Page 742 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel feed pipe. Locate the
fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the B-Bank injectors.
4. Fit the B-Bank intercooler. Refer to Operation 18.50.19.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation (SC) 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 744 of 2490

Engine - Intake Manifold Gasket RH
In-vehicle Repair
1. Open the engine compartment and fit paintwork protection
sheets.
2. Disconnect the batt ery ground cable.
Remove the battery cover.
3. WARNING: BEFORE PROCEEDING, IT IS ESSENTIAL THAT THE WARNINGS GIVEN IN SECTION 100-00 (UNDER THE
HEADING 'SAFETY PRECAUTIONS') ARE READ AND
UNDERSTOOD.
Depressurise the fuel system.
Ensure that the ignition is switched off and remove the
valve cap from the fuel cross-over pipe. Place a cloth
under the valve to collect any spillage.
Place a closed container, su itable for collecting fuel,
adjacent to the vehicle. Remove the lid.
4. Connect the fuel injection pres sure test equipment 310 - 058
(or other suitable type). Insert the drain / bleed tube into the
fuel container. Follow the ma nufacturer's instructions and
depressurise the fuel system.
5. Store the drained fuel safely and ensure that the lid is closed
securely. Remove the equipmen t and discard the cloth from
beneath the valve. refit the valve cap.
6. Drain the radiator coolant. Refer to Operation 26.10.01.
7. Disconnect the breather pipe fro m the A-Bank camshaft cover.
1. Disconnect the breather pipe from the stub pipe.
2. Remove and discard the O-ring seal from the breather
pipe.
Page 746 of 2490

Installation
19.70.28.
15. Remove the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
16. Remove the coolant output pipe. Refer to Operation (SC)
26.31.08.
17. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
18. Remove the supercharger as sembly. Refer to operation
18.50.15.
19. Remove the A-Bank intercooler. Refer to Operation 18.50.18.
20. Disconnect the fuel injector harness.
1. Disconnect the multi-plugs from the A-Bank injectors.
2. Loosen, do not remove, the nuts which secure the
harness to the camshaft cover.
3. Reposition the harness for access.
21. Remove the fuel rail.
1. Remove the three bolts whic h secure the fuel rail to
the intercooler adaptor.
2. Remove the fuel rail from the adaptor; still connected
to the fuel crossover pipe and fuel return pipe.
22. Remove the intercoole r adaptor assembly.
1. Remove and discard the seals from the fuel rail.
2. Remove the five bolts which secure the adaptor
assembly to the cylinder head.
3. Remove the adaptor assembly from the cylinder head.
Remove the gasket; adaptor assembly to cylinder head.
23. Clean and inspect all relevant mating faces.
1. Fit the intercooler adaptor assembly.
1. Fit a new gasket; adaptor assembly to cylinder head.
2. Align and fit the adaptor assembly to the cylinder head.
Page 747 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 860 of 2490
Installation
9. Clean all relevant parts and mating faces.
1. Fit new seals to the cam cover.
1. Fit the new outer seal.
2. Fit the two new spark plug aperture seals.
2. Fit the securing screws to the cam covers.
1. Fit a new sealing ring to each screw assembly.
2. Fit the screws to the cam covers. Each screw is retained by the cam cover gasket.
3. Apply RTV sealant WSS-M4G320-A3 to two places on the joint
between the front of the cam cover and the cylinder head.
The application of sealant must be 3mm diameter by
12mm long. Fit the cam cover immediately after applying
the sealant.
The cover should be fitted di rectly to the head without
smearing the sealant or the seals.
4. Refit the cam cover.
Position the cam cover onto the cylinder head without
smearing the sealant and start the threads of each
Page 864 of 2490
2. Fit the two new spark plug aperture seals.
2. Fit the securing screws to the cam covers.
1. Fit a new sealing ring to each screw assembly.
2. Fit the screws to the cam covers. Each screw is retained by the cam cover gasket.
3. Apply RTV sealant WSS-M4G320-A3 to two places on the joint
between the front of the cam cover and the cylinder head.
The application of sealant must be 3mm diameter by
12mm long. Fit the cam cover immediately after applying
the sealant.
The cover should be fitted di rectly to the head without
smearing the sealant or the seals.
4. Refit the cam cover.
Position the cam cover onto the cylinder head without
smearing the sealant and start the threads of each
securing screw.
5. Tighten the securing screws to 9 - 11 Nm. Tighten in the
sequence indicated.
Page 869 of 2490
2. Fit the two new spark plug aperture seals.
2. Fit the securing screws to the cam covers.
1. Fit a new sealing ring to each screw assembly.
2. Fit the screws to the cam covers. Each screw is retained by the cam cover gasket.
3. Apply sealant to two places on the joint between the front of
the cam cover and the cylinder head.
The application of sealant must be 3mm diameter by
12mm long. Fit the cam cover immediately after applying
the sealant.
The cover should be fitted di rectly to the head without
smearing the sealant or the seals.
4. Refit the cam cover.
1. Position the cam cover onto the cylinder head without smearing the sealant and start the threads of each
securing screw.
5. Tighten the securing screws to 9-11 Nm. Tighten in the
sequence indicated.
Page 873 of 2490
Installation
8. Clean all relevant parts and mating faces.
1. Fit the new main seals to the cam cover.
1. Fit the new outer seal.
2. Fit the two new spark plug aperture seals.
2. Fit the securing screws to the cam covers.
1. Fit a new sealing ring to each screw assembly.
2. Fit the screws to the cam covers. Each screw is retained by the cam cover gasket.
3. Apply sealant to two places on the joint between the front of
the cam cover and the cylinder head.
The application of sealant must be 3mm diameter by
12mm long. Fit the cam cover immediately after applying
the sealant.
The cover should be fitted di rectly to the head without
smearing the sealant or the seals.
4. Refit the cam cover.
1. Position the cam cover onto the cylinder head without smearing the sealant and start the threads of each