1996 TOYOTA TERCEL sensor

[x] Cancel search: sensor

Page 203 of 1202

TOYOTA TERCEL 1996  Service Repair Manual A15685
- DIAGNOSTICSENGINE
DI-29
1996 TERCEL   (RM440U)
INSPECTION PROCEDURE
HINT:
If DTC P0105, P0106, P0110, P0115, P0120 are output simultaneously, E2 (sensor ground) may be open.
1 Connect OBD II

Page 204 of 1202

TOYOTA TERCEL 1996  Service Repair Manual A15686
A15687
DI-30
- DIAGNOSTICSENGINE
1996 TERCEL   (RM440U)
3 Check for open in harness or ECM.
PREPARATION:
(a) Remove the lower finish panel.
(b) Connect  terminals THW and E2 of ECM connector to

Page 205 of 1202

TOYOTA TERCEL 1996  Service Repair Manual A15688
- DIAGNOSTICSENGINE
DI-31
1996 TERCEL   (RM440U)
5 Check for short in harness or ECM.
PREPARATION:
(a) Remove the lower finish panel.
(b) Disconnect the E7 connector of ECM.
HINT:
The engine co

Page 206 of 1202

TOYOTA TERCEL 1996  Service Repair Manual DI-32
- DIAGNOSTICSENGINE
1996 TERCEL   (RM440U)
DTC P0116 Engine Coolant Temp. Circuit Range/
Performance Problem
CIRCUIT DESCRIPTION
Refer to Engine Coolant Temp. Circuit Malfunction on page DI-28.

Page 207 of 1202

TOYOTA TERCEL 1996  Service Repair Manual P24296
Throttle Position
Sensor
E2 VTAECM
VC
- DIAGNOSTICSENGINE
DI-33
1996 TERCEL   (RM440U)
DTC P0120 Throttle/Pedal Position Sensor/Switch ºAº
Circuit Malfunction
CIRCUIT DESCRIPTION
The throttle

Page 208 of 1202

TOYOTA TERCEL 1996  Service Repair Manual A15689
FI7052
DI-34
- DIAGNOSTICSENGINE
1996 TERCEL   (RM440U)
WIRING DIAGRAM
INSPECTION PROCEDURE
HINT:
If DTC P0105, P0110, P0120 are output simultaneously, E2 (sensor ground) may be open.
1 Connect

Page 209 of 1202

TOYOTA TERCEL 1996  Service Repair Manual A00369
1 (+) ON
S03529 BE6653A00854
ON
VTA (+) E2  (-)
- DIAGNOSTICSENGINE
DI-35
1996 TERCEL   (RM440U)
2 Check voltage between terminal 1 of wire harness side connector and body
ground.
PREPARATION:

Page 210 of 1202

TOYOTA TERCEL 1996  Service Repair Manual BE6653S03524A03999
ON
VC (+) E2  (-)
DI-36
- DIAGNOSTICSENGINE
1996 TERCEL   (RM440U)
Check and replace ECM (See page IN-26).
5 Check voltage between terminals VC and E2 of ECM connector.
PREPARATION: