2002 CHRYSLER CARAVAN timing belt

[x] Cancel search: timing belt

Page 1396 of 2399

CHRYSLER CARAVAN 2002  Service Manual INTERNAL VACUUM PUMP
DESCRIPTION
The diesel engine uses a internal vacuum pump.
This vacuum pump is mounted in the front of the
engine block under the engine front cover (Fig. 45).
The vacuum pump is

Page 1402 of 2399

CHRYSLER CARAVAN 2002  Service Manual CRANKSHAFT OIL SEAL -
FRONT
REMOVAL
(1) Disconnect negative battery cable.
(2) Remove air cleaner housing.
(3) Support engine and remove right engine mount
(Refer to 9 - ENGINE/ENGINE MOUNTING/RIGHT
M

Page 1403 of 2399

CHRYSLER CARAVAN 2002  Service Manual (4) Using hammer, install new seal into front
engine cover (Fig. 61).
(5) Install front engine cover (Refer to 9 -
ENGINE/ENGINE BLOCK/ENGINE COVER -
INSTALLATION).
(6) Install crankshaft hub and reta

Page 1404 of 2399

CHRYSLER CARAVAN 2002  Service Manual ENGINE COVER - FRONT
DESCRIPTION
The front engine cover on this engine is a stamped
steel cover which covers the oil pump and vacuum
pump.
REMOVAL
(1) Disconnect negative battery cable.
(2) Remove air

Page 1408 of 2399

CHRYSLER CARAVAN 2002  Service Manual OIL PUMP
REMOVAL
REMOVAL
(1) Disconnect negative battery cable.
(2) Remove power steering belt (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
REMOVAL).
(3) Remove accessory drive belt (Refer to 7

Page 1409 of 2399

CHRYSLER CARAVAN 2002  Service Manual (3) Install oil pump retaining bolts (Fig. 71).
Torque bolts to 10.8N´m.
(4) Install crankshaft sprocket (Fig. 71). Torque
bolts to 10.8N´m.
(5) Install front engine cover (Refer to 9 -
ENGINE/ENGIN

Page 1415 of 2399

CHRYSLER CARAVAN 2002  Service Manual (9) Remove plug in cylinder head cover/intake
manifold and insert VM.1052 to lock intake camshaft
in position (Fig. 87).
(10) At this point the timing belt can be removed
for service.
(11) After engin

Page 1417 of 2399

CHRYSLER CARAVAN 2002  Service Manual (3) Install balance shaft assembly and retaining
bolts (Fig. 89). Torque bolts to 32.4N´m.
(4) Install oil pan (Refer to 9 - ENGINE/LUBRI-
CATION/OIL PAN - INSTALLATION).
(5) Refill engine oil to pro