Page 1723 of 4087

(d) Using SST, align the timing marks of the LH camshaftpulley and timing belt rear plate.
SST 09278±54012
(e) Check that the timing belt has tension between the crankshaft timing pulley and LH camshaft timing pulley.
14. INSTALL TIMING BELT TO RH CAMSHAFT TIMING PULLEY
(a) Remove any oil or water on the RH camshaft timing andwater pump pulley, and keep them clean.
(b) Using SST, slightly turn the RH camshaft timing pulley clockwise. Align the installation mark on the timing belt
with the timing mark of the camshaft timing pulley, and
hang the timing belt on the RH camshaft timing pulley.
SST 09278±54012
(c) Using SST, align the timing marks of the RH camshaft pulley and timing belt rear plate.
SST 09278±54012
(d) Check that the timing belt has tension between the RH
camshaft timing pulley and LH camshaft pulley.
15. SET TIMING BELT TENSIONER (a) Using a press, slowly press in the push rod using981±9,807 N (100±1,000 kgf, 220±2,205 lbf) of
pressure.
(b) Align the holes of the push rod and housing, pass a 1.27
mm hexagon wrench through the holes to keep the
setting position of the push rod.
(c) Release the press.
(d) Install the dust boot to the tensioner.
EM±50
±
ENGINE MECHANICAL Timing Belt
WhereEverybodyKnowsYourName
Page 1735 of 4087

(b) Disconnect the following hoses:(1) Vacuum hose from brake booster union
(2) Vacuum hose (from ACIS vacuum tank)
(3) Vacuum sensing hose
(4) Air hose (from PS air control valve)
(c) Remove the two bolts, and disconnect the data link connector 1 and harness protector from the air intake
chamber.
(d) Remove the five bolts, two nuts and air intake chamber and gasket.
13. REMOVE DELIVERY PIPE AND INJECTORS (See steps 4, 5, 8 and 10 on pages FI±28 and 29)
14. REMOVE NO. 1 AND NO. 2 FUEL PIPES
15. DISCONNECT ENGINE WIRE FROM INTAKE MANIFOLD (a) Disconnect the following connectors:
(1) Engine coolant temperature sensor connector
(2) Engine coolant temperature sender gauge connec- tor
(3) Two knock sensor connectors
(4) Oil pressure switch connector
(5) Oil level sensor connector
(6) A/C compressor connector
(b) Remove the three nuts and two clamp bolts.
(c) Remove the two bolts, and disconnect the harness
protector from the intake manifold.
16. REMOVE INTAKE MANIFOLD (a) Remove the two bolts and intake manifold stay.
(b) Remove the six bolts, two nuts, intake manifold andgasket.
EM±38
±
ENGINE MECHANICAL Cylinder Head
WhereEverybodyKnowsYourName
Page 1756 of 4087

8. CONNECT ENGINE WIRE TO INTAKE MANIFOLD(a) Install the harness protector to the intake manifold withthe two bolts.
(b) Install the three clamp bolts and two nuts.
(c) Connect the following connectors:
(1) Engine coolant temperature sensor connector
(2) Engine coolant temperature sender gauge connec- tor
(3) Two knock sensor connectors
(4) Oil pressure switch connector
(5) Oil level sensor connector
(6) A/C compressor connector
9. INSTALL NO. 1 AND NO. 2 FUEL PIPES
Torque: 8.8 N Vm (90 kgf Vcm, 78 in. Vlbf)
10. INSTALL DELIVERY PIPE AND INJECTORS
(See steps 1, 3, 6 and 7 on pages FI±33 and 34)
Torque: 21 N Vm (210 kgf Vcm, 15 ft Vlbf)
11. INSTALL AIR INTAKE CHAMBER
(a) Install a new gasket and the intake chamber with the five
bolts and two nuts.
Torque: 21 N Vm (210 kgf Vcm, 15 ft Vlbf)
(b) Install the check connector and harness protector to the
air intake chamber with the two bolts.
(c) Connect the following hoses: (1) Vacuum hose to brake booster union
(2) Vacuum hose (to ACIS vacuum tank)
(3) Vacuum sensing hose
(4) Air hose (to PS air control valve)
±
ENGINE MECHANICAL Cylinder HeadEM±59
WhereEverybodyKnowsYourName
Page 1779 of 4087

INSPECTION, CLEANING AND REPAIR
OF CYLINDER HEAD COMPONENTS
1. CLEAN TOP SURFACES OF PISTONS AND CYLINDERBLOCK
(a) Turn the crankshaft and bring each piston to top deadcenter (TDC). Using a gasket scraper, remove all the
carbon from the piston top surfaces.
(b) Using a gasket scraper, remove all the gasket material from the top surfaces of the cylinder block.
(c) Using compressed air, blow carbon and oil from the bolt
holes.
CAUTION: Protect your eyes when using high±pressure
compressed air.
2. CLEAN CYLINDER HEADS
A. Remove gasket material Using a gasket scraper, remove all the gasket material from the cylinder block surface.
NOTICE: Be careful not to scratch the cylinder block con-
tact surface.
B. Clean combustion chambers Using a wire brush, remove all the carbon from the combus-
tion chambers.
NOTICE: Be careful not to scratch the cylinder block con-
tact surface.
C. Clean valve guide bushings Using a valve guide bushing brush and solvent, clean all the
guide bushings.
EM±78
±
ENGINE MECHANICAL Cylinder Heads
WhereEverybodyKnowsYourName
Page 1822 of 4087

(c) Disconnect the following connectors:(1) Two connectors from engine room main wire
(2) Igniter connector
(3) Theft deterrent horn connector
(d) Disconnect the wire harness from the two wire clamps.
(e) Using a 6 mm hexagon wrench, remove the bolt and connector bracket.
(f) Disc onnect the wire clamp and PS solenoid valve
connector.
(g) Disconnect the ground strap from the cylinder block.
(h) Disconnect the PS pressure switch connector.
(i) Disconnect the following connectors: (1) Ignition coil connector
(2) Noise filter connector
(j) Remove the cap and nut, and disconnect the generator wire.
(k) Disconnect the wire harness from the two wire clamps.
(l) Disconnect the following hoses: (1) Vacuum hose (from VSV for heater vale) from check valve.
(2) Heater water hose from heater water valve.
(3) Heater water hose from water by±pass pipe
(m) Disconnect the VSV connector.
(n) Disconnect the ground strap from the bracket on the body.
(o) Remove the bolt holding the engine wire protector from
the body.
±
ENGINE MECHANICAL Cylinder BlockEM±67
WhereEverybodyKnowsYourName
Page 1831 of 4087
PREPARATION FOR DISASSEMBLY
(See Components on pages EM±74 and 75)1. (M/T) REMOVE FLYWHEEL
2. (A/T) REMOVE DRIVE PLATE
Remove the eight bolts, two spacers and drive plate.
3. INSTALL ENGINE TO ENGINE STAND FOR DISASSEMBLY
4. REMOVE GENERATOR
5. REMOVE THROTTLE BODY WITH INTAKE AIR CONNECTOR (See pages EM±10 to 11)
6. REMOVE TIMING BELT AND PULLEYS (See pages EM±24 to 26)
7. REMOVE WATER PUMP AND BY±PASS HOSE
8. REMOVE FUEL PRESSURE PULSATION DAMPER
9. REMOVE CYLINDER HEAD (See pages EM±36 to 40)
10. REMOVE FUEL PIPE SUPPORT
11. REMOVE OIL PRESSURE SWITCH AND KNOCK SENSORS
SST 09816±30010
12. REMOVE LH ENGINE MOUNTING BRACKET
13. REMOVE RH ENGINE MOUNTING BRACKET
14. REMOVE OIL FILTER BRACKET (a) Remove the union bolt and oil filter bracket.
(b) Remove the gasket from the union bolt.
(c) Remove the O±ring from the oil filter bracket.
15. REMOVE OIL PUMP (See page LU±10)
EM±76
±
ENGINE MECHANICAL Cylinder Block
WhereEverybodyKnowsYourName
Page 1856 of 4087

5. INSTALL KNOCK SENSORS AND OIL PRESSURESWITCH
Using SST, install the two knock sensors and oil pressure
switch.
SST 09816±30010
Torque:
Knock sensor 44 N Vm
(450 kgf Vcm, 33 ft Vlbf)
Oil pressure switch 14 N Vm
(150 kgf Vcm, 11 ft Vlbf)
6. INSTALL FUEL PIPE SUPPORT
Torque: 14 N Vm (145 kgf Vcm, 10 ft Vlbf)
7. INSTALL CYLINDER HEAD
(See pages EM±54 to 57)
Torque: 1st 34 N Vm (350 kgf Vcm, 25 ft Vlbf)
2nd turn 90 5
3rd turn 90 5
8. INSTALL FUEL PRESSURE PULSATION DAMPER
(See step 1 on page FI±36)
Torque: 41 N Vm (420 kgf Vcm, 30 ft Vlbf)
35 N Vm (350 kgf Vcm, 25 ft Vlbf) for SST
9. INSTALL WATER PUMP AND BY±PASS PIPE
(a) Install the water pump. (See page CO±7)
(b) Install the No. 2 water by±pass pipe with the bolt.
(c) Connect the No. 2 water by±pass hose to the engine hanger.
10. INSTALL THROTTLE BODY WITH INTAKE AIR
CONNECTOR
(See page EM±18)
Torque: 21 N Vm (210 kgf Vcm, 15 ft Vlbf)
11. INSTALL TIMING PULLEYS AND BELT
(See pages EM±29 to 33)
12. INSTALL GENERATOR
Torque: 37 N Vm (380 kgf Vcm, 27 ft Vlbf)
13. REMOVE ENGINE STAND FROM ENGINE
±
ENGINE MECHANICAL Cylinder BlockEM±101
WhereEverybodyKnowsYourName
Page 1864 of 4087

(c) Install the bolt holding the engine wire protector on thebody.
(d) Install the ground strap to the bracket on the body.
(e) Connect the VSV connector.
(f) Connect the following hose: (1) Heater water hose to water by±pass pipe
(2) Heater water hose to heater water valve
(3) Vacuum hose (from VSV for heater water valve) to
check valve.
(g) Install the generator wire with the nut and cap.
(h) Connect the following connector: (1) Ignition coil connector
(2) Noise filter connector
(i) Install the wire harness with the two wire clamps.
(j) Connect the PS pressure switch connector.
(k) Install the ground strap on the cylinder block.
(l) Connect the PS solenoid valve connector and wire
clamp.
(m) Using a 6 mm hexagon wrench, install the connector bracket with the bolt.
(n) Connect the following connectors: (1) Two connectors to engine room main wire
(2) Igniter connector
(3) Theft deterrent horn connector
(o) Install the wire harness with the two wire clamps.
±
ENGINE MECHANICAL Cylinder BlockEM±109
WhereEverybodyKnowsYourName