1995 JEEP CHEROKEE Coolant

[x] Cancel search: Coolant

Page 1116 of 2198

JEEP CHEROKEE 1995  Service Repair Manual LEAK-DOWN TEST
After cleaning and inspection, test each tappet for
specified leak-down rate tolerance to ensure zero-lash
operation (Fig. 14).
Swing the weighted arm of the hydraulic valve tap-
pet te

Page 1117 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (9) If equipped, disconnect the power steering
pump bracket. Set the pump and bracket aside. DO
NOT disconnect the hoses.
(10) Remove the fuel lines and vacuum advance
hose.
(11) Remove the intake and

Page 1118 of 2198

JEEP CHEROKEE 1995  Service Repair Manual CAUTION: Engine cylinder head bolts should be re-
used only once. Replace the head bolts if they were
used before or if they have a paint dab on the top
of the bolt.
(6) Coat the threads of bolt No.7,

Page 1119 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Use Valve Spring Compressor Tool
MD-998772A and compress each valve spring.
(3) Remove the valve locks, retainers, springs and
valve stem oil seals. Discard the oil seals.
(4) Use an Arkansas smoo

Page 1123 of 2198

JEEP CHEROKEE 1995  Service Repair Manual REMOVAL
(1) Disconnect negative cable from battery.
(2) Remove the fan and shroud.
(3) Remove the serpentine drive belt.
(4) Remove the crankshaft vibration damper.
(5) Remove the timing case cover.
(

Page 1124 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Drain the cooling system. DO NOT waste reus-
able coolant. If the solution is clean, drain it into a
clean container for reuse.
(3) Remove the radiator or radiator and condenser,
if equipped with

Page 1125 of 2198

JEEP CHEROKEE 1995  Service Repair Manual tor in the Component Removal/Installation section of
Group 8D, Ignition Systems.
(14) Install the distributor and ignition wires. Re-
fer to Distributor in the Component Removal/Instal-
lation section

Page 1150 of 2198

JEEP CHEROKEE 1995  Service Repair Manual INSTALLATIONÐYJ VEHICLES
(1)MANUAL TRANSMISSION:
(a) Position the torque arm bracket to the trans-
mission. Install the bolts and tighten to 54 Nzm (40
ft. lbs.) torque.
(b) Position the support cush