TIMING CHAIN
EM-51
[QR20DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
9. Install Intake valve timing control cover with the following procedure.
a. Install Intake valve timing control solenoid valves to Intake valve timing control cover.
b. Install Oil rings to the intake camshaft sprocket insertion points on Intake valve timing control backside
cover.
c. Install O-ring to front cover.
d. Apply liquid gasket to the positions in the figure.
e. Tighten mounting bolts in the numerical order shown in the fig-
ure.
10. Insert crankshaft pulley by aligning with crankshaft key.
lTap its center with a plastic hammer to insert.
lDo not tap belt hook.
11. Tighten crankshaft pulley mounting bolts.
lSecure crankshaft pulley with a pulley holder, and tighten the bolts.
lPerform angle tightening with the following procedure.
a. Apply new engine oil to threads and seat surfaces of mounting bolts.
b. Tighten to 37.3 to 47.1 N·m (3.8 to 4.8 kg-m, 28 to 34 ft-lb).
c. put a paint mark on front cover, mating with any one of six easy
to recognize stamp marks on bolt flange.
d. Turn another 60°to 66°[Target: 60°].
lCheck vertical mounting angle with movement of one stamp
mark.
12. Install remaining parts in reverse order of removal.
KBIA0084E
KBIA0085E
PBIC0258E