2003 SSANGYONG MUSSO ECU

[x] Cancel search: ECU

Page 219 of 1574

SSANGYONG MUSSO 2003  Service Manual M161 ENGINE MECHANICAL  1B2-67
Tools Required 
000 589 01 10 00 Box Wrench Insert104 589 01 01 00Spanner
Removal & Installation Procedure 
1. Turn the crankshaft and position the no.1 cylinder piston

Page 226 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B2-74  M161 ENGINE MECHANICAL8. Install the lever pusher (11) and the thrust piece (8) to the slide (9).
13. Remove the valve cotter (2) using either the pincette (13) or magnetic finger. Lever  Push

Page 511 of 1574

SSANGYONG MUSSO 2003  Service Manual  M162 ENGINE ELECTRICAL  1E1-11
Circuit Diagram
Inspection & Maintenance Procedure (for MSE) 
1. While the ignition switch is in OFF position, remove thewiring connectors (1 and 15) from ignition co

Page 523 of 1574

SSANGYONG MUSSO 2003  Service Manual  M161 ENGINE ELECTRICAL  1E2-11
Inspection & Maintenance (for E2.3 MSE) 
1. Measure the primary resistance between the cable terminals1 and 15 after removing the ignition cable wiring connector 
(1 an

Page 533 of 1574

SSANGYONG MUSSO 2003  Service Manual SECTION 1F1
M162  ENGINE  CONTROLS
TABLE OF CONTENTS
CAUTION: Disconnect the negative battery cable before removing or installing any electrical unit or when a tool or equipment could easily come in c

Page 535 of 1574

SSANGYONG MUSSO 2003  Service Manual M162 ENGINE CONTROLS  1F1-3
SPECIAL TOOLS
SPECIAL TOOLS TABLE
129 589 00 21 00 Test Box
119 589 04 63 00Pressure Hose
106 589 00 21 00Pressure Tester
210 589 08 63 00 ECU Test Cable 210201Adaptor line

Page 536 of 1574

SSANGYONG MUSSO 2003  Service Manual M162 ENGINE CONTROLS  1F1-5
E32 ECU (MSE)

Page 537 of 1574

SSANGYONG MUSSO 2003  Service Manual 1F1-4  M162 ENGINE CONTROLS
E32 ECU (HFM)
SCHEMATIC AND ROUTING DIAGRAMS
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 112 next >