1999 LAND ROVER DISCOVERY belt

[x] Cancel search: belt

Page 918 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
REPAIRS 75-15
Seat belt - rear - side  
$% 76.73.23 
Remove
1.Remove D post trim casing. 
 
 +  INTERIOR TRIM COMPONENTS, 
REPAIRS, Trim casing - D post.
2.Remove loadspace side

Page 919 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
75-16 REPAIRS
Mounting - seat belt - B post   
$% 76.73.26 
Remove
1.Release front door aperture seal from  B post. 
2.Release rear door aperture seal from  B post. 
3.Release

Page 920 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
REPAIRS 75-17
Seat belts - third row
$% 76.73.28/21 
Remove
1.Remove D post trim casing.  
 
 +  INTERIOR TRIM COMPONENTS, 
REPAIRS, Trim casing - D post.
2.Remove seat belt uppe

Page 921 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
75-18 REPAIRS
Pre-tensioner - front seat belt  
$% 76.73.30  
WARNING: It is imperative that before any work 
is undertaken on the SRS system the appropriate 
information is read tho

Page 922 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
REPAIRS 75-19
Pre-tensioner - seat belt - front - 
deployment - in vehicle
$% 76.73.77 
These guidelines are written to aid authorised 
personnel to carry out the safe disposal of ai

Page 923 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
75-20 REPAIRS
Pre-tensioner - seat belt - front - 
deployment - off vehicle
$% 76.73.78 
These guidelines are written to aid authorised 
personnel to carry out the safe disposal of a

Page 924 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
REPAIRS 75-21
4.Connect deployment tool fly lead LRT-86-003/
04 to seat belt pre-tensioner.
5.Connect deployment tool LRT-86-003 to 
deployment tool fly lead LRT-86-003/04.
6.Connect

Page 925 of 1529

LAND ROVER DISCOVERY 1999  Workshop Manual RESTRAINT SYSTEMS
75-22 REPAIRS
Airbag module - drivers 
$% 76.74.01  
WARNING: It is imperative that before any work 
is undertaken on the SRS system the appropriate 
information is read thoroughly.