COOLANT TEMPERATURE SENSOR -
3.3/3.8L - DESCRIPTION, ENGINE.........7-21
COOLANT TEMPERATURE SENSOR -
3.3/3.8L - INSTALLATION, ENGINE........7-22
COOLANT TEMPERATURE SENSOR -
3.3/3.8L - REMOVAL, ENGINE............7-21
COOLANT THERMOSTAT - 2.4L -
INSTALLATION, ENGINE................7-23
COOLANT THERMOSTAT - 2.4L -
REMOVAL, ENGINE....................7-23
COOLANT THERMOSTAT - 3.3/3.8L -
INSTALLATION, ENGINE................7-24
COOLANT THERMOSTAT - 3.3/3.8L -
REMOVAL, ENGINE....................7-23
COOLANT THERMOSTAT - DESCRIPTION,
ENGINE.............................7-22
COOLANT THERMOSTAT - DIAGNOSIS
AND TESTING, ENGINE.................7-23
COOLANT THERMOSTAT - OPERATION,
ENGINE.............................7-22
COOLER - DESCRIPTION, FLUID.........19-44
COOLER - DESCRIPTION,
TRANSMISSION OIL...................7-37
COOLER - INSPECTION, TRANSMISSION
OIL ................................7-37
COOLER - INSTALLATION, FLUID........19-45
COOLER - INSTALLATION,
TRANSMISSION OIL...................7-37
COOLER & LINES - DESCRIPTION, OIL . . . 9-138
COOLER & LINES - INSTALLATION, OIL . . . 9-138
COOLER & LINES - OPERATION, OIL.....9-138
COOLER & LINES - REMOVAL, OIL........9-138
COOLER - OPERATION, FLUID..........19-44
COOLER - REMOVAL, FLUID............19-44
COOLER - REMOVAL, TRANSMISSION
OIL ................................7-37
COOLER LINES - INSTALLATION,
TRANSMISSION OIL...................7-38
COOLER LINES - REMOVAL,
TRANSMISSION OIL...................7-38
COOLING SYSTEM - DESCRIPTION........7-1
COOLING SYSTEM - DIAGNOSIS AND
TESTING, ENGINE.....................7-14
COOLING SYSTEM - OPERATION..........7-2
COOLING SYSTEM AERATION -
DIAGNOSIS AND TESTING...............7-3
COOLING SYSTEM DEAERATION -
DIAGNOSIS AND TESTING...............7-4
COOLING SYSTEM DRAINING -
STANDARD PROCEDURE.................7-4
COOLING SYSTEM FILLING - STANDARD
PROCEDURE..........................7-5
COOLING SYSTEM FLOW CHECK -
DIAGNOSIS AND TESTING...............7-3
COOLING SYSTEM LEAK TEST -
DIAGNOSIS AND TESTING...............7-2
COOLING SYSTEM PRESSURE CAP
TESTING - DIAGNOSIS AND TESTING......7-27
COOLING SYSTEM REQUIREMENTS -
DESCRIPTION, ENGINE.................24-1
COOLING SYSTEM, SPECIAL TOOLS.......7-6
COOLING SYSTEM, WARNING - ENGINE . . 24-65
CORE - DESCRIPTION, HEATER . . . 24-101,24-83
CORE - DESCRIPTION, SERVICE PORT
VALVE .............................24-94
CORE - INSTALLATION, HEATER . . . 24-103,24-85
CORE - INSTALLATION, SERVICE PORT
VALVE .............................24-94
CORE - OPERATION, HEATER.....24-101,24-83
CORE - REMOVAL, HEATER......24-102,24-84
CORE - REMOVAL, SERVICE PORT
VALVE .............................24-94
CORE AND OIL GALLERY PLUGS -
STANDARD PROCEDURE, ENGINE....9-10,9-86
CORE FILLING - STANDARD
PROCEDURE, REAR HEATER...........24-101
CORE TUBES - INSTALLATION, HEATER . . . 24-85
CORE TUBES - REMOVAL, HEATER.......24-83
COUPLER - DESCRIPTION, VISCOUS......3-41
COUPLER - OPERATION, VISCOUS........3-42
COURTESY LAMP - INSTALLATION.......8L-21
COURTESY LAMP - REMOVAL..........8L-21
COVER - CLEANING, CYLINDER HEAD
.....9-31
COVER - DESCRIPTION, SHIFT
.........21-113
COVER - DESCRIPTION, WHEEL
.........22-19
COVER - INSPECTION, CYLINDER HEAD
. . . 9-31
COVER - INSTALLATION, BENCH SEAT
BACK
.............................23-103COVER - INSTALLATION, CYLINDER
HEAD...............................9-31
COVER - INSTALLATION, DRIVER
AIRBAG TRIM........................8O-7
COVER - INSTALLATION, FRONT SEAT
CUSHION SIDE......................23-94
COVER - INSTALLATION, FRONT SEAT
TRACK - REAR......................23-96
COVER - INSTALLATION, FRONT
SEATBACK..........................23-93
COVER - INSTALLATION, INSTRUMENT
PANEL TOP.........................23-69
COVER - INSTALLATION, LOWER
STEERING COLUMN..................23-70
COVER - INSTALLATION, OVER
STEERING COLUMN..................23-70
COVER - INSTALLATION, TIMING CHAIN . . 9-155
COVER - INSTALLATION, WHEEL........22-19
COVER - LEFT - INSTALLATION,
CYLINDER HEAD.....................9-103
COVER - LEFT - REMOVAL, CYLINDER
HEAD..............................9-103
COVER - QUAD BUCKET, 50/50 SPLIT,
BENCH - INSTALLATION, SEAT
CUSHION..........................23-100
COVER - QUAD BUCKET, 50/50 SPLIT,
BENCH - REMOVAL, SEAT CUSHION.....23-100
COVER - REMOVAL, BENCH SEAT BACK . . 23-103
COVER - REMOVAL, CYLINDER HEAD.....9-31
COVER - REMOVAL, DRIVER AIRBAG
TRIM...............................8O-7
COVER - REMOVAL, FRONT SEAT
CUSHION SIDE........................23-94
COVER - REMOVAL, FRONT SEAT TRACK
- REAR............................23-96
COVER - REMOVAL, FRONT SEATBACK . . . 23-93
COVER - REMOVAL, INSTRUMENT
PANEL TOP.........................23-68
COVER - REMOVAL, LOWER STEERING
COLUMN...........................23-70
COVER - REMOVAL, OVER STEERING
COLUMN...........................23-70
COVER - REMOVAL, TIMING CHAIN......9-153
COVER - REMOVAL, WHEEL............22-19
COVER - RIGHT - INSTALLATION,
CYLINDER HEAD.....................9-103
COVER - RIGHT - REMOVAL, CYLINDER
HEAD..............................9-102
COVER AND DISC RUNOUT - DIAGNOSIS
AND TESTING, CLUTCH.................6-6
COVER BACKING PLATE -
INSTALLATION, STEERING COLUMN......23-70
COVER BACKING PLATE - REMOVAL,
STEERING COLUMN..................23-70
COVER BALL BEARING - INSTALLATION,
END ...............................21-10
COVER BALL BEARING - REMOVAL, END . . . 21-9
COVER O-RING - INSTALLATION, REAR . . . 21-20
COVER O-RING - REMOVAL, REAR.......21-19
COVER SEAL - INSTALLATION, END......21-11
COVER SEAL - INSTALLATION, INPUT
SHAFT.............................21-14
COVER SEAL - REMOVAL, END..........21-11
COVER SEAL - REMOVAL, INPUT SHAFT . . 21-13
COVER-LEFT - INSTALLATION, CYLINDER
HEAD..............................9s-20
COVER-LEFT - REMOVAL, CYLINDER
HEAD..............................9s-20
COVER-RIGHT - INSTALLATION,
CYLINDER HEAD.....................9s-19
COVER-RIGHT - REMOVAL, CYLINDER
HEAD..............................9s-19
COVER(S) - DESCRIPTION, CYLINDER
HEAD.........................9-102,9s-19
COVER(S) - INSTALLATION, TIMING
BELT ...............................9-62
COVERS - QUAD BUCKET, 50/50 SPLIT,
BENCH - INSTALLATION, SEAT BACK
HINGE............................23-101
COVERS - QUAD BUCKET, 50/50 SPLIT,
BENCH - REMOVAL, SEAT BACK HINGE . . 23-101
COVER(S) - REMOVAL, TIMING BELT......9-61
COWL GRILLE - INSTALLATION
.........23-51
COWL GRILLE - REMOVAL
.............23-50
COWL TRIM - INSTALLATION
...........23-76
COWL TRIM - REMOVAL
...............23-76
C-PILLAR - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER-BOR
.............8O-13C-PILLAR - REMOVAL, SEAT BELT
HEIGHT ADJUSTER-BOR.............8O-13
C-PILLAR TRIM - INSTALLATION........23-77
C-PILLAR TRIM - REMOVAL............23-77
CRADLE CROSSMEMBER -
DESCRIPTION, FRONT..................13-9
CRADLE CROSSMEMBER THREAD
REPAIR - DESCRIPTION, FRONT..........13-9
CRANK - INSTALLATION, WINDOW.......23-21
CRANK - REMOVAL, WINDOW..........23-21
CRANKSHAFT - INSPECTION.........9-37,9s-7
CRANKSHAFT - INSTALLATION.......9-38,9s-7
CRANKSHAFT - REMOVAL...........9-37,9s-6
CRANKSHAFT END PLAY - STANDARD
PROCEDURE.....................9-36,9s-6
CRANKSHAFT END PLAY - STANDARD
PROCEDURE, MEASURING.............9-125
CRANKSHAFT MAIN BEARINGS -
INSTALLATION.......................9-124
CRANKSHAFT MAIN BEARINGS -
REMOVAL..........................9-124
CRANKSHAFT OIL SEAL - FRONT -
INSTALLATION...................9-127,9-40
CRANKSHAFT OIL SEAL - FRONT -
REMOVAL......................9-127,9-40
CRANKSHAFT OIL SEAL - REAR -
INSTALLATION...................9-129,9-42
CRANKSHAFT OIL SEAL - REAR -
REMOVAL......................9-128,9-41
CRANKSHAFT POSITION SENSOR -
DESCRIPTION.......................14-25
CRANKSHAFT POSITION SENSOR -
OPERATION.........................14-25
CRANKSHAFT POSITION SENSOR -
REMOVAL..........................14-25
CRANKSHAFT REAR OIL SEAL RETAINER
- INSTALLATION.....................9-129
CRANKSHAFT REAR OIL SEAL RETAINER
- REMOVAL.........................9-129
CRANKSHAFT SPROCKET -
INSTALLATION...................9-156,9-65
CRANKSHAFT SPROCKET - REMOVAL....9-156,
9-64
CROSSBAR - INSTALLATION, LUGGAGE
RACK..............................23-57
CROSSBAR - REMOVAL, LUGGAGE RACK . 23-56
CROSSMEMBER - DESCRIPTION, FRONT
CRADLE.............................13-9
CROSSMEMBER MOUNT BUSHINGS -
INSTALLATION, FRONT................13-12
CROSSMEMBER MOUNT BUSHINGS -
REMOVAL, FRONT....................13-12
CROSSMEMBER THREAD REPAIR -
DESCRIPTION, FRONT CRADLE..........13-9
CROSSOVER - INSTALLATION,
GEARSHIFT CABLE...................21-76
CROSSOVER - REMOVAL, GEARSHIFT
CABLE.............................21-73
CROSS-OVER PIPE - 3.3/3.8L -
INSTALLATION........................11-6
CROSS-OVER PIPE - 3.3/3.8L -
REMOVAL...........................11-6
CUP HOLDER - INSTALLATION..........23-64
CUP HOLDER - REMOVAL..............23-64
CUPHOLDER - INSTALLATION, QUAD
BUCKET SEAT SIDE SHIELD - NO
........23-97
CUPHOLDER - REMOVAL, QUAD BUCKET
SEAT SIDE SHIELD - NO
...............23-97
CURB HEIGHT MEASUREMENT -
STANDARD PROCEDURE
................2-55
CUSHION - INSTALLATION, FRONT/QUAD
SEAT
..............................23-93
CUSHION - INSTALLATION, STABILIZER
BAR
.................................2-4
CUSHION - REMOVAL, FRONT/QUAD
SEAT
..............................23-93
CUSHION - REMOVAL, STABILIZER BAR
....2-4
CUSHION COVER - QUAD BUCKET, 50/50
SPLIT, BENCH - INSTALLATION, SEAT
. . . 23-100
CUSHION COVER - QUAD BUCKET, 50/50
SPLIT, BENCH - REMOVAL, SEAT
.......23-100
CUSHION SIDE COVER - INSTALLATION,
FRONT SEAT
........................23-94
CUSHION SIDE COVER - REMOVAL,
FRONT SEAT
........................23-94
CV BOOT - INNER - INSTALLATION
........3-6
CV BOOT - INNER - REMOVAL
............3-6
RSINDEX9
Description Group-Page Description Group-Page Description Group-Page
CV BOOT - INNER/OUTER -
INSTALLATION........................3-17
CV BOOT - INNER/OUTER - REMOVAL.....3-15
CV BOOT - OUTER - INSTALLATION.......3-10
CV BOOT - OUTER - REMOVAL...........3-10
CYCLE - STANDARD PROCEDURE,
POWER DOOR LEARN................8N-28
CYCLE - STANDARD PROCEDURE,
POWER LIFTGATE LEARN...............8N-9
CYLINDER - DESCRIPTION, KEY/LOCK....19-20
CYLINDER - DESCRIPTION, STANDARD 4 . . . 8I-9
CYLINDER - INSTALLATION, KEY/LOCK . . . 19-20
CYLINDER - INSTALLATION, LOCK . . 23-19,23-42
CYLINDER - INSTALLATION, SLAVE.......6-11
CYLINDER - INSTALLATION, SUPPORT....23-43
CYLINDER - LHD - INSTALLATION,
MASTER............................6-10
CYLINDER - LHD - REMOVAL, MASTER.....6-9
CYLINDER - OPERATION, KEY/LOCK......19-20
CYLINDER - REMOVAL, KEY/LOCK.......19-20
CYLINDER - REMOVAL, LOCK......23-19,23-42
CYLINDER - REMOVAL, SLAVE...........6-11
CYLINDER - REMOVAL, SUPPORT.......23-43
CYLINDER - RHD - INSTALLATION,
MASTER.............................6-9
CYLINDER - RHD - REMOVAL, MASTER.....6-8
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER............5-35,5s-34
CYLINDER BORE FITTING - STANDARD
PROCEDURE, PISTON TO...............9-42
CYLINDER BORE HONING - STANDARD
PROCEDURE....................9-112,9-35
CYLINDER COMBUSTION PRESSURE
LEAKAGE TEST - DIAGNOSIS AND
TESTING.........................9-83,9-9
CYLINDER COMPRESSION PRESSURE
TEST - DIAGNOSIS AND TESTING.....9-83,9-9
CYLINDER (FLUID RESERVOIR) -
ASSEMBLY, MASTER..............5-38,5s-37
CYLINDER (FLUID RESERVOIR) -
DISASSEMBLY, MASTER...........5-37,5s-36
CYLINDER HEAD - CLEANING . . 9-100,9-26,9s-17
CYLINDER HEAD - DESCRIPTION....9-24,9-99,
9s-16
CYLINDER HEAD - INSPECTION.....9-101,9-26,
9s-17
CYLINDER HEAD - INSTALLATION . . . 9-101,9-26,
9s-18
CYLINDER HEAD - REMOVAL . . 9-100,9-25,9s-17
CYLINDER HEAD COVER - CLEANING......9-31
CYLINDER HEAD COVER - INSPECTION....9-31
CYLINDER HEAD COVER -
INSTALLATION........................9-31
CYLINDER HEAD COVER - LEFT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - LEFT -
REMOVAL..........................9-103
CYLINDER HEAD COVER - REMOVAL......9-31
CYLINDER HEAD COVER - RIGHT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - RIGHT -
REMOVAL..........................9-102
CYLINDER HEAD COVER-LEFT -
INSTALLATION
.......................9s-20
CYLINDER HEAD COVER-LEFT -
REMOVAL
..........................9s-20
CYLINDER HEAD COVER-RIGHT -
INSTALLATION
.......................9s-19
CYLINDER HEAD COVER-RIGHT -
REMOVAL
..........................9s-19
CYLINDER HEAD COVER(S) -
DESCRIPTION
..................9-102,9s-19
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING
...............9-24,9-99,9s-16
CYLINDER HEAD OFF - INSTALLATION
. . . 9-108,
9-33,9s-26
CYLINDER HEAD OFF - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HEAD ON - INSTALLATION
....9-108,
9-33,9s-26
CYLINDER HEAD ON - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HOUSING - INSTALLATION,
LOCK
..............................19-19
CYLINDER HOUSING - REMOVAL, LOCK
. . 19-17
CYLINDER LOCK SWITCH -
DESCRIPTION, DOOR
.................8N-40CYLINDER LOCK SWITCH - DIAGNOSIS
AND TESTING, DOOR.................8N-40
CYLINDER LOCK SWITCH - EXPORT -
DESCRIPTION, DOOR..................8N-3
CYLINDER LOCK SWITCH - EXPORT -
DIAGNOSIS AND TESTING, DOOR........8N-3
CYLINDER LOCK SWITCH - EXPORT -
INSTALLATION, DOOR.................8N-4
CYLINDER LOCK SWITCH - EXPORT -
OPERATION, DOOR....................8N-3
CYLINDER LOCK SWITCH - EXPORT -
REMOVAL, DOOR.....................8N-3
CYLINDER LOCK SWITCH -
INSTALLATION, DOOR.................8N-41
CYLINDER LOCK SWITCH - OPERATION,
DOOR.............................8N-40
CYLINDER LOCK SWITCH - REMOVAL,
DOOR.............................8N-41
CYLINDERS - INSPECTION, WHEEL . . 5-57,5s-59
CYLINDERS - INSTALLATION, WHEEL . 5-57,5s-60
CYLINDERS - REMOVAL, WHEEL....5-57,5s-59
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR OF . . 9-10,9-86
DAMPER - INSTALLATION, VIBRATION . . . 9-130,
9-47
DAMPER - REMOVAL, VIBRATION . . . 9-130,9-47
DATA BUS COMMUNICATION RECEIVE -
PCM INPUT - OPERATION..............8E-15
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-6
DATA LINK CONNECTOR - OPERATION.....8E-7
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC..........................8N-47
DAY / NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-47
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-47
DEAERATION - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-4
DECOUPLER PULLEY - DESCRIPTION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - DIAGNOSIS AND
TESTING, GENERATOR...........8F-25,8F-27
DECOUPLER PULLEY - INSTALLATION,
GENERATOR....................8F-26,8F-28
DECOUPLER PULLEY - OPERATION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - REMOVAL,
GENERATOR....................8F-26,8F-28
DEFINITION - DESCRIPTION, TRIP........25-1
DEFLECTOR - INSTALLATION, WIND.....23-121
DEFLECTOR - REMOVAL, WIND........23-121
DEFOGGER RELAY - DESCRIPTION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - INSTALLATION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - OPERATION, REAR
WINDOW............................8G-3
DEFOGGER RELAY - REMOVAL, REAR
WINDOW............................8G-3
DEFOGGER SWITCH - DESCRIPTION,
REAR WINDOW.......................8G-4
DEFOGGER SWITCH - OPERATION, REAR
WINDOW............................8G-4
DEFOGGER SYSTEM - DIAGNOSIS AND
TESTING, REAR WINDOW..............8G-2
DEFROSTER DUCT - INSTALLATION......24-50
DEFROSTER DUCT - REMOVAL..........24-50
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS...............8M-4
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL..................24-55
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL..................24-55
DEMISTER OUTLET - INSTALLATION.....24-46
DEMISTER OUTLET - REMOVAL.........24-45
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN
AIRBAG.............................8O-3
DETECTION ASSY - INSTALLATION,
NATURAL VAC LEAK
..................25-13
DETECTION ASSY - REMOVAL, NATURAL
VAC LEAK
..........................25-13
DETECTION PUMP - INSTALLATION,
LEAK
..............................25-13
DETECTION PUMP - REMOVAL, LEAK
....25-13
DEVICES - STANDARD PROCEDURE,
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE
........................8W-01-8DIAGNOSTIC SYSTEM - DIAGNOSIS AND
TESTING, ON-BOARD.................8F-21
DIAGNOSTIC TROUBLE CODES -
STANDARD PROCEDURE, OBTAINING.....8E-15
DIAGRAMS - 41TE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21-169
DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21s-75
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - SPECIAL TOOLS,
SCHEMATICS.......................21s-89
DIESEL - DESCRIPTION, 2.5L...........19-51
DIESEL - DIAGNOSIS AND TESTING,
SYSTEM CHARGE LEVEL TEST - 2.5L....24-68
DIESEL - INSTALLATION, 2.5L..........19-52
DIESEL - REMOVAL, 2.5L..............19-51
DIESEL ENGINE - DESCRIPTION, FUEL
REQUIREMENTS.......................0-6
DIESEL ENGINES - DESCRIPTION,
ENGINE OIL...........................0-6
DIESEL ENGINES - EXPORT -
DESCRIPTION........................0-24
DIESEL HEATER WIRING -
INSTALLATION, SUPPLEMENTAL........24-119
DIESEL HEATER WIRING - REMOVAL,
SUPPLEMENTAL....................24-119
DIESEL SUPPLEMENTAL CABIN HEATER
- DIAGNOSIS AND TESTING...........24-113
DIFFERENTIAL - ASSEMBLY............21-66
DIFFERENTIAL - DESCRIPTION...........21-62
DIFFERENTIAL - DISASSEMBLY.........21-62
DIFFERENTIAL - OPERATION............21-62
DIFFERENTIAL ASSEMBLY -
DESCRIPTION........................3-39
DIFFERENTIAL ASSEMBLY - OPERATION . . . 3-39
DIFFERENTIAL ASSEMBLY FLUID
CHANGE - STANDARD PROCEDURE.......3-40
DIFFERENTIAL BEARING PRELOAD -
ADJUSTMENT......................21-199
DIFFERENTIAL BEARING PRELOAD
MEASUREMENT AND ADJUSTMENT,
ADJUSTMENTS....................21s-100
DIFFERENTIAL CARRIER SEAL -
INSTALLATION........................21-9
DIFFERENTIAL CARRIER SEAL -
REMOVAL...........................21-9
DIFFERENTIAL SIDE GEAR END PLAY -
ADJUSTMENT.......................21-70
DIFFERENTIAL TURNING TORQUE -
ADJUSTMENT.......................21-69
DIMENSIONS - SPECIFICATIONS, BODY
OPENING..........................23-127
DIMENSIONS, SPECIFICATIONS - FRAME . . . 13-4
DIODE - INSTALLATION............8W-01-14
DIODE - REMOVAL................8W-01-14
DISC AND PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH................6-12
DISC AND PRESSURE PLATE - 2.5L TD -
REMOVAL, CLUTCH....................6-11
DISC BRAKE CALIPER - INSTALLATION,
REAR..........................5-30,5s-29
DISC BRAKE CALIPER - REMOVAL,
REAR..........................5-27,5s-26
DISC BRAKE CALIPER ADAPTER -
INSTALLATION, FRONT............5-31,5s-30
DISC BRAKE CALIPER ADAPTER -
REMOVAL, FRONT................5-31,5s-30
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - INSTALLATION,
FRONT.............................5s-26
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - REMOVAL, FRONT.....5s-23
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - INSTALLATION, FRONT........5-27
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - INSTALLATION, FRONT
........5-27
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-31
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) - REMOVAL
.......5-31
10 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
DISC BRAKE CALIPER GUIDE PINS (TRW
BRAKES) - INSTALLATION..............5s-30
DISC BRAKE CALIPER GUIDE PINS (TRW
BRAKES) - REMOVAL.................5s-30
DISC BRAKE CALIPER (TRW BRAKES) -
INSTALLATION, FRONT................5s-26
DISC BRAKE CALIPER (TRW BRAKES) -
REMOVAL, FRONT....................5s-23
DISC BRAKE SHOES - CLEANING....5-16,5-18,
5s-15,5s-17
DISC BRAKE SHOES - INSPECTION . . . 5-16,5-18,
5s-15,5s-17
DISC BRAKE SHOES - INSTALLATION,
REAR..........................5-19,5s-18
DISC BRAKE SHOES - REMOVAL, REAR . . . 5-17,
5s-16
DISC BRAKE SHOES (CONTINENTAL
TEVES BRAKES) - INSTALLATION,
FRONT.............................5s-15
DISC BRAKE SHOES (CONTINENTAL
TEVES BRAKES) - REMOVAL, FRONT.....5s-14
DISC BRAKE SHOES (DISC/DISC
BRAKES) - INSTALLATION, FRONT........5-16
DISC BRAKE SHOES (DISC/DISC
BRAKES) - REMOVAL, FRONT............5-14
DISC BRAKE SHOES (DISC/DRUM
BRAKES) - INSTALLATION, FRONT........5-17
DISC BRAKE SHOES (DISC/DRUM
BRAKES) - REMOVAL, FRONT............5-15
DISC BRAKE SHOES (TRW BRAKES) -
INSTALLATION, FRONT................5s-16
DISC BRAKE SHOES (TRW BRAKES) -
REMOVAL, FRONT....................5s-14
DISC BRAKES (EXPORT) - DESCRIPTION....5-13,
5s-12
DISC BRAKES (FRONT) - DESCRIPTION . . . 5-11,
5s-10
DISC BRAKES (FRONT) - OPERATION . 5-13,5s-12
DISC BRAKES (REAR) - DESCRIPTION....5-12,
5s-12
DISC BRAKES (REAR) - OPERATION . . 5-13,5s-13
DISC RUNOUT - DIAGNOSIS AND
TESTING, CLUTCH COVER...............6-6
DISCHARGE (ESD) SENSITIVE DEVICES -
STANDARD PROCEDURE,
ELECTROSTATIC...................8W-01-8
DISCHARGE LINE - INSTALLATION, A/C . . . 24-80
DISCHARGE LINE - REMOVAL, A/C.......24-79
DISPLAY TEST MODE, OPERATION - DRB
IIITSTATE ...........................25-9
DISSASEMBLY, REMOVAL..............24-51
DISTRIBUTION DUCT - INSTALLATION....24-57
DISTRIBUTION DUCT - REMOVAL........24-57
DISTRIBUTION DUCTS - INSTALLATION,
FLOOR.............................24-50
DISTRIBUTION DUCTS - REMOVAL,
FLOOR.............................24-50
DISTRIBUTION SYSTEM - DESCRIPTION,
POWER..........................8W-97-1
DISTRIBUTION SYSTEM - OPERATION,
POWER..........................8W-97-1
DISTRIBUTION SYSTEMS, SPECIAL
TOOLS - POWER...................8W-97-1
DOES NOT FILL - DIAGNOSIS AND
TESTING, VEHICLE...................25-16
DOME/CARGO LAMP - INSTALLATION....8L-22
DOME/CARGO LAMP - REMOVAL........8L-22
DOOR - INSTALLATION................23-16
DOOR - INSTALLATION, FUEL FILL.......23-52
DOOR - INSTALLATION, SLIDING........23-30
DOOR - REMOVAL....................23-15
DOOR - REMOVAL, FUEL FILL..........23-52
DOOR - REMOVAL, SLIDING............23-29
DOOR ACTUATOR - DESCRIPTION,
BLEND........................24-23,24-35
DOOR ACTUATOR - DESCRIPTION,
MODE.............................24-30
DOOR ACTUATOR - DESCRIPTION,
RECIRCULATION.....................24-32
DOOR ACTUATOR - INSTALLATION,
BLEND
........................24-23,24-36
DOOR ACTUATOR - INSTALLATION,
MODE
.............................24-31
DOOR ACTUATOR - INSTALLATION,
RECIRCULATION
.....................24-33
DOOR ACTUATOR - OPERATION, BLEND
. . 24-23,
24-35
DOOR ACTUATOR - OPERATION, MODE
. . . 24-30DOOR ACTUATOR - OPERATION,
RECIRCULATION.....................24-32
DOOR ACTUATOR - REAR -
DESCRIPTION, MODE.................24-39
DOOR ACTUATOR - REAR -
INSTALLATION, MODE.................24-40
DOOR ACTUATOR - REAR - OPERATION,
MODE.............................24-40
DOOR ACTUATOR - REAR - REMOVAL,
MODE.............................24-40
DOOR ACTUATOR - REMOVAL, BLEND . . . 24-23,
24-36
DOOR ACTUATOR - REMOVAL, MODE....24-30
DOOR ACTUATOR - REMOVAL,
RECIRCULATION.....................24-33
DOOR ADJUSTMENT - STANDARD
PROCEDURE, SLIDING................8N-28
DOOR ADJUSTMENTS, ADJUSTMENTS -
SLIDING............................23-30
DOOR BLOCKER LATCH - INSTALLATION,
FUEL FILL..........................23-53
DOOR BLOCKER LATCH - REMOVAL,
FUEL FILL..........................23-53
DOOR BLOCKER LATCH STRIKER -
INSTALLATION, FUEL FILL.............23-53
DOOR BLOCKER LATCH STRIKER -
REMOVAL, FUEL FILL.................23-53
DOOR BLOCKER LOCKOUT LINK -
INSTALLATION, FUEL FILL.............23-54
DOOR BLOCKER LOCKOUT LINK -
REMOVAL, FUEL FILL.................23-53
DOOR CONTROL MODULE -
DESCRIPTION, SLIDING...............8E-19
DOOR CONTROL MODULE -
INSTALLATION, SLIDING...............8E-20
DOOR CONTROL MODULE - OPERATION,
SLIDING............................8E-19
DOOR CONTROL MODULE - REMOVAL,
SLIDING............................8E-19
DOOR CYLINDER LOCK SWITCH -
DESCRIPTION.......................8N-40
DOOR CYLINDER LOCK SWITCH -
DIAGNOSIS AND TESTING.............8N-40
DOOR CYLINDER LOCK SWITCH -
EXPORT - DESCRIPTION................8N-3
DOOR CYLINDER LOCK SWITCH -
EXPORT - DIAGNOSIS AND TESTING......8N-3
DOOR CYLINDER LOCK SWITCH -
EXPORT - INSTALLATION...............8N-4
DOOR CYLINDER LOCK SWITCH -
EXPORT - OPERATION.................8N-3
DOOR CYLINDER LOCK SWITCH -
EXPORT - REMOVAL...................8N-3
DOOR CYLINDER LOCK SWITCH -
INSTALLATION......................8N-41
DOOR CYLINDER LOCK SWITCH -
OPERATION.........................8N-40
DOOR CYLINDER LOCK SWITCH -
REMOVAL..........................8N-41
DOOR GLASS - INSTALLATION..........23-17
DOOR GLASS - INSTALLATION, REAR . . . 23-111
DOOR GLASS - INSTALLATION, SLIDING . 23-110
DOOR GLASS - REMOVAL.............23-17
DOOR GLASS - REMOVAL, REAR.......23-111
DOOR GLASS - REMOVAL, SLIDING.....23-110
DOOR GLASS RUN WEATHERSTRIP -
INSTALLATION, FRONT...............23-113
DOOR GLASS RUN WEATHERSTRIP -
REMOVAL, FRONT...................23-113
DOOR INNER BELT MOLDING -
INSTALLATION, FRONT...............23-115
DOOR INNER BELT MOLDING -
REMOVAL, FRONT...................23-115
DOOR LEARN CYCLE - STANDARD
PROCEDURE, POWER.................8N-28
DOOR LOCK MOTOR - DIAGNOSIS AND
TESTING.......................8N-4,8N-41
DOOR LOCK MOTOR - INSTALLATION,
SLIDING.......................8N-44,8N-6
DOOR LOCK MOTOR - REMOVAL,
SLIDING.......................8N-44,8N-6
DOOR LOCK SWITCH - DIAGNOSIS AND
TESTING
.......................8N-4,8N-41
DOOR LOCK SWITCH - INSTALLATION
....8N-4,
8N-42
DOOR LOCK SWITCH - REMOVAL
. . . 8N-4,8N-42
DOOR MOTOR - DESCRIPTION, SLIDING
. . 8N-30
DOOR MOTOR - INSTALLATION, SLIDING
. 8N-31DOOR MOTOR - OPERATION, SLIDING . . . 8N-30
DOOR MOTOR - REMOVAL, SLIDING.....8N-30
DOOR OUTER BELT MOLDING -
INSTALLATION, FRONT...............23-113
DOOR OUTER BELT MOLDING -
REMOVAL, FRONT...................23-113
DOOR SILL PLATE - INSTALLATION,
SLIDING............................23-82
DOOR SILL PLATE - REMOVAL, SLIDING . . 23-82
DOOR SILL TRIM PLATE -
INSTALLATION.......................23-77
DOOR SILL TRIM PLATE - REMOVAL.....23-77
DOOR STOP BUMPER BEZEL -
INSTALLATION, SLIDING...............23-25
DOOR STOP BUMPER BEZEL -
REMOVAL, SLIDING..................23-25
DOOR SYSTEM - DESCRIPTION, POWER
SLIDING...........................8N-19
DOOR SYSTEM - DIAGNOSIS AND
TESTING, POWER SLIDING.............8N-22
DOOR SYSTEM - OPERATION, POWER
SLIDING...........................8N-21
DOOR WEATHERSTRIP - INSTALLATION,
FRONT............................23-114
DOOR WEATHERSTRIP - INSTALLATION,
SLIDING...........................23-115
DOOR WEATHERSTRIP - REMOVAL,
FRONT............................23-114
DOOR WEATHERSTRIP - REMOVAL,
SLIDING...........................23-115
DOSING PUMP - DESCRIPTION, FUEL . . . 24-115
DOSING PUMP - INSTALLATION, FUEL....24-116
DOSING PUMP - OPERATION, FUEL.....24-115
DOSING PUMP - REMOVAL, FUEL......24-115
DOWNSTREAM 1/2 - 2.4/3.3/3.8L -
REMOVAL..........................14-34
DOWNSTREAM 2/1, 2.4/3.3/3.8L -
INSTALLATION.......................14-34
D-PILLAR TRIM PANEL - INSTALLATION,
LEFT..............................23-78
D-PILLAR TRIM PANEL - INSTALLATION,
RIGHT.............................23-82
D-PILLAR TRIM PANEL - REMOVAL,
LEFT..............................23-78
D-PILLAR TRIM PANEL - REMOVAL,
RIGHT.............................23-81
DRAIN AND FILL - STANDARD
PROCEDURE, FLUID..................21-71
DRAIN TUBE - INSTALLATION..........23-120
DRAIN TUBE - REMOVAL.............23-119
DRAINCOCK - INSTALLATION, RADIATOR . . . 7-26
DRAINCOCK - REMOVAL, RADIATOR......7-26
DRAINING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-4
DRAINING FUEL TANK - STANDARD
PROCEDURE.........................14-2
DRAW TEST - STANDARD PROCEDURE,
IGNITION-OFF.......................8F-13
DRB IIITSTATE DISPLAY TEST MODE,
OPERATION..........................25-9
DRIER - DESCRIPTION, RECEIVER.......24-91
DRIER - INSTALLATION, RECEIVER......24-92
DRIER - OPERATION, RECEIVER.........24-91
DRIER - REMOVAL, RECEIVER..........24-91
DRIVE - ASSEMBLY, FINAL......21-195,21s-99
DRIVE - DESCRIPTION, FINAL..........21s-95
DRIVE - DESCRIPTION, FLEX...........8N-36
DRIVE - DISASSEMBLY, FINAL . . . 21-190,21s-96
DRIVE - INSTALLATION, FLEX..........8N-37
DRIVE - OPERATION, FINAL...........21s-96
DRIVE - OPERATION, FLEX.............8N-36
DRIVE - REMOVAL, FLEX..............8N-37
DRIVE BELT - DIAGNOSIS AND TESTING,
ACCESSORY..........................7-7
DRIVE BELT TENSION, SPECIFICATIONS -
ACCESSORY..........................7-5
DRIVE BELTS - 2.4L - ADJUSTMENTS.....7-10
DRIVE BELTS - 2.4L - CLEANING..........7-9
DRIVE BELTS - 2.4L - INSPECTION........7-9
DRIVE BELTS - 2.4L - INSTALLATION......7-10
DRIVE BELTS - 2.4L - REMOVAL..........7-8
DRIVE BELTS - 3.3/3.8L - CLEANING......7-11
DRIVE BELTS - 3.3/3.8L - INSPECTION
....7-11
DRIVE BELTS - 3.3/3.8L - INSTALLATION
. . . 7-12
DRIVE BELTS - 3.3/3.8L - REMOVAL
......7-11
DRIVE PLATE MISALIGNMENT -
DIAGNOSIS AND TESTING
...............6-6
DRIVE UNIT - DESCRIPTION, LOWER
....8N-32
RSINDEX11
Description Group-Page Description Group-Page Description Group-Page
DRIVE UNIT - INSTALLATION, LOWER....8N-33
DRIVE UNIT - OPERATION, LOWER......8N-32
DRIVE UNIT - REMOVAL, LOWER.......8N-33
DRIVE UNIT TRACK & RACK -
DESCRIPTION, LOWER................8N-34
DRIVE UNIT TRACK & RACK -
INSTALLATION, LOWER...............8N-34
DRIVE UNIT TRACK & RACK -
OPERATION, LOWER..................8N-34
DRIVE UNIT TRACK & RACK -
REMOVAL, LOWER...................8N-34
DRIVELINE MODULE - DESCRIPTION,
REAR...............................3-23
DRIVELINE MODULE - OPERATION,
REAR...............................3-23
DRIVELINE MODULE - SPECIFICATIONS,
REAR...............................3-34
DRIVELINE MODULE FLUIDS -
DESCRIPTION, AWD REAR...............0-6
DRIVELINE MODULE NOISE -
DIAGNOSIS AND TESTING, REAR.........3-24
DRIVELINE MODULE OPERATION -
DIAGNOSIS AND TESTING, REAR.........3-26
DRIVER AIRBAG - DESCRIPTION.........8O-6
DRIVER AIRBAG - INSTALLATION........8O-7
DRIVER AIRBAG - OPERATION...........8O-6
DRIVER AIRBAG - REMOVAL............8O-6
DRIVER AIRBAG TRIM COVER -
INSTALLATION.......................8O-7
DRIVER AIRBAG TRIM COVER -
REMOVAL...........................8O-7
DRIVER HEATED SEAT SWITCH -
DESCRIPTION........................8G-8
DRIVER HEATED SEAT SWITCH -
DIAGNOSIS AND TESTING..............8G-9
DRIVER HEATED SEAT SWITCH -
INSTALLATION......................8G-10
DRIVER HEATED SEAT SWITCH -
OPERATION..........................8G-8
DRIVER HEATED SEAT SWITCH -
REMOVAL..........................8G-10
DRIVER POWER SEAT TRACK -
DESCRIPTION..................8N-15,8N-58
DRIVER POWER SEAT TRACK -
DIAGNOSIS AND TESTING........8N-15,8N-58
DRIVER POWER SEAT TRACK -
INSTALLATION.................8N-16,8N-59
DRIVER POWER SEAT TRACK -
OPERATION...................8N-15,8N-58
DRIVER POWER SEAT TRACK -
REMOVAL.....................8N-16,8N-59
DRIVER SEAT SWITCH - DESCRIPTION . . . 8N-10,
8N-53
DRIVER SEAT SWITCH - DIAGNOSIS
AND TESTING..................8N-11,8N-54
DRIVER SEAT SWITCH - INSTALLATION . . 8N-12,
8N-55
DRIVER SEAT SWITCH - OPERATION....8N-11,
8N-54
DRIVER SEAT SWITCH - REMOVAL . 8N-12,8N-55
DRIVING CLUTCHES - DESCRIPTION....21-190,
21s-95
DRIVING CLUTCHES - OPERATION.....21-190,
21s-95
DROP - STANDARD PROCEDURE,
TESTING FOR A VOLTAGE...........8W-01-10
DRUM - INSTALLATION............5-32,5s-31
DRUM - REMOVAL...............5-32,5s-31
DRUM BRAKE - INSTALLATION,
SUPPORT PLATE.................5-56,5s-58
DRUM BRAKE - REMOVAL, SUPPORT
PLATE .........................5-56,5s-58
DRUM BRAKE AUTOMATIC ADJUSTER -
DIAGNOSIS AND TESTING.........5-13,5s-13
DRUM BRAKE SHOE LINING -
INSPECTION, REAR...............5-22,5s-21
DRUM BRAKE SHOES - ADJUSTMENT,
REAR..........................5-23,5s-22
DRUM BRAKE SHOES - INSTALLATION,
REAR..........................5-22,5s-21
DRUM BRAKE SHOES - REMOVAL, REAR . . 5-19,
5s-18
DRUM BRAKES (REAR) - DESCRIPTION
. . . 5-13,
5s-12
DUAL ZONE - DESCRIPTION
.............24-2
DUAL ZONE - OPERATION
...............24-5
DUCT - INSTALLATION, DEFROSTER
.....24-50
DUCT - INSTALLATION, DISTRIBUTION
. . . 24-57DUCT - INSTALLATION, REAR FLOOR
HEAT ..............................24-63
DUCT - REMOVAL, DEFROSTER.........24-50
DUCT - REMOVAL, DISTRIBUTION.......24-57
DUCT - REMOVAL, REAR FLOOR HEAT . . . 24-62
DUCTS - INSTALLATION, FLOOR
DISTRIBUTION.......................24-50
DUCTS - INSTALLATION, INSTRUMENT
PANEL.............................24-55
DUCTS - INSTALLATION, INSTRUMENT
PANEL DEMISTER....................24-55
DUCTS - REMOVAL, FLOOR
DISTRIBUTION.......................24-50
DUCTS - REMOVAL, INSTRUMENT
PANEL.............................24-55
DUCTS - REMOVAL, INSTRUMENT
PANEL DEMISTER....................24-55
DUTY, CARGO - INSTALLATION, AWD,
HEAVY..............................2-36
DUTY, CARGO - REMOVAL, AWD, HEAVY . . . 2-36
DVD PLAYER - DESCRIPTION............8A-8
DVD PLAYER - INSTALLATION...........8A-8
DVD PLAYER - OPERATION.............8A-8
DVD PLAYER - REMOVAL...............8A-8
ELECTROLYTE LEVEL - STANDARD
PROCEDURE, CHECKING BATTERY.......8F-14
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - DESCRIPTION........5-75
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - OPERATION..........5-77
ELECTRONIC VEHICLE INFO CENTER -
DESCRIPTION........................8M-6
ELECTRONIC VEHICLE INFO CENTER -
INSTALLATION.......................8M-9
ELECTRONIC VEHICLE INFO CENTER -
OPERATION.........................8M-7
ELECTRONIC VEHICLE INFO CENTER -
REMOVAL...........................8M-9
ELECTRONIC VEHICLE INFORMATION
CENTER - DIAGNOSIS AND TESTING......8M-7
ELECTRONIC VEHICLE INFORMATION
CENTER PROGRAMMING - STANDARD
PROCEDURE.........................8M-7
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE DEVICES - STANDARD
PROCEDURE......................8W-01-8
ELEMENT - INSTALLATION, AIR
CLEANER........................9-24,9-98
ELEMENT - REMOVAL, AIR CLEANER . . 9-24,9-98
ELEMENTS - DESCRIPTION, HEATED
SEAT ..............................8G-10
ELEMENTS - DIAGNOSIS AND TESTING,
HEATED SEAT .......................8G-10
ELEMENTS - INSTALLATION, HEATED
SEAT ..............................8G-11
ELEMENTS - OPERATION, HEATED SEAT . . 8G-10
ELEMENTS - REMOVAL, HEATED SEAT . . . 8G-11
E-MARK LABEL - DESCRIPTION.......Intro.-11
EMISSION CONTROL INFORMATION
LABEL - DESCRIPTION, VEHICLE.........25-1
END CAP - INSTALLATION, INSTRUMENT
PANEL.............................23-68
END CAP - REMOVAL, INSTRUMENT
PANEL.............................23-68
END COVER BALL BEARING -
INSTALLATION.......................21-10
END COVER BALL BEARING - REMOVAL . . . 21-9
END COVER SEAL - INSTALLATION......21-11
END COVER SEAL - REMOVAL..........21-11
END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE GEAR.............21-70
END PLAY - STANDARD PROCEDURE,
CRANKSHAFT....................9-36,9s-6
END PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT................9-29
END PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT.............9-125
END SEAL - INSTALLATION, INPUT
SHAFT.............................21-16
END SEAL - REMOVAL, INPUT SHAFT....21-15
ENGAGE ACTUATOR - DESCRIPTION.....8N-10
ENGAGE ACTUATOR - INSTALLATION.....8N-11
ENGAGE ACTUATOR - OPERATION
.......8N-11
ENGAGE ACTUATOR - REMOVAL
........8N-11
ENGINE - CLEANING
...................7-18
ENGINE - DESCRIPTION, 2.4L/3.3L/3.8L
. . . 19-51
ENGINE - DESCRIPTION, FUEL
REQUIREMENTS - DIESEL
...............0-6ENGINE - INSPECTION.................7-18
ENGINE - INSTALLATION, 2.4L.....19-46,19-49,
19-50,19-52
ENGINE - INSTALLATION, 3.3L/3.8L . 19-47,19-49,
19-50,19-52
ENGINE - INSTALLATION, A/C
COMPRESSOR MOUNTING BRACKET -
2.4L...............................24-76
ENGINE - REMOVAL, 2.4L . . . 19-45,19-48,19-50,
19-51
ENGINE - REMOVAL, 3.3L/3.8L....19-45,19-48,
19-50,19-51
ENGINE - REMOVAL, A/C COMPRESSOR
MOUNTING BRACKET - 2.4L............24-75
ENGINE - SPECIFICATIONS, 2.4L.....9-17,9s-1
ENGINE - STANDARD PROCEDURE,
HYDROSTATIC LOCKED.............9-10,9-85
ENGINE 2.4L - DESCRIPTION.............9-3
ENGINE 3.3/3.8L - DESCRIPTION.........9-76
ENGINE ASSEMBLY - INSTALLATION . . 9-16,9-89
ENGINE ASSEMBLY - REMOVAL......9-13,9-86
ENGINE BLOCK - CLEANING........9-112,9-36
ENGINE BLOCK - DESCRIPTION.....9-112,9-35
ENGINE BLOCK - INSPECTION......9-112,9-36
ENGINE BLOCK HEATER - DESCRIPTION . . . 7-20
ENGINE BLOCK HEATER - INSTALLATION . . . 7-20
ENGINE BLOCK HEATER - OPERATION.....7-20
ENGINE BLOCK HEATER - REMOVAL......7-20
ENGINE BLOCK HEATER TESTING -
DIAGNOSIS AND TESTING................7-20
ENGINE COOLANT - DESCRIPTION........7-19
ENGINE COOLANT - DESCRIPTION.........0-3
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - DESCRIPTION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - INSTALLATION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - REMOVAL.............7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - DESCRIPTION.......7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - INSTALLATION.......7-22
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - REMOVAL..........7-21
ENGINE COOLANT THERMOSTAT - 2.4L -
INSTALLATION........................7-23
ENGINE COOLANT THERMOSTAT - 2.4L -
REMOVAL...........................7-23
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - INSTALLATION...............7-24
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - REMOVAL...................7-23
ENGINE COOLANT THERMOSTAT -
DESCRIPTION........................7-22
ENGINE COOLANT THERMOSTAT -
DIAGNOSIS AND TESTING..............7-23
ENGINE COOLANT THERMOSTAT -
OPERATION..........................7-22
ENGINE COOLING SYSTEM - DIAGNOSIS
AND TESTING........................7-14
ENGINE COOLING SYSTEM
REQUIREMENTS - DESCRIPTION.........24-1
ENGINE COOLING SYSTEM, WARNING
....24-65
ENGINE CORE AND OIL GALLERY PLUGS
- STANDARD PROCEDURE
..........9-10,9-86
ENGINE DIAGNOSIS - INTRODUCTION -
DIAGNOSIS AND TESTING
...........9-3,9-76
ENGINE DIAGNOSIS - MECHANICAL -
DIAGNOSIS AND TESTING
...........9-6,9-80
ENGINE DIAGNOSIS - PERFORMANCE -
DIAGNOSIS AND TESTING
...........9-4,9-78
ENGINE GASKET SURFACE
PREPARATION - STANDARD
PROCEDURE
.....................9-11,9-85
ENGINE MOUNTING - DESCRIPTION
. 9-131,9-48
ENGINE OIL - DESCRIPTION, FLEXIBLE
FUEL
................................0-3
ENGINE OIL - DIESEL ENGINES -
DESCRIPTION
.........................0-6
ENGINE OIL AND FILTER CHANGE -
STANDARD PROCEDURE
...........9-137,9-53
ENGINE OIL AND LUBRICANTS -
DESCRIPTION
.........................0-1
ENGINE OIL LEAK INSPECTION -
DIAGNOSIS AND TESTING
...........9-8,9-82
ENGINE OIL LEVEL CHECK - STANDARD
PROCEDURE
........................9-137
12 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-13
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-5
FILLING - STANDARD PROCEDURE,
REAR HEATER CORE.................24-101
FILTER - DESCRIPTION, AIR............24-43
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-44
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-43
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID..........21-203,21s-104
FINAL DRIVE - ASSEMBLY......21-195,21s-99
FINAL DRIVE - DESCRIPTION............21s-95
FINAL DRIVE - DISASSEMBLY....21-190,21s-96
FINAL DRIVE - OPERATION............21s-96
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-85
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-85
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-13
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-13
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-14
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-14
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-12
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-12
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-70
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT.....................14-14
FLANGE SEAL - INSTALLATION, INPUT....3-45
FLANGE SEAL - INSTALLATION, OUTPUT . . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT
...............21-7
FLAP AND SPRING ASSEMBLY -
INSTALLATION, QUAD BUCKET SEAT
SIDE SHIELD/CUPHOLDER
............23-107
FLAP AND SPRING ASSEMBLY -
REMOVAL, QUAD BUCKET SEAT SIDE
SHIELD/CUPHOLDER
.................23-107
FLEX DRIVE - DESCRIPTION
...........8N-36
FLEX DRIVE - INSTALLATION
...........8N-37
FLEX DRIVE - OPERATION
.............8N-36
FLEX DRIVE - REMOVAL
...............8N-37
FLEX PLATE - INSTALLATION
...........9-131
FLEX PLATE - REMOVAL
...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION
.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION
............23-83FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-83
FLOOR CONSOLE TRAY - INSTALLATION . . 23-83
FLOOR CONSOLE TRAY - REMOVAL......23-83
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-50
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-50
FLOOR HEAT DUCT - INSTALLATION,
REAR..............................24-63
FLOOR HEAT DUCT - REMOVAL, REAR . . . 24-62
FLOOR MATS - INSTALLATION, CARPETS . 23-76
FLOOR MATS - REMOVAL, CARPETS.....23-75
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, AUTOMATIC/
MANUAL TRANSAXLE...................0-4
FLUID - DESCRIPTION, AWD POWER
TRANSFER UNIT.......................0-6
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE.......21-203,21s-104
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU......................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE.............5-32,5s-31
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING....................21-123,21s-31
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE.......21-201,21s-102
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE..............5-32,5s-31
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE.........................5-11,5s-10
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-12
FLUID LEVEL SWITCH - OPERATION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
.........................5-11,5s-10
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-12
FLUID, SPECIFICATIONS - BRAKE
....5-33,5s-32
FLUIDS - DESCRIPTION, AWD REAR
DRIVELINE MODULE
....................0-6
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-124
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - INSTALLATION, FRONT
.......8L-8
FOG LAMP - REMOVAL, FRONT
..........8L-8
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT
........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT
.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER
..............8N-48FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - INSTALLATION, SPRING
MOUNTS............................2-44
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - REMOVAL, SPRING MOUNTS.....2-43
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION.....5-54,
5s-57
FRONT BRAKE ROTOR - REMOVAL . . . 5-54,5s-57
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-30
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-29
FRONT CABLE - INSTALLATION.....5-64,5s-67
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER...........5-66,5s-69
FRONT CABLE - REMOVAL.........5-64,5s-67
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER...................5-65,5s-68
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION
.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION
............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL
................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION
.................5-31,5s-30
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL
.....................5-31,5s-30
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
INSTALLATION
.......................5s-26
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
REMOVAL
..........................5s-23
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - INSTALLATION
..............5s-26
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - REMOVAL
.................5s-23
14 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
KEY REMOTE ENTRY MODULE -
INSTALLATION, SENTRY................8Q-6
KEY REMOTE ENTRY MODULE -
OPERATION, SENTRY..................8Q-4
KEY REMOTE ENTRY MODULE -
REMOVAL, SENTRY...................8Q-5
KEY REMOTE ENTRY SYSTEM -
DIAGNOSIS AND TESTING, SENTRY.......8Q-3
KEYLESS ENTRY MODULE -
DESCRIPTION, REMOTE...............8N-43
KEYLESS ENTRY MODULE - DIAGNOSIS
AND TESTING, REMOTE...............8N-43
KEYLESS ENTRY MODULE -
INSTALLATION, REMOTE..............8N-44
KEYLESS ENTRY MODULE - OPERATION,
REMOTE...........................8N-43
KEYLESS ENTRY MODULE - REMOVAL,
REMOTE...........................8N-44
KEYLESS ENTRY TRANSMITTER -
DIAGNOSIS AND TESTING.........8N-42,8N-5
KEYLESS ENTRY TRANSMITTER
PROGRAMMING - STANDARD
PROCEDURE, REMOTE.................8N-5
KEY/LOCK CYLINDER - DESCRIPTION....19-20
KEY/LOCK CYLINDER - INSTALLATION....19-20
KEY/LOCK CYLINDER - OPERATION......19-20
KEY/LOCK CYLINDER - REMOVAL.......19-20
KNOB - INSTALLATION, GEARSHIFT......21-87
KNOB - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER...................8O-14
KNOB - REMOVAL, GEARSHIFT..........21-87
KNOB - REMOVAL, SEAT BELT HEIGHT
ADJUSTER.........................8O-14
KNOCK SENSOR - DESCRIPTION..........8I-8
KNOCK SENSOR - OPERATION...........8I-8
KNUCKLE - DESCRIPTION................2-6
KNUCKLE - INSPECTION, STEERING........2-9
KNUCKLE - INSTALLATION, STEERING......2-9
KNUCKLE - OPERATION.................2-7
KNUCKLE - REMOVAL, STEERING.........2-7
LABEL - DESCRIPTION, E-MARK......Intro.-11
LABEL - DESCRIPTION, VECI.........Intro.-11
LABEL - DESCRIPTION, VEHICLE
CERTIFICATION....................Intro.-11
LABEL - DESCRIPTION, VEHICLE
EMISSION CONTROL INFORMATION.......25-1
LAMP - DESCRIPTION, VTSS/SKIS
INDICATOR..........................8Q-7
LAMP - DIAGNOSIS AND TESTING,
FRONT FOG..........................8L-7
LAMP - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP - INSTALLATION, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - INSTALLATION, COURTESY......8L-21
LAMP - INSTALLATION, DOME/CARGO....8L-22
LAMP - INSTALLATION, FRONT FOG.......8L-8
LAMP - INSTALLATION, LICENSE........8L-17
LAMP - INSTALLATION, LIFTGATE.......8L-22
LAMP - INSTALLATION, PARK/TURN
SIGNAL............................8L-18
LAMP - INSTALLATION, READING........8L-23
LAMP - INSTALLATION, TAIL...........8L-19
LAMP - INSTALLATION, VANITY.........8L-24
LAMP - OPERATION, VTSS/SKIS
INDICATOR..........................8Q-8
LAMP - REMOVAL, CENTER CONSOLE....8L-21
LAMP - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - REMOVAL, COURTESY..........8L-21
LAMP - REMOVAL, DOME/CARGO.......8L-22
LAMP - REMOVAL, FRONT FOG..........8L-8
LAMP - REMOVAL, LICENSE............8L-17
LAMP - REMOVAL, LIFTGATE...........8L-22
LAMP - REMOVAL, PARK/TURN SIGNAL . . 8L-18
LAMP - REMOVAL, READING...........8L-23
LAMP - REMOVAL, TAIL...............8L-18
LAMP - REMOVAL, VANITY.............8L-24
LAMP REPLACEMENT - STANDARD
PROCEDURE, MODULE................8M-3
LAMP REPLACEMENT - STANDARD
PROCEDURE, READING/COURTESY
.......8M-3
LAMP SWITCH - DESCRIPTION, BRAKE
....8L-4
LAMP SWITCH - DIAGNOSIS AND
TESTING, BRAKE
......................8L-4
LAMP SWITCH - INSTALLATION,
BACK-UP
...........................21-62
LAMP SWITCH - INSTALLATION, BRAKE
. . . 8L-5LAMP SWITCH - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - INSTALLATION, GLOVE
BOX ...............................8L-22
LAMP SWITCH - OPERATION, BRAKE......8L-4
LAMP SWITCH - REMOVAL, BACK-UP....21-62
LAMP SWITCH - REMOVAL, BRAKE.......8L-5
LAMP SWITCH - REMOVAL, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - REMOVAL, GLOVE BOX . . 8L-22
LAMP UNIT - INSTALLATION, CENTER
HIGH MOUNTED STOP.................8L-6
LAMP UNIT - INSTALLATION, TAIL.......8L-19
LAMP UNIT - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP UNIT - REMOVAL, TAIL...........8L-19
LAMP UNIT ALIGNMENT - EXPORT -
STANDARD PROCEDURE, FRONT FOG.....8L-9
LAMP UNIT ALIGNMENT - STANDARD
PROCEDURE, FRONT FOG...............8L-9
LAMPS - INSTALLATION, CLUSTER
ILLUMINATION......................8L-21
LAMPS - REMOVAL, CLUSTER
ILLUMINATION......................8L-21
LAMPS, SPECIFICATIONS - EXTERIOR.....8L-3
LAMPS, SPECIFICATIONS - INTERIOR....8L-20
LAMPS/LIGHTING - EXTERIOR -
DESCRIPTION........................8L-2
LAMPS/LIGHTING - EXTERIOR -
OPERATION..........................8L-2
LAMPS/LIGHTING - EXTERIOR -
WARNING...........................8L-3
LASH ADJUSTER NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING, HYDRAULIC....9-34
LASH ADJUSTERS - INSTALLATION,
HYDRAULIC..........................9-34
LASH ADJUSTERS - REMOVAL,
HYDRAULIC..........................9-34
LATCH - DESCRIPTION...........8N-13,8N-29
LATCH - INSTALLATION.....23-18,23-41,23-61
LATCH - INSTALLATION..........8N-14,8N-29
LATCH - INSTALLATION, FUEL FILL
DOOR BLOCKER.....................23-53
LATCH - INSTALLATION, GLOVE BOX.....23-64
LATCH - INSTALLATION, HOLD OPEN.....23-25
LATCH / LOCK ASSEMBLY -
INSTALLATION.......................23-27
LATCH / LOCK ASSEMBLY - REMOVAL....23-26
LATCH - OPERATION............8N-13,8N-29
LATCH - REMOVAL.........23-18,23-41,23-61
LATCH - REMOVAL..............8N-13,8N-29
LATCH - REMOVAL, FUEL FILL DOOR
BLOCKER...........................23-53
LATCH - REMOVAL, GLOVE BOX.........23-64
LATCH - REMOVAL, HOLD OPEN........23-25
LATCH ACTUATOR - DESCRIPTION......8N-14
LATCH ACTUATOR - INSTALLATION......8N-14
LATCH ACTUATOR - OPERATION........8N-14
LATCH ACTUATOR - REMOVAL..........8N-14
LATCH CABLE - INSTALLATION, HOLD
OPEN..............................23-38
LATCH CABLE - REMOVAL, HOLD OPEN . . . 23-38
LATCH HANDLE - INSTALLATION, INSIDE . . 23-34
LATCH HANDLE - REMOVAL, INSIDE.....23-34
LATCH LOCKING LINK - INSTALLATION,
SEAT RISER........................23-106
LATCH LOCKING LINK - REMOVAL, SEAT
RISER
............................23-106
LATCH RELEASE CABLE - INSTALLATION
. . 23-62
LATCH RELEASE CABLE - REMOVAL
.....23-61
LATCH STRIKER - INSTALLATION
. . 23-19,23-41,
23-62
LATCH STRIKER - INSTALLATION, FUEL
FILL DOOR BLOCKER
.................23-53
LATCH STRIKER - INSTALLATION, GLOVE
BOX
...............................23-64
LATCH STRIKER - INSTALLATION, HOLD
OPEN
..............................23-26
LATCH STRIKER - INSTALLATION, REAR
. . 23-29
LATCH STRIKER - REMOVAL
. 23-19,23-41,23-62
LATCH STRIKER - REMOVAL, FUEL FILL
DOOR BLOCKER
.....................23-53
LATCH STRIKER - REMOVAL, GLOVE
BOX
...............................23-64
LATCH STRIKER - REMOVAL, HOLD
OPEN
..............................23-26
LATCH STRIKER - REMOVAL, REAR
......23-29LEAD - DIAGNOSIS AND TESTING,
TIRE/VEHICLE..................22-14,22s-6
LEAF SPRING FRONT BUSHING -
INSTALLATION........................2-30
LEAF SPRING FRONT BUSHING -
REMOVAL...........................2-29
LEAK DETECTION ASSY - INSTALLATION,
NATURAL VAC.......................25-13
LEAK DETECTION ASSY - REMOVAL,
NATURAL VAC.......................25-13
LEAK DETECTION PUMP - INSTALLATION . 25-13
LEAK DETECTION PUMP - REMOVAL.....25-13
LEAK DIAGNOSIS, DIAGNOSIS AND
TESTING - FLUID......................21-3
LEAK INSPECTION - DIAGNOSIS AND
TESTING, ENGINE OIL...............9-8,9-82
LEAK REPAIRING - STANDARD
PROCEDURE, TIRE..............22-17,22s-9
LEAK TEST - DIAGNOSIS AND TESTING,
COOLING SYSTEM.....................7-2
LEAKAGE - DIAGNOSIS AND TESTING,
TORQUE CONVERTER HOUSING FLUID . . 21-123,
21s-31
LEAKAGE TEST - DIAGNOSIS AND
TESTING, CYLINDER COMBUSTION
PRESSURE.......................9-83,9-9
LEAKS - DIAGNOSIS AND TESTING,
INTAKE MANIFOLD...............9-145,9-58
LEAKS - DIAGNOSIS AND TESTING,
REFRIGERANT SYSTEM...............24-66
LEAKS - DIAGNOSIS AND TESTING,
WATER .............................23-1
LEARN CYCLE - STANDARD
PROCEDURE, POWER DOOR.............8N-28
LEARN CYCLE - STANDARD
PROCEDURE, POWER LIFTGATE..........8N-9
LEARN PROCEDURE - STANDARD
PROCEDURE, QUICK.............8E-16,8E-23
LEFT - CLEANING, EXHAUST MANIFOLD . . 9-152
LEFT - INSPECTION, EXHAUST
MANIFOLD..........................9-152
LEFT - INSTALLATION, CYLINDER HEAD
COVER.............................9-103
LEFT - INSTALLATION, EXHAUST
MANIFOLD..........................9-152
LEFT - REMOVAL, CYLINDER HEAD
COVER.............................9-103
LEFT - REMOVAL, EXHAUST MANIFOLD . . . 9-152
LEFT B-PILLAR SWITCH - DESCRIPTION . . 8N-32
LEFT B-PILLAR SWITCH - INSTALLATION . 8N-32
LEFT B-PILLAR SWITCH - OPERATION....8N-32
LEFT B-PILLAR SWITCH - REMOVAL.....8N-32
LEFT D-PILLAR TRIM PANEL -
INSTALLATION.......................23-78
LEFT D-PILLAR TRIM PANEL - REMOVAL . 23-78
LEFT MOUNT - INSTALLATION......9-133,9-50
LEFT MOUNT - REMOVAL..........9-133,9-49
LEFT OUTBOARD - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT OUTBOARD - REMOVAL, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT QUARTER TRIM PANEL -
INSTALLATION.......................23-80
LEFT QUARTER TRIM PANEL - REMOVAL
. 23-80
LENS - INSTALLATION, CLUSTER
........8J-10
LENS - REMOVAL, CLUSTER
............8J-10
LEVEL - STANDARD PROCEDURE,
CHECKING BATTERY ELECTROLYTE
......8F-14
LEVEL - STANDARD PROCEDURE,
REFRIGERANT OIL
...................24-93
LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE - FLUID
......21-201,
21s-102
LEVEL CHECK - STANDARD
PROCEDURE, COOLANT
.................7-5
LEVEL CHECK - STANDARD
PROCEDURE, ENGINE OIL
..............9-137
LEVEL CHECK - STANDARD
PROCEDURE, FLUID
..................21-71
LEVEL CHECK, STANDARD PROCEDURE
- ENGINE OIL
........................9-53
LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE FLUID
........5-32,5s-31
LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING FLUID
. . . 19-44
LEVEL INSPECTION - STANDARD
PROCEDURE, FLUID
...................21-4
RSINDEX19
Description Group-Page Description Group-Page Description Group-Page
POWER TRANSFER UNIT, SPECIAL
TOOLS - SDP........................21-8
POWER WINDOWS - DESCRIPTION......8N-62
POWER WINDOWS - DIAGNOSIS AND
TESTING...........................8N-62
POWER WINDOWS - OPERATION........8N-62
POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON FUSES . 8W-01-10
PRECAUTIONS AND WARNINGS,
WARNING - SAFETY...................23-1
PRECAUTIONS, WARNING -
WINDSHIELD SAFETY................23-108
PREFERENCE - STANDARD PROCEDURE,
HORN CHIRP...................8N-42,8N-5
PRELOAD - ADJUSTMENT,
DIFFERENTIAL BEARING..............21-199
PRELOAD MEASUREMENT AND
ADJUSTMENT, ADJUSTMENTS -
DIFFERENTIAL BEARING.............21s-100
PREPARATION - STANDARD
PROCEDURE, ENGINE GASKET
SURFACE........................9-11,9-85
PRESSURE - DIAGNOSIS AND TESTING,
CHECKING ENGINE OIL.................9-52
PRESSURE - DIAGNOSIS AND TESTING,
ENGINE OIL.........................9-136
PRESSURE CAP - DESCRIPTION,
RADIATOR...........................7-26
PRESSURE CAP - OPERATION,
RADIATOR...........................7-27
PRESSURE CAP TESTING - DIAGNOSIS
AND TESTING, COOLING SYSTEM........7-27
PRESSURE FOR HIGH SPEED
OPERATION - STANDARD PROCEDURE,
TIRE..........................22-17,22s-9
PRESSURE LEAKAGE TEST - DIAGNOSIS
AND TESTING, CYLINDER
COMBUSTION.....................9-83,9-9
PRESSURE MONITORING -
DESCRIPTION, TIRE..............22-9,22s-1
PRESSURE MONITORING - OPERATION,
TIRE...........................22-9,22s-1
PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH DISC...........6-12
PRESSURE PLATE - 2.5L TD - REMOVAL,
CLUTCH DISC........................6-11
PRESSURE REGULATOR -
INSTALLATION, FUEL..................14-7
PRESSURE REGULATOR - OPERATION,
FUEL...............................14-7
PRESSURE REGULATOR - REMOVAL,
FUEL...............................14-7
PRESSURE RELEASE PROCEDURE -
STANDARD PROCEDURE, FUEL
SYSTEM............................14-2
PRESSURE RELIEF VALVE -
DESCRIPTION, HIGH..................24-73
PRESSURE RELIEF VALVE -
INSTALLATION, OIL...................9-141
PRESSURE RELIEF VALVE - OPERATION,
HIGH..............................24-73
PRESSURE RELIEF VALVE - REMOVAL,
OIL
................................9-141
PRESSURE SENSOR - DIAGNOSIS AND
TESTING, TIRE
..................22-10,22s-2
PRESSURE SENSOR RETRAIN -
STANDARD PROCEDURE, TIRE
.....22-10,22s-2
PRESSURE, SPECIFICATIONS - FUEL
SYSTEM
............................14-3
PRESSURE SWITCH - DESCRIPTION, OIL
. 9-141
PRESSURE SWITCH - INSTALLATION,
OIL
...........................9-141,9-54
PRESSURE SWITCH - OPERATION, OIL
. . . 9-141
PRESSURE SWITCH - REMOVAL, OIL
....9-141,
9-54
PRESSURE TEST - DIAGNOSIS AND
TESTING, CYLINDER COMPRESSION
. . . 9-83,9-9
PRESSURE TEST - DIAGNOSIS AND
TESTING, POWER STEERING SYSTEM
FLOW
...............................19-1
PRESSURE TESTS - DIAGNOSIS AND
TESTING, CLUTCH AIR
.........21-122,21s-30
PRESSURE TESTS - DIAGNOSIS AND
TESTING, HYDRAULIC
..........21-120,21s-28
PRESSURE TRANSDUCER -
DESCRIPTION, A/C
...................24-21PRESSURE TRANSDUCER - DIAGNOSIS
AND TESTING, A/C...................24-22
PRESSURE TRANSDUCER -
INSTALLATION, A/C...................24-22
PRESSURE TRANSDUCER - OPERATION,
A/C................................24-21
PRESSURE TRANSDUCER - REMOVAL,
A/C................................24-22
PRESSURES - STANDARD PROCEDURE,
TIRE INFLATION.................22-16,22s-8
PROBLEM CAUSES - DIAGNOSIS AND
TESTING, COMMON..................21-30
PROGRAMING - STANDARD
PROCEDURE, RKE TRANSMITTER.......8N-43
PROGRAMMABLE COMMUNICATIONS
INTERFACE (PCI) BUS, OPERATION......14-21
PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION CENTER................8M-7
PROGRAMMING - STANDARD
PROCEDURE, PCM/SKIM................8E-2
PROGRAMMING - STANDARD
PROCEDURE, REMOTE KEYLESS
ENTRY TRANSMITTER.................8N-5
PROGRAMMING - STANDARD
PROCEDURE, TRANSPONDER...........8Q-6
PROPELLER SHAFT - DESCRIPTION.......3-21
PROPELLER SHAFT - INSTALLATION......3-22
PROPELLER SHAFT - OPERATION........3-21
PROPELLER SHAFT - REMOVAL..........3-21
PROPELLER SHAFT - SPECIFICATIONS.....3-22
PROPORTIONING - DESCRIPTION,
ELECTRONIC VARIABLE BRAKE............5-75
PROPORTIONING - OPERATION,
ELECTRONIC VARIABLE BRAKE..........5-77
PROPORTIONING VALVE (HEIGHT
SENSING) - DESCRIPTION.........5-48,5s-51
PROPORTIONING VALVE (HEIGHT
SENSING) - DIAGNOSIS AND TESTING....5-49,
5s-52
PROPORTIONING VALVE (HEIGHT
SENSING) - INSTALLATION.........5-51,5s-53
PROPORTIONING VALVE (HEIGHT
SENSING) - OPERATION...........5-48,5s-51
PROPORTIONING VALVE (HEIGHT
SENSING) - REMOVAL............5-50,5s-53
PTU FLUID CHANGE - STANDARD
PROCEDURE.........................21-5
PULLEY - DESCRIPTION, GENERATOR
DECOUPLER....................8F-25,8F-27
PULLEY - DIAGNOSIS AND TESTING,
GENERATOR DECOUPLER.........8F-25,8F-27
PULLEY - INSTALLATION, GENERATOR
DECOUPLER....................8F-26,8F-28
PULLEY - INSTALLATION, TIMING BELT
TENSIONER..........................9-69
PULLEY - OPERATION, GENERATOR
DECOUPLER....................8F-25,8F-27
PULLEY - REMOVAL, GENERATOR
DECOUPLER....................8F-26,8F-28
PULLEY - REMOVAL, TIMING BELT
TENSIONER..........................9-68
PUMP - 2.4L - CLEANING, WATER........7-32
PUMP - 2.4L - DESCRIPTION, WATER.....7-31
PUMP - 2.4L - INSPECTION, WATER......7-32
PUMP - 2.4L - INSTALLATION, WATER.....7-32
PUMP - 2.4L - REMOVAL, WATER........7-31
PUMP - 3.3/3.8L - CLEANING, WATER.....7-34
PUMP - 3.3/3.8L - DESCRIPTION,
WATER .............................7-33
PUMP - 3.3/3.8L - INSPECTION, WATER . . . 7-34
PUMP - 3.3/3.8L - INSTALLATION,
WATER .............................7-34
PUMP - 3.3/3.8L - REMOVAL, WATER.....7-33
PUMP - ASSEMBLY, OIL...........9-143,9-56
PUMP - ASSEMBLY, OIL.......21-232,21s-132
PUMP - CLEANING, OIL...........9-142,9-56
PUMP - DESCRIPTION, FUEL............14-8
PUMP - DESCRIPTION, FUEL DOSING . . . 24-115
PUMP - DESCRIPTION, OIL.............9-142
PUMP - DESCRIPTION, OIL.....21-230,21s-131
PUMP - DISASSEMBLY, OIL........9-142,9-55
PUMP - DISASSEMBLY, OIL
....21-230,21s-131
PUMP - INSPECTION, OIL
..........9-142,9-56
PUMP - INSTALLATION, FUEL DOSING
. . . 24-116
PUMP - INSTALLATION, LEAK
DETECTION
.........................25-13
PUMP - INSTALLATION, OIL
........9-144,9-57PUMP - INSTALLATION, SEAL - OIL....21-233,
21s-133
PUMP - OPERATION, FUEL..............14-8
PUMP - OPERATION, FUEL DOSING.....24-115
PUMP - OPERATION, OIL......21-230,21s-131
PUMP - REMOVAL, FUEL DOSING......24-115
PUMP - REMOVAL, LEAK DETECTION....25-13
PUMP - REMOVAL, OIL............9-142,9-55
PUMP - REMOVAL, SEAL - OIL . . 21-232,21s-133
PUMP (2.4L ENGINE) - INSTALLATION....19-42
PUMP (2.4L ENGINE) - REMOVAL.......19-38
PUMP (2.4L/3.3L/3.8L ENGINE) -
DESCRIPTION.......................19-36
PUMP (2.5L DIESEL) - DESCRIPTION.....19-36
PUMP (2.5L DIESEL) - INSTALLATION....19-43
PUMP (2.5L DIESEL) - REMOVAL........19-40
PUMP (3.3L/3.8L ENGINE) -
INSTALLATION.......................19-43
PUMP (3.3L/3.8L ENGINE) - REMOVAL . . . 19-40
PUMP INITIAL OPERATION - STANDARD
PROCEDURE, POWER STEERING........19-37
PUMP INLET TUBE - 2.4L -
DESCRIPTION, WATER.................7-35
PUMP INLET TUBE - 2.4L -
INSTALLATION, WATER.................7-35
PUMP INLET TUBE - 2.4L - REMOVAL,
WATER .............................7-35
PUMP INLET TUBE - 3.3/3.8L -
INSTALLATION, WATER.................7-36
PUMP INLET TUBE - 3.3/3.8L -
REMOVAL, WATER....................7-36
PUMP MODULE - DESCRIPTION, FUEL....14-8
PUMP MODULE - INSTALLATION, FUEL....14-9
PUMP MODULE - OPERATION, FUEL......14-8
PUMP MODULE - REMOVAL, FUEL........14-8
PUMP MOTOR - INSTALLATION, FRONT
WASHER............................8R-8
PUMP MOTOR - INSTALLATION, REAR
WASHER...........................8R-10
PUMP MOTOR - REMOVAL, FRONT
WASHER............................8R-8
PUMP MOTOR - REMOVAL, REAR
WASHER...........................8R-10
PUMP (PULLEY) - ASSEMBLY..........19-41
PUMP (PULLEY) - DISASSEMBLY........19-41
PUMP RELAY - DESCRIPTION, FUEL.....14-28
PUMP RELAY - OPERATION, FUEL.......14-28
PUMP, SPECIAL TOOLS - POWER
STEERING..........................19-43
PUSH-PIN GROMMET REPLACEMENT -
STANDARD PROCEDURE..............8N-28
PUSHRODS - DESCRIPTION.......9-109,9s-26
PUSHRODS - OPERATION.........9-109,9s-26
QUAD BUCKET - INSTALLATION, BUCKET
SEAT BACK.........................23-99
QUAD BUCKET - INSTALLATION, SEAT
BELT BUCKLE - FIRST ROW INBOARD....8O-12
QUAD BUCKET - REMOVAL, BUCKET
SEAT BACK.........................23-98
QUAD BUCKET - REMOVAL, SEAT BELT
BUCKLE - FIRST ROW INBOARD........8O-12
QUAD BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT BACK HINGE
COVERS...........................23-101
QUAD BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT CUSHION COVER . . 23-100
QUAD BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT BACK HINGE COVERS . . 23-101
QUAD BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT CUSHION COVER......23-100
QUAD BUCKET SEAT RISER -
INSTALLATION.......................23-98
QUAD BUCKET SEAT RISER - REMOVAL . . 23-98
QUAD BUCKET SEAT SIDE SHIELD - NO
CUPHOLDER - INSTALLATION...........23-97
QUAD BUCKET SEAT SIDE SHIELD - NO
CUPHOLDER - REMOVAL..............23-97
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - FLAP AND SPRING
ASSEMBLY - INSTALLATION
...........23-107
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - FLAP AND SPRING
ASSEMBLY - REMOVAL
...............23-107
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - INSTALLATION
...........23-96
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - REMOVAL
..............23-96
QUAD CHILD SEAT - INSTALLATION
......23-89
26 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
RECOVERY CONTAINER - DESCRIPTION,
COOLANT............................7-19
RECOVERY CONTAINER - INSTALLATION,
COOLANT............................7-20
RECOVERY CONTAINER - OPERATION,
COOLANT............................7-19
RECOVERY CONTAINER - REMOVAL,
COOLANT............................7-20
RECOVERY SYSTEM - DIAGNOSIS AND
TESTING, COOLANT...................7-20
REFACING VALVES AND VALVE SEATS -
STANDARD PROCEDURE..........9-104,9s-21
REFERENCES - DESCRIPTION, TORQUE . . Intro.-8
REFRIGERANT - DESCRIPTION..........24-92
REFRIGERANT - OPERATION............24-92
REFRIGERANT LINE - DESCRIPTION......24-65
REFRIGERANT LINES - INSTALLATION,
UNDERBODY.......................24-111
REFRIGERANT LINES - OPERATION......24-65
REFRIGERANT LINES - REMOVAL,
UNDERBODY.......................24-110
REFRIGERANT OIL - DESCRIPTION......24-92
REFRIGERANT OIL - OPERATION........24-92
REFRIGERANT OIL LEVEL - STANDARD
PROCEDURE........................24-93
REFRIGERANT RECOVERY - STANDARD
PROCEDURE........................24-71
REFRIGERANT SYSTEM CHARGE -
STANDARD PROCEDURE...............24-72
REFRIGERANT SYSTEM EVACUATE -
STANDARD PROCEDURE...............24-72
REFRIGERANT SYSTEM LEAKS -
DIAGNOSIS AND TESTING.............24-66
REFRIGERANT SYSTEM SERVICE
EQUIPMENT - STANDARD PROCEDURE . . . 24-70
REGULATOR - DESCRIPTION, VOLTAGE . . . 8F-27,
8F-29
REGULATOR - INSTALLATION, FUEL
PRESSURE..........................14-7
REGULATOR - MANUAL - INSTALLATION,
WINDOW...........................23-23
REGULATOR - MANUAL - REMOVAL,
WINDOW...........................23-22
REGULATOR - OPERATION, FUEL
PRESSURE..........................14-7
REGULATOR - OPERATION, VOLTAGE....8F-27,
8F-29
REGULATOR - POWER - INSTALLATION,
WINDOW...........................23-22
REGULATOR - POWER - REMOVAL,
WINDOW...........................23-22
REGULATOR - REMOVAL, FUEL
PRESSURE..........................14-7
REINFORCEMENT - INSTALLATION,
FRONT BUMPER......................13-2
REINFORCEMENT - INSTALLATION,
GRILLE OPENING....................23-54
REINFORCEMENT - INSTALLATION, REAR
BUMPER............................13-3
REINFORCEMENT - REMOVAL, FRONT
BUMPER............................13-2
REINFORCEMENT - REMOVAL, GRILLE
OPENING...........................23-54
REINFORCEMENT - REMOVAL, REAR
BUMPER............................13-3
RELAY - DESCRIPTION, A/C
COMPRESSOR CLUTCH
...............24-19
RELAY - DESCRIPTION, AUTO SHUT
DOWN
..............................8I-3
RELAY - DESCRIPTION, BLOWER
MOTOR
.......................24-24,24-37
RELAY - DESCRIPTION, FUEL PUMP
.....14-28
RELAY - DESCRIPTION, RADIATOR FAN
....7-30
RELAY - DESCRIPTION, REAR WINDOW
DEFOGGER
..........................8G-3
RELAY - DESCRIPTION, TRANSMISSION
CONTROL
...................21-247,21s-150
RELAY - INSTALLATION, A/C
COMPRESSOR CLUTCH
...............24-20
RELAY - INSTALLATION, BLOWER
MOTOR
.......................24-25,24-38
RELAY - INSTALLATION, RADIATOR FAN
. . . 7-30
RELAY - INSTALLATION, REAR WINDOW
DEFOGGER
..........................8G-3
RELAY - OPERATION, A/C COMPRESSOR
CLUTCH
............................24-19
RELAY - OPERATION, AUTO SHUT DOWN
. . . 8I-3RELAY - OPERATION, BLOWER MOTOR . . 24-24,
24-37
RELAY - OPERATION, FUEL PUMP.......14-28
RELAY - OPERATION, RADIATOR FAN......7-30
RELAY - OPERATION, REAR WINDOW
DEFOGGER..........................8G-3
RELAY - OPERATION, TRANSMISSION
CONTROL...................21-248,21s-150
RELAY - REMOVAL, A/C COMPRESSOR
CLUTCH............................24-20
RELAY - REMOVAL, BLOWER MOTOR....24-25,
24-38
RELAY - REMOVAL, RADIATOR FAN.......7-30
RELAY - REMOVAL, REAR WINDOW
DEFOGGER..........................8G-3
RELEASE - STANDARD PROCEDURE,
PARKING BRAKE AUTOMATIC
ADJUSTER TENSION..............5-58,5s-61
RELEASE CABLE - INSTALLATION, LATCH . 23-62
RELEASE CABLE - REMOVAL, LATCH.....23-61
RELEASE LEVER AND BEARING -
INSTALLATION, CLUTCH.................6-7
RELEASE LEVER AND BEARING -
REMOVAL, CLUTCH.....................6-6
RELEASE PROCEDURE - STANDARD
PROCEDURE, FUEL SYSTEM
PRESSURE..........................14-2
RELIEF VALVE - DESCRIPTION, HIGH
PRESSURE.........................24-73
RELIEF VALVE - INSTALLATION, OIL
PRESSURE.........................9-141
RELIEF VALVE - OPERATION, HIGH
PRESSURE...........................24-73
RELIEF VALVE - REMOVAL, OIL
PRESSURE.........................9-141
REMOTE ENTRY MODULE -
DESCRIPTION, SENTRY KEY.............8Q-3
REMOTE ENTRY MODULE - DIAGNOSIS
AND TESTING, SENTRY KEY.............8Q-5
REMOTE ENTRY MODULE -
INSTALLATION, SENTRY KEY............8Q-6
REMOTE ENTRY MODULE - OPERATION,
SENTRY KEY.........................8Q-4
REMOTE ENTRY MODULE - REMOVAL,
SENTRY KEY.........................8Q-5
REMOTE ENTRY SYSTEM - DIAGNOSIS
AND TESTING, SENTRY KEY.............8Q-3
REMOTE KEYLESS ENTRY MODULE -
DESCRIPTION.......................8N-43
REMOTE KEYLESS ENTRY MODULE -
DIAGNOSIS AND TESTING.............8N-43
REMOTE KEYLESS ENTRY MODULE -
INSTALLATION......................8N-44
REMOTE KEYLESS ENTRY MODULE -
OPERATION.........................8N-43
REMOTE KEYLESS ENTRY MODULE -
REMOVAL..........................8N-44
REMOTE KEYLESS ENTRY
TRANSMITTER PROGRAMMING -
STANDARD PROCEDURE...............8N-5
REMOTE SWITCH - DIAGNOSIS AND
TESTING...........................8N-49
REMOTE SWITCH - INSTALLATION......8N-49
REMOTE SWITCH - REMOVAL..........8N-49
REMOTE SWITCHES - DESCRIPTION.....8A-12
REMOTE SWITCHES - DIAGNOSIS AND
TESTING...........................8A-12
REMOTE SWITCHES - INSTALLATION.....8A-14
REMOTE SWITCHES - OPERATION.......8A-12
REMOTE SWITCHES - REMOVAL........8A-13
REPAIR - DESCRIPTION, FRONT CRADLE
CROSSMEMBER THREAD...............13-9
REPAIR - DESCRIPTION, THREADED
HOLE.............................Intro.-5
REPAIR - STANDARD PROCEDURE, GRID
LINE AND TERMINAL..................8G-4
REPAIR - STANDARD PROCEDURE,
INTAKE MANIFOLD VACUUM PORT......9-145
REPAIR - STANDARD PROCEDURE,
MANIFOLD STRIPPED THREAD
..........9-145
REPAIR - STANDARD PROCEDURE,
PLASTIC BODY PANEL
.................23-3
REPAIR OF DAMAGED OR WORN
THREADS - STANDARD PROCEDURE
. . 9-10,9-86
REPAIRING - STANDARD PROCEDURE,
TIRE LEAK
.....................22-17,22s-9
REQUIREMENTS - DESCRIPTION,
ENGINE COOLING SYSTEM
..............24-1REQUIREMENTS - DESCRIPTION, FUEL.....0-4
REQUIREMENTS - DIESEL ENGINE -
DESCRIPTION, FUEL....................0-6
RESERVOIR - DESCRIPTION, VACUUM....8P-6
RESERVOIR - INSTALLATION, VACUUM....8P-6
RESERVOIR - INSTALLATION, WASHER . . . 8R-13
RESERVOIR - OPERATION, VACUUM......8P-6
RESERVOIR - REMOVAL, VACUUM........8P-6
RESERVOIR - REMOVAL, WASHER......8R-13
RESET - STANDARD PROCEDURE,
PARKING BRAKE AUTOMATIC
ADJUSTER TENSION..............5-59,5s-61
RESISTANCE, SPECIFICATIONS - SPARK
PLUG CABLE.........................8I-2
RESISTANCE TEST - DIAGNOSIS AND
TESTING, FEED CIRCUIT..........8F-32,8F-34
RESISTOR - DESCRIPTION, BLOWER
MOTOR............................24-38
RESISTOR - INSTALLATION, BLOWER
MOTOR............................24-39
RESISTOR - OPERATION, BLOWER
MOTOR............................24-38
RESISTOR - REMOVAL, BLOWER
MOTOR............................24-39
RESISTOR BLOCK - DESCRIPTION,
BLOWER MOTOR....................24-26
RESISTOR BLOCK - DIAGNOSIS AND
TESTING, BLOWER MOTOR............24-26
RESISTOR BLOCK - DIAGNOSIS AND
TESTING, REAR BLOWER MOTOR.......24-38
RESISTOR BLOCK - INSTALLATION,
BLOWER MOTOR......................24-27
RESISTOR BLOCK - OPERATION,
BLOWER MOTOR....................24-26
RESISTOR BLOCK - REMOVAL, BLOWER
MOTOR............................24-26
RESONATOR - INSTALLATION............11-9
RESONATOR - REMOVAL...............11-9
RESTRAINT ANCHOR - DESCRIPTION,
CHILD..............................8O-4
RESTRAINT ANCHOR - OPERATION,
CHILD..............................8O-4
RESTRAINT CONTROLLER -
DESCRIPTION, OCCUPANT..............8O-8
RESTRAINT CONTROLLER -
INSTALLATION, OCCUPANT.............8O-8
RESTRAINT CONTROLLER - OPERATION,
OCCUPANT..........................8O-8
RESTRAINT CONTROLLER - REMOVAL,
OCCUPANT..........................8O-8
RESTRAINTS - DESCRIPTION............8O-2
RESTRAINTS - OPERATION.............8O-2
RESTRAINTS - WARNING...............8O-2
RESTRICTION CHECK - DIAGNOSIS AND
TESTING, EXHAUST SYSTEM............11-2
RETAINER - INSTALLATION,
CRANKSHAFT REAR OIL SEAL..........9-129
RETAINER - INSTALLATION, PLASTIC
GROCERY BAG
.....................23-105
RETAINER - REMOVAL, CRANKSHAFT
REAR OIL SEAL
......................9-129
RETAINER - REMOVAL, PLASTIC
GROCERY BAG
.....................23-104
RETRACTOR - FIRST ROW - OUTBOARD
- INSTALLATION, SEAT BELT
...........8O-14
RETRACTOR - FIRST ROW - OUTBOARD
- REMOVAL, SEAT BELT
...............8O-14
RETRACTOR - OUTBOARD - FRONT -
INSTALLATION, SEAT BELT
.............8O-14
RETRACTOR - OUTBOARD - FRONT -
REMOVAL, SEAT BELT
................8O-14
RETRACTOR - SECOND ROW - LEFT
OUTBOARD - INSTALLATION, SEAT
BELT
..............................8O-17
RETRACTOR - SECOND ROW - LEFT
OUTBOARD - REMOVAL, SEAT BELT
.....8O-17
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD - INSTALLATION, SEAT
BELT
..............................8O-15
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD - REMOVAL, SEAT BELT
.....8O-15
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC - LWB -
INSTALLATION, SEAT BELT
.............8O-16
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC - LWB -
REMOVAL, SEAT BELT
................8O-16
28 INDEXRS
Description Group-Page Description Group-Page Description Group-Page