1967 CHEVROLET CAMARO electrical

[x] Cancel search: electrical

Page 59 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-36

(These tests should be performed with the engine at operating temperature.)

SYSTEM CHECKS

Control

Head

Setting

High

Front

Lo

Front

Lo

Front

Hi

Front

Hi

Page 72 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-49

CHEVROLET

CHEVELLE

CHEVY II

CAMARO 
the last possible moment. Be certain that the

direction of flow is correct before connecting

the pipes.

Chevrolet, Chevell

Page 80 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-57

EVAPORATOR PIPES

DISTRIBUTOR RELAY GRD.

ASSEMBLY & WASHER

EVAPORATOR ASM. 
BLOWER

SHROUD

(RACKET

(PART OF

BLOWER)

Fig.
 76—Evaporator Removal—All Weathe

Page 83 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-60

Fig.
 81-P.O.A. Installation (Camaro)

NOTCH IN SUPPORT

TO ENGAGE SLOT !N VALVE

WHEN VALVE IS ROTATED

TO ANGLE AS SHOWN

Fig.
 82-P.O.A. Installation (Chevelle)

Page 84 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-61

INSERT CAPILLARY

BETWEEN FINS AT

ARROW

Fig.
 84—Thermostatic Switch Capillary Installation

All-Weather System (Thermostatic Switch Only)

Chevy II

Replacemen

Page 85 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-62

2.
 Insert the evaporator assembly into the outlet case

half and mount the evaporator, thermostatic switch,

and cable to the case.

3.
 Install the face plate to

Page 86 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-63

Under Dash

7. Remove ash tray and retainer, and glove box.

8. Remove blower case to air inlet adapter bracket

retaining screw.

9. Remove screw attaching air dis

Page 96 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-73

Fig.
 105—Comfortron Control Head

10.
 Introduce R-12 vapor at cylinder (room) temperature

and pressure.

11.
 Leak test all fittings and connections and give p
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 152 next >