ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-19
1. TP sensor
2. TP sensor
adjusting holes
3. TP sensor
screw holes4. Turn TP sensor after
fitting and align holes.
1. Throttle stop screw
2. Throttle lever
3. Thickness gauge
THROTTLE POSITION SENSOR (TP SENSOR)
INSPECTION
Check TP sensor referring to step 2 of DTC P0121 Flow Table. If
malfunction is found, replace.
REMOVAL
1) Disconnect battery negative cable at battery.
2) Remove air cleaner assembly referring to Section 6A.
3) Disconnect coupler from TP sensor.
4) Remove TP sensor from throttle body.
INSTALLATION
1) Install TP sensor to throttle body.
Fit TP sensor to throttle body in such way that its adjusting holes
are a little away from TP sensor screw holes as shown in left fig-
ure and turn TP sensor clockwise so that those holes align.
Then hand-tighten TP sensor screws.
2) Connect coupler to TP sensor securely.
3) Install air cleaner assembly referring to Section 6A.
4) Connect battery negative cable battery.
5) Adjust installation angle of TP sensor according to procedure
described in item “ADJUSTMENT”.
ADJUSTMENT
1) Insert 3.5 mm (0.14 in.) thickness gauge between throttle stop
screw and throttle lever.
CAUTION:
As throttle stop screw is factory adjusted precisely, don’t
remove or adjust it.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-27
1) Connect scan tool to DLC with ignition switch OFF, if it is avail-
able.
2) Warm up engine to normal operating temperature.
3) Select “Data List” mode on scan tool to check “IAC duty”.
4) Apply load to engine as described below and check that idle
speed is kept at specified level and “IAC duty” increases as spe-
cified below. At the same time, check that plunger of ISC actua-
tor moves.
Increase of ISC duty
when headlight turns ON : About 3.5%
when A / C is operating : About 10%
5) Stop engine and leave it as it is till it cools off. Then check that
plunger of ISC actuator moves when ignition switch is turned
from OFF to ON once.
If abnormality is found in Steps 4) and 5), check ISC relay, ISC
actuator, ISC electric circuit and closed throttle position switch
signal.
If abnormality is found in Step 4) only, check A/C signal circuit
or power steering pressure switch signal circuit first.
ISC ACTUATOR
NOTE:
As ISC actuator has been preadjusted precisely at factory, it must
not be taken out of throttle body or disassembled.
INSPECTION
1) Disconnect connector from ISC actuator.
2) Check whether ISC actuator coil is open or short.
ISC actuator resistance at 20C (68F): 3 – 50 Ω
NOTE:
Above data should be used as reference value for determin-
ing whether coil is open or short only. ISC actuator resis-
tance may be out of above specified range even when ISC
actuator is normal.
6E1-34 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Tank pipe
2. Purge pipe
3. Air pipe
4. Blow air
1. Tank pressure
control valve
2. Orange side3. Black side
4. To canister
5. From fuel tank
EVAP CANISTER INSPECTION
WARNING:
DO NOT SUCK nozzles on EVAP canister. Fuel vapor inside
EVAP canister is harmful.
1) Disconnect vacuum hoses from EVAP canister and remove
EVAP canister.
2) When air is blown into tank pipe, there should be no restriction
of flow through purge pipe and air pipe.
If operation differs from above description, EVAP canister must
be replaced.
3) Install EVAP canister and connect hoses to canister.
TANK PRESSURE CONTROL VALVE INSPECTION
WARNING:
DO NOT SUCK air through tank pressure control valve.
Fuel vapor inside the valve is harmful.
1) Remove tank pressure control valve.
2) Air should pass through valve smoothly from fuel tank side
(black side of tank pressure control valve) to orange side when
blown hard.
3) From orange side, even when blown softly, air should come out
of black side.
4) If air doesn’t pass though valve in step 2) or hard blow is required
in step 3), replace tank pressure control valve.
5) Install tank pressure control valve.
NOTE:
When connecting tank pressure control valve between
hoses, refer to figure at the left for installing direction.
PCV SYSTEM
NOTE:
Be sure to check that there is no obstruction in PCV valve or
its hoses before adjusting engine idle speed, for obstructed
PCV valve or hose hampers its accurate adjustment.
PCV HOSE INSPECTION
Check hoses for connection, leakage, clog and deterioration.
Replace as necessary.
6E2
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-1
GENERAL DESCRIPTION6E2- 2 . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2- 6. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2- 7. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2- 8. . . . . .
Engine and Emission Control Input /
Output Table 6E2- 9. . . . . . . . . . . . . . . . . . . . . . . .
DIAGNOSISSee Section 6. . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6E2-13 . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment 6E2-13. . . . . . . . . .
Idle Speed/Idle Air Control (IAC)
Duty Inspection 6E2-14. . . . . . . . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2-15. . . . . . . . . . . . . . . . . .
Throttle Body 6E2-15. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve 6E2-17. . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2-18. . . . . . . . . . . . . .
Fuel Pressure Inspection 6E2-18. . . . . . . . . . . . . .
Fuel Pump 6E2-21. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator 6E2-22. . . . . . . . . . . . . . .
Fuel Injector 6E2-23. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2-27. . . . . .
ECM / PCM 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . . .
MAP Sensor 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor 6E2-28. . . . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor 6E2-29. . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor 6E2-30. . . . . . . . . . . . . . . . . . . . . . . . . Heated Oxygen Sensor -1 and -2 6E2-31. . . . . . .
Camshaft Position Sensor 6E2-32. . . . . . . . . . . . .
Crankshaft Position Sensor 6E2-32. . . . . . . . . . . .
Vehicle Speed Sensor 6E2-33. . . . . . . . . . . . . . . . .
Fuel Level Sensor (gauge) 6E2-33. . . . . . . . . . . . .
Main Relay, Fuel Pump Relay and
Radiator Fan Control Relay 6E2-33. . . . . . . . . . .
Fuel Cut Operation (Inspection) 6E2-34. . . . . . . .
Radiator Fan Control System 6E2-34. . . . . . . . . .
System Inspection 6E2-34. . . . . . . . . . . . . . . . . .
Radiator Fan 6E2-34. . . . . . . . . . . . . . . . . . . . . . .
EMISSION CONTROL SYSTEM 6E2-35. . . . . . . . .
EGR System 6E2-35. . . . . . . . . . . . . . . . . . . . . . . . .
EVAP Control System 6E2-36. . . . . . . . . . . . . . . . .
EVAP Canister Purge Inspection 6E2-36. . . . . .
Vacuum Passage Inspection 6E2-37. . . . . . . . .
Vacuum Hose Inspection 6E2-37. . . . . . . . . . . .
EVAP Canister Purge Valve
Inspection 6E2-37. . . . . . . . . . . . . . . . . . . . . . . .
EVAP Canister Inspection 6E2-38. . . . . . . . . . .
PCV System 6E2-38. . . . . . . . . . . . . . . . . . . . . . . . .
PCV Hose Inspection 6E2-38. . . . . . . . . . . . . . .
PCV Valve Inspection 6E2-38. . . . . . . . . . . . . . .
SPECIAL TOOLS6E2-39 . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS6E2-39 . . . . . . . . . . . . . . . . . . . . .
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SFI FOR G13)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
1. Accelerator cable
3. Lock nut
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-13
ON-VEHICLE SERVICE
ACCELERATOR CABLE ADJUSTMENT
1) With throttle valve closed, check accelerator pedal play which
should be within following specification.
Pedal play “a”: 2 – 7 mm (0.08 – 0.27 in.)
If measured value is out of specification, adjust it to specification
with cable adjusting nut (2).
2) With accelerator pedal depressed fully (1), check clearance be-
tween throttle lever (2) and lever stopper (3) (throttle body)
which should be within following specification.
Clearance “b” : 0.5 – 2.0 mm (0.02 – 0.07 in.)
(With pedal
depressed fully)
If measured value is out of specification, adjust it to specification
with cable adjusting nut.
6E2-14 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
IDLE SPEED / IDLE AIR CONTROL (IAC) DUTY
INSPECTION
Before idle speed / IAC duty check, make sure of the following.
Lead wires and hoses of Electronic Fuel Injection and engine
emission control systems are connected securely.
Accelerator cable has some play, that is, it is not tight.
Valve lash is checked and adjusted according to maintenance
schedule.
Ignition timing is within specification.
All accessories (wipers, heater, lights, A / C, etc.) are out of ser-
vice.
Air cleaner has been properly installed and is in good condition.
No abnormal air inhaling from air intake system.
After above items are all confirmed, check idle speed and IAC duty
as follows.
NOTE:
Before starting engine, place transmission gear shift lever in
“Neutral” (shift selector lever to “P” range for A / T vehicle),
and set parking brake and block drive wheels.
1) Connect SUZUKI scan tool (1) to DLC with ignition switch OFF,
if it is available.
2) Warm up engine to normal operating temperature.
3) Check engine idle speed and “IAC duty” as follow:
Select “Data List” mode on scan tool to check “IAC duty” and en-
gine speed.
Special Tool
(A): 09931-76011 (SUZUKI scan tool)
(B): Mass storage cartridge
(C): 09931-76030 (16 / 14 pin DLC cable)
If duty and/or idle speed is out of specifications, inspect idle air
control system referring to Diagnostic Flow Table B-4 IDLE AIR
CONTROL SYSTEM CHECK in Section 6.
ENGINE IDLE SPEED AND IAC DUTY
A/C OFFA/C ON
M / T vehicle750±50 r / min (rpm)875±50 r/minA / T vehicle
at P/N range750 ±50 r/min (rpm)
8 – 25 or *8 – 35%
875 ±50 r/min
(rpm)
NOTE:
Duty values with (*) are applicable to vehicle used at high
altitude (higher than 2,000 m or 6,560 ft).
4) Check that 875 ± 50 r / min. idle speed is obtained with lighting
switch ON and heater blower switch in 2 – 4 position.
If not, check “Electric load (+)” circuit and “Heater blower switch
signal” circuit referring to “ELECTRONIC CONTROL SYSTEM”
in this section and idle air control system.
5) Check that specified engine idle speed is obtained with A / C ON
if vehicle is equipped with A / C.
If not, check A / C ON signal circuit.
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-15
CAUTION:
Do not disassemble IAC
valve. Disassembly spoils
its original performanceCAUTION:
Do not remove or adjust
throttle stop screw as it is
factory adjusted precisely
1. Throttle body
2. Throttle stop screw
3. TP sensor
4. O-ring
5. Idle air control valve
6. IAC valve screws : Tightening torque
: Do not reuse
AIR INTAKE SYSTEM
THROTTLE BODY
On-Vehicle Inspection
Check that throttle valve lever (1) moves smoothly.
Removal
1) Disconnect negative cable at battery.
2) Drain cooling system.
3) Disconnect accelerator cable (1) from throttle body.
4) Disconnect air cleaner outlet hose (1) from throttle body.
21
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-17
2) Connect engine coolant hoses (1).
3) Install throttle body (4) to intake manifold.
4) Connect coupler to TP sensor (2) and IAC valve (3) securely.
5) Install air cleaner outlet hose (1) and pipe.
6) Connect accelerator cable and adjust cable play to specifica-
tion.
7) Refill cooling system.
8) Connect negative cable at battery.
IDLE AIR CONTROL VALVE (IAC VALVE)
Removal
1) Remove throttle body from intake manifold referring to “Throttle
Body Removal” section.
2) Remove IAC valve from throttle body.
Inspection
1) Connect each connector to IAC valve (1), TP sensor and IAT
sensor.
2) Check that rotary valve (2) of lAC valve opens and closes once
and then stops in about 60 ms as soon as ignition switch is
turned ON.
NOTE:
This check should be performed by two people, one per-
son turns on ignition switch while the other checks valve
operation.
As valve operation is momentary, it may be overlooked.
To prevent this, perform this operation check 3 times or
more continuously.
If rotary valve of lAC valve does not operate at all, check
wire harness for open and short. If wire harness is in good
condition, replace lAC valve and recheck.