
INTAKE AND EXHAUST - Turbocharger (Front)15-19
05FOO2(
SERVICE POINTS OF REMOVALM15LBAE
19. REMOVAL OF OXYGEN SENSORDisconnect the connector of the oxygen sensor, and install
the special tool to the oxygen sensor.
25. DISCONNECTION OF AIR CONDITIONER COMPRES-
SORDisconnect air conditioner compressor with hoses from the
bracket.
NOTEThe removed air conditioner compressor should be fas-
tened (by using rope, etc.) in a position that will not interfere
with the removal/installation of the turbocharger assembly.
INSPECTION
TURBOCHARGER ASSEMBLY CHECKMlSLCADl
lVisually check the turbine wheel and the compressor wheel
for cracking or other damage.
l Check whether the turbine wheel and the compressor
wheel can be easily turned by hand.
l Check for oil leakage from the turbocharger assembly.
lCheck whether or not the waste gate valve remains open. If
any problem is found, replace the part after disassembly.
OIL PIPE AND OIL-RETURN PIPE CHECKCheck the oil pipe and oil-return pipe for clogging, bending, or
other damage.
If there is clogging, clean it.
SERVICE POINTS OF INSTALLATIONMllLDAE
24. INSTALLATION OF TURBOCHARGER ASSEMBLYClean the alignment surfaces shown in the illustration.
Supply clean engine oil through the oil pipe installation hole
of the turbocharger assembly.
CautionWhen cleaning, care must be taken so that a piece of
the gasket does not enter the oil passage hole.
TSB Revision

INTAKE AND EXHAUST - Turbocharger (Rear)15-21
TURBOCHARGER (REAR)
iREMOVAL AND INSTALLATION
/
id
Post-installation ODerationIl Installation of Front Exhaust Pipe(Referto P.15-31.)l Refilling of the Engine Coolant
(Refer to GROUP 00 - Maintenance
l Adjustment of Accelerator Cable1~~~~o~~ GROUP 13 - Engine
lo-13Nm7 - 9 ft.lbs.
6.
7 55-65Nmb
5 40 - 47 ft.lbs.i18Nm’
d13 ft.lbs.
MlSLA-B
0-nng
05FOOO3Removal steps
1. Battery2. Connection of accelerator cable
** 3, pg,t;eye)l * 4.
AirpipeA5. Heat protector F
6. Clutch booster vacuum hose
7. Connection of accelerator cable
(pedal side)
I)+8. Air intake hose AO+9. Air intake hose Cl * I)* 10. Oxygen sensor
11. Heat protector D12. EGR pipe
9Nmv 10 //--!
-7 ft.lbs.45 Nm33 ft.lbs.LIZ-15NmOSFOO419- 11 ft.lbs.
13.Eye boltl * 14. Oil pipe15.EGR valve16. Water pipe A
17. Water pipe B
18.Exhaust fitting
19. Heat protector E
20.Gasket21,. Turbocharger & return pipe assembly
22. Oil return pipe
l * 23. Turbocharger assembly24.Gasket25.Ring26. Exhaust fitting stayTSB Revision

INTAKE AND EXHAUST - Turbocharger (Rear)
0
Comrxessorwheel \u ~i, rOlR0182
I05FOO19
SERVICE POINT OF REMOVALM15LBAF
10. REMOVAL OF OXYGEN SENSOR
Disconnect the connector of the oxygen sensor, and install
’the special tool to the oxygen sensor.
d,
INSPECTION
TURBOCHARGER ASSEMBLY CHECK
M15LCADZ
lVisually check the turbine wheel and the compressor wheel
for cracking or other damage.
l Check whether the turbine wheel and the compressor
wheel can be
easily.turned by hand.
l Check for oil leakage from the turbocharger assembly.
lCheck whether or not the waste gate valve remains open. If
any problem is found, replace the part after disassembly.
OIL PIPE AND OIL-RETURN PIPE CHECKCheck the oil pipe and oil-return pipe for clogging, bending, or
other damage.
If there is clogging, clean it.
SERVICE POINTS OF INSTALLATIONMlBLDAF
23. INSTALLATION OF TURBOCHARGER ASSEMBLYClean the alignment surfaces shown in the illustration.
CautionWhen cleaning, care must be taken so that a piece of
the gasket does not enter the oil passage hole.
14. INSTALLATION OF OIL PIPESupply clean engine oil through the oil pipe installation hole
of the turbocharger assembly.
10. INSTALLATION OF OXYGEN SENSORUse the special tool to install the oxygen sensor.
TSB Revision

INTAKE AND EXHAUST - Turbocharger
INSPECTION
TURBOCHARGER
15-25MllLGAB
(I) Manually open and close the waste gate valve to make sure
it operates freely.
(2)Inspect the oil passage in the cartridge for signs of deposits
or blockage.
(3) Clean the inlet section of the compressor cover with a rag.
Inspect it for signs of contact with the compressor turbine.
If worn, replace it.
L/
O-ring
3EN23C3062
snap ring Chamfered
.
v cartr~d~om,,ir
,jFcover
WI61 NO070
SERVICE POINTS OF REASSEMBLYM15LHAC7. INSTALLATION OF O-RING
Coat the inner surface of a new O-ring with a thin film of
engine oil, and set it in the groove of the cartridge
assembly.
Caution
Be careful not to damage the O-ring while installing itas oil leakage could result.
6. INSTALLATION OF CARTRIDGE ASSEMBLY
(1) Coat the outer circumference of the cartridge assembly
O-ring with a thin film of engine oil.
(2) Install the cartridge assembly on the compressor cover
by aligning the dowel pin.
CautionWhen installing the cartridge assembly on the
compressor cover, be careful not to damage the
compressor wheel blades.5. INSTALLATION OF SNAP RING
Place the cartridge assembly with the compressor cover
faced down and install the snap ring.
Caution
Install the snap ring with the tapered side of its outsidediameter up.
TSB Revision4. INSTALLATION OF TURBINE HOUSING
Install the compressor cover and cartridge assembly on the
turbine housing with the dowel pin in alignment.
Caution
1.Be careful not to damage the blades of the turbine
wheel.2. Be careful to install the turbine housing in the
correct direction.

17-1
EMISSIONCONTROL
.~
CATALYTIC CONVERTER............................:...Inspection
............................................................Removal and Installation
................................
CONTENTSM17.U. -
CRANKCASE EMISSION CONTROL
SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ComponentsLocation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Crankcase Ventilation System Inspection
._..Positive Crankcase Ventilation Valve
. . . . . . . . . . . .
EVAPORATIVE EMISSION CONTROL
SYSTEM................................................................Air Conditioner Switch
....................................Air Flow Sensor, Engine Coolant
Temperature Sensor and Intake Air
Temperature Sensor
........................................Canister
............................................................Components Location
....................................
FuelFiller CapInspection................................OverfillLimiter (Two-way Valve)
....................Purge Control Solenoid Valve
........................Purge Control System Inspection
............................................................Purge Control Valve
........................
PurgePort VacuumCheck................................14
14
14
6
10
10
10
6
10
10
9
7
8
9
9EXHAUST GAS RECIRCULATION
(EGR)
SYSTEM. . . . . ..____._.._........__........_____.........................Air-FuelRatio Control (MPI) System. . . . . . . .
Components Location
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .EGR Control Solenoid Valve
. . . . . . . .EGR Valve
EGR Valve Control Vacuum Check
SPECIFICATIONS................................................General Specifications
....................................Service Specifications
....................................
TROUBLESHOOTING. . . . . . . . . . . . . . . . . ..______...............
VACUUM HOSES................................................Inspection
............................................................Installation
........................................................VacuumHosesRouting
....................................
11
14
11
13
12
13
13
12
2
2
22

17-2EMISSION CONTROL - Specifications / Troubleshooting
SPECIFICATIONS
GENERAL SPECIFICATIONSMl’ICA- -\
Items
Crankcase emission control systemSpecifications
Closed type with positive crankcase ventilationvalve
Evaporative emission control systemCanister storage type
Canister
Charcoal type
Purge control solenoid valve
ON/OFF solenoid valve
Exhaust emission control system
Exhaust gas recirculation system
EGR valveVacuum-activated diaphragm type
EGR temperature sensor
EGR control solenoid valve
Catalytic converter
Monolith type
Location
Under floor
Turbocharger outlet (front bank and rear bank,)
and under floor
SERVICE SPECIFICATIONSMl7CB-.
ItemsSpecifications
Purge control solenoid valve coil resistance
036 - 44 [at 20°C (68”F)I\
EGR temperature sensor resistancekfl60 - 83 [at 50°C (I 22”F)]
11 - 14 [at 100°C (212”F)l
EGR control solenoid valve coil resistance1236 - 44 [at 20°C (68”F)lI
TROUBLESHOOTING
Symptom
Engine will not start
or hard to start
Rough idle or engine
stalls
Probable cause
Vacuum hose disconnected or damaged
The EGR valve is not closed
Malfunction of the purge control solenoid valve
The EGR valve is not closed
Vacuum hose disconnected or damaged
Malfunction of the positive crankcase ventilationvalveRemedy
Repair or replace
Repair or replace
Repair or replace
Repair or replace
Repair or replace
Replace
Malfunction of the purge control systemCheck the system; if there is a
problem, check its component parts
Engine hesitates or3oor acceleration
Zxcessive oil:onsumptron
Malfunction of the exhaust gas recirculation
system
Positive crankcase ventilation line cloggedCheck the system; if there is a
problem, check its component parts
Check positive crankcase
ventila-tion system
Ioor fuel mileageMalfunction of the exhaust gas recirculation
systemTSB RevisionCheck the system; if there is a
problem, check its component parts
d

EMISSION CONTROL - Crankcase Emission Control System17-5
CRANKCASE EMISSION CONTROL SYSTEM
COMPONENTS LOCATIONJ
Ir--‘-l7FU1002
Name
Positive crankcase ventilation valveSymbolA
i{
ventilation valve\”
------rLYJ7EM0134M17KA--
CRANKCASE VENTILATION SYSTEM INSPEC-
TIONM171ABG(1) After disconnecting the ventilation hose from the positive
crankcase ventilation valve, disconnect the positive crank-
case ventilation valve from the rocker cover, and reconnect
the positive crankcase ventilation valve to the ventilation
hose.
(2) Idle engine, put finger on the opening end of the positive
crankcase ventilation valve, and check that the negative
pressure of the intake manifold is felt with finger.
NOTEAt this time, the plunger in the positive crankcase ventila-
tion valve moves back and forth.
(3) If negative pressure is not felt, clean or replace the positive
crankcase ventilation valve.
POSITIVE CRANKCASE VENTILATION VALVEMl7lACC
INSPECTION
(1) Remove the positive crankcase ventilation valve.
(2) Insert a thin stick into the positive crankcase ventilation
valve from the threaded side to check that the plunger
moves.
(3) If the plunger does not move, the positive crankcase
ventilation valve is clogged. Clean it or replace.
INSTALLATIONInstall the positive crankcase ventilation valve and tighten to
specified torque.
Specified tightening torque:
10 Nm (7.2 ft.lbs.1TSB Revision

EMISSION CONTROL - Evaporative Emission Control System17-7
PURGE CONTROL SYSTEM INSPECTION
Barometric pressure sensor
Engine control unit
7EM0161I-----I
\7EM0140t
(1) Disconnect the vacuum hose (red stripes) from the throttle
body,and connect it to a hand vacuum pump.
(2) Plug the nipple from which the vacuum hose is discon-
nected.
(3) Under the engine conditions shown below, check by
applying vacuum from a hand vacuum pump.
When engine is cold
-engine coolant temperature:
60°C (140°F) or less
When engine is hot
-engine coolant temperature:
70°C (158°F) or higher
Engine operatingcondttionApplying vacuumResult
ldllng375 mmHg(14.8 In.Hg)Vacuum is maintalned
I
after staitingengineNOTEThe vacuum will leak con-tenuously if the altitudeis 2,200 m (7.200 ft.) or
higher, or the intake airtemperature is 50°C(I 22°F) or higher.TSB Revision