piping by the intake
manifold.
The flow section of the purging valve is
variable, subject to the balance given by the
magnetic field created by supplying the purging
valve coil and the power of the spring ensuring
the valve closing.
RE-ASPIRATION CONDITIONS
The can-purging valve is controlled by pin
4 of the UCE injection, in the moment when:
-w ater tempera ture > 20 ° C;
- air temperature > 10 ° C;
- engine is running over a certain im-
posed charge; -valve potentiometer is not in the posi-
tion acceleration pedal not pressed.
By using the CLIP tester, it is possible the
reading of the RCO value (opening cyclic
ratio).
The purging valve is closed for a value
smaller than 0.7%. OPERATION CHECKING OF THE
CAN PURGING VALVE
A defective operation of the petrol vapors
re-aspiration system, may lead to an unstable
idling or even to the engine stopping. First of all, check:
-circuit conformity (see the operating
diagram)
-piping condition between the can and
the fuel tank (sealing, circuit clogging).
The (B) piping coming from the tank shall
be clogged.
Connect a manometer (-3…+3 bar) at the
(M) connection for communication with the
atmosphere and check at idling if there is
depression. Is there depression?
YES – Set conta ct off. Usi ng a
vacuum pump, apply a 500 - mbar depression
at the (A ) piping connection of t he purging
valve. The value of the red depression must
not have a variation more than 10 mbar
wi thin 10 seconds.
vnx.su
Page 96 of 891
IGNITION AND INJECTION
17
17 - 2
IGNITION COIL
The system is including a double coil (X), controlled by the electronic control unit (UCE).
The coil has and electric connector (Y) with four ways, and is simultaneously producing sparks at cylinders
1 and 4, when it is controlled by the pin 32 of the UCE injection and at cylinders 2 and 3, when it is controlled
by the pin 1 of the UCE injection.
Ignition system
ELECTRIC CONNECTOR
PINS FUNCTION
AControlling ignition a t
cy linders 1 and 4
B Controlling ignition a t
cy linders 2 and 3
C Supply 12 V (+DC)
CHECKIN G RESISTANCE
BETWEEN PINS
A-C 0.52
± 10 % Ω
B-C 0.52 ± 10 % Ω
HT - HT 7.2 ± 10 % KΩ
X
Y
vnx.su