2004 CHRYSLER VOYAGER cooling

[x] Cancel search: cooling

Page 2485 of 2585

CHRYSLER VOYAGER 2004  Service Manual (22) Install plugs in, or tape over the opened liquid
line fittings.
(23) Lower the vehicle.
(24) Remove the front liquid line rear section from
the engine compartment.
INSTALLATION
FRONT SECTION
(1)

Page 2488 of 2585

CHRYSLER VOYAGER 2004  Service Manual STANDARD PROCEDURE - REFRIGERANT OIL
LEVEL
WARNING: REFER TO THE APPLICABLE WARN-
INGS AND CAUTIONS FOR THIS SYSTEM BEFORE
PERFORMING THE FOLLOWING OPERATION (Refer
to 24 - HEATING & AIR CONDITIONING/

Page 2494 of 2585

CHRYSLER VOYAGER 2004  Service Manual (8) Remove the nut that secures the evaporator
line extension seal plate to the expansion valve stud.
(9) Remove the evaporator line extension seal
plate from the expansion valve stud.
(10) Remove the

Page 2496 of 2585

CHRYSLER VOYAGER 2004  Service Manual (4) Install the two screws that secure the rear A/C
expansion valve to the evaporator tube sealing plate.
Tighten the screws to 11 N´m (97 in. lbs.).
(5) Install the rear evaporator line extension on

Page 2497 of 2585

CHRYSLER VOYAGER 2004  Service Manual (7) Refill the engine cooling system (Refer to 7 -
COOLING - STANDARD PROCEDURE - COOLING
SYSTEM REFILL).
THERMAL CYCLING
If the rear heater core was emptied and was not
pre-filled, it will be necessa

Page 2498 of 2585

CHRYSLER VOYAGER 2004  Service Manual (9) Use absorbent toweling to clean up any engine
coolant spills from the preceding operation.
(10) Release the four latch tabs that secure the
heater core into the rear HVAC housing.
(11) Carefully p

Page 2499 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
(1) Install the front underbody heater inlet and
return hoses by carefully twisting the hoses back and
forth on the underbody tubes, while gently pushing
them onto the end of the tubes.
C

Page 2504 of 2585

CHRYSLER VOYAGER 2004  Service Manual REMOVAL
REMOVAL - UNDERBODY HEATER TUBES
WARNING: REFER TO THE APPLICABLE WARN-
INGS AND CAUTIONS FOR THIS SYSTEM BEFORE
PERFORMING THE FOLLOWING OPERATION (Refer
to 24 - HEATING & AIR CONDITIONING/PL