2001 TOYOTA SEQUOIA O2 sensor

[x] Cancel search: O2 sensor

Page 626 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual A23557
ECM A42
Air Pressure Sensor
VC
AIP
E2
E8 E8 E8
2832 23
VC
AIP
E2EB4
EB4
EB4G±B G±B
B±Y
B±Y
G±W
G±W6 5 15 V
B17412
E8
E2AIP VC
B17439
Wire Harness Side:
Pressure Sensor Connector
A42
E2
AI

Page 627 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17434
Pressure Gauge
Pressure Sensor
± DIAGNOSTICSENGINE
DI±425
619 Author: Date:
2005 SEQUOIA   (RM1146U)
2 Inspect pressure sensor.
PREPARATION:
(a) Remove the intake manifold (see page EM±36)

Page 628 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual DI±426
± DIAGNOSTICSENGINE
620 Author: Date:
2005 SEQUOIA   (RM1146U)
DTC P2444 Secondary Air Injection System Pump Stuck
ON Bank 1
DTC P2445 Secondary Air Injection System Pump Stuck
OFF Bank 1
C

Page 629 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual ± DIAGNOSTICSENGINE
DI±427
621 Author: Date:
2005 SEQUOIA   (RM1146U)
MONITOR STRATEGY
P2444Air pump is stuck ON
RltdDTCAir pump is stuck OFFRelated DTCsP2445Air flow volume is insufficientP2445
A

Page 630 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual DI±428
± DIAGNOSTICSENGINE
622 Author: Date:
2005 SEQUOIA   (RM1146U)
P2445: Air pressure sensor is stuck
ItSpecificationItemMinimumMaximum
The monitor will run whenever this DTC is
not presentSee

Page 634 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17435Vacuum Hose
DI±432
± DIAGNOSTICSENGINE
626 Author: Date:
2005 SEQUOIA   (RM1146U)
3 Check whether DTC output recurs.
PREPARATION:
(a) Start the engine and warm it up.
(b) Turn the ignition s

Page 635 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17434
Pressure GaugePressure Sensor
B17436
± DIAGNOSTICSENGINE
DI±433
627 Author: Date:
2005 SEQUOIA   (RM1146U)
5 Inspect ECM (air voltage).
PREPARATION:
(a) Remove the intake manifold (see page

Page 641 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual A23475
Pressure GaugePressure Sensor
± DIAGNOSTICSENGINE
DI±439
633 Author: Date:
2005 SEQUOIA   (RM1146U)
12 Check air pump operation.
PREPARATION:
(a) Connect  the pressure gauge to the air swit