2001 NISSAN ALMERA check engine

[x] Cancel search: check engine

Page 734 of 2898

NISSAN ALMERA 2001  Service Manual Alphabetical & P No. Index for DTCNJEC0001Check if the vehicle is a model with the Euro-OBD (E-OBD) system or not by referring to the ªType approval
numberº on the identification plate.
Refer to GI-

Page 742 of 2898

NISSAN ALMERA 2001  Service Manual MEF040D
+Handle mass air flow sensor carefully to avoid damage.
+Do not disassemble mass air flow sensor.
+Do not clean mass air flow sensor with any type of deter-
gent.
+Do not disassemble IAC valve

Page 761 of 2898

NISSAN ALMERA 2001  Service Manual EVAP canister purge volume control solenoid valve is controlled by ECM. When the engine operates, the flow
rate of vapor controlled by EVAP canister purge volume control solenoid valve is proportional

Page 763 of 2898

NISSAN ALMERA 2001  Service Manual Positive Crankcase Ventilation
DESCRIPTIONNJEC0022
SEF921W
This system returns blow-by gas to the intake collector.
The positive crankcase ventilation (PCV) valve is provided to conduct crankcase blow

Page 764 of 2898

NISSAN ALMERA 2001  Service Manual SEF094Y
SEF214Y
Fuel Pressure ReleaseNJEC0024Before disconnecting fuel line, release fuel pressure from fuel
line to eliminate danger.
WITH CONSULT-IINJEC0024S011. Start engine.
2. Perform ªFUEL PRES

Page 765 of 2898

NISSAN ALMERA 2001  Service Manual If results are unsatisfactory, perform Fuel Pressure Regulator
Check, EC-41.
SEF718B
Fuel Pressure Regulator CheckNJEC00261. Stop engine and disconnect fuel pressure regulator vacuum
hose from intake

Page 768 of 2898

NISSAN ALMERA 2001  Service Manual SEF933W
SEF284G
+Method B
a) Remove No. 1 ignition coil.
b) Connect No. 1 ignition coil and No. 1 spark plug with suitable
high-tension wire as shown, and attach timing light clamp to
this wire.
c) Ch

Page 769 of 2898

NISSAN ALMERA 2001  Service Manual h)Fuel pressure
i)Engine compression
j)EGR valve operation
k)Throttle valve
l)EVAP system
+On models equipped with air conditioner, checks should
be carried out while the air conditioner is ªOFFº.
+