Page 17 of 51
3-1 Preparation Items
Preparation Items
Specification Purpose
PPE (personal protective
equipment):
Insulated gloves Up to 1,000V
For
protection from high voltage electri-
cal shock
Insulated shoes –
Safety
shield –
W
renches Size: 10mm
T
o remove the 12V battery terminal
bolt.
Solvent resistant
protection gloves
Solvent resistant
protection shoes –
To utilize in the event of a Li-ion battery
electrolytic solution leak.
–
Absorbent pad The same pad used for internal com-
bustion engine fluids can be used. To absorb any Li-ion battery electrolytic
solution leakage.
Standard fire fighting
equipment Standard fire fighting equipment.
Depending on type of fire (vehicle or
battery) use standard fire fighting
equipment (water or extinguisher) . To extinguish a fire.
Insulated tape Insulating To cover any damaged harnesses to
protect from and prevent electrical
shock. Tape should cover all bare or
damaged wire.
DG–17
Page 18 of 51

3-2 Personal Protective Equipment (PPE) and Insulated Tools
3-2.1
Personal Protective Equipment (PPE) Protective Wear Control
Perform an inspection of the Personal Protective Equipment (PPE) items before beginning work. Do not use
any damaged PPE items.
3-2.2 Daily Inspection
This inspection is performed before and after use. The worker who will be using the items should perform
the inspection and check for deterioration and damage. • Insulated rubber gloves should be inspected for scratches, holes and tears. (Visual check and airleakage test)
• Insulated safety boots should be inspected for holes, damage, nails, metal pieces, wear or other problems on the soles. (Visual check)
• Insulated rubber sheet should be inspected for tears. (Visual check)
3-2.3 Insulated Tools
When performing work at locations where high voltage is applied (such as terminals) , use insulated tools
meeting 1,000V/300A specifications.
3-3 Discharge Procedures Do not perform this procedure if the high voltage battery is damaged. If you are unsure of
battery
damage, use extreme caution and always wear appropriate Personal Protective
Equipment (PPE) when working on high voltage components.
Li-ion battery discharging must take place before dismantling. Sufficient discharging can be achieved by
following these steps. 1. Place the shift selector into the Park (P) position
2. Apply the parking brake.
3. Set wheel chocks to ensure the vehicle is completely stopped.
4. Fasten the driver seat belt and close the driver door.
5. Apply foot brake and press the ignition switch to turn the system ON. Confirm READY indicator in instrument cluster turns ON.
a.
If the engine starts, leave the engine on until idling stops.
b. If the engine does NOT start, move on to next step.
6. Remove the shift lock cover (A) using a suitable tool.
7. Push down the shift lock (B) as shown in the illustration.
8. Push the shift selector button (C) and move the shift selector to Neutral (N) position (D) while holding down
the shift lock.
NOTE:
DO NOT press accelerator or foot brake after
moving the shift selector to the Neutral (N)
position. Otherwise Li-ion battery will start to be
charged. AAYIA0067ZZ
DG–18
Page 19 of 51

9. Release the parking brake.
10. Turn ON electric devices such as headlamps, A/C (set to the coldest temperature) and rear
window defogger to discharge the high voltage battery. Allow approximately 15 minutes to
discharge. Discharge is complete when the READY indicator (B) (green) turns OFF and the
hybrid
system warning indicator (C) (orange) turns ON.
11. Press the ignition switch (A) to turn the system OFF.
Please contact following number if the vehicle could not be discharged. • 1-800-662-6200 (US) or 1-800-361-4792 (Canada)
• Hours of operation are 8am-5pm (Monday-Friday) Eastern, Central and Pacific time zones.
3-4 How to Handle a Damaged Vehicle
3-4.1 High Voltage System Shut-Down Procedure
Any of the following procedures can shut down the high voltage system. The dismantling operation can only
begin after shutting down the high voltage system. If the vehicle is heavily damaged, for example the Li-ion
battery is deformed, broken or cracked, appropriate PPE must always be used and the Li-ion battery and
high voltage components must not be touched. • Failure to properly shut down the high voltage system before the dismantling
procedures
are performed will result in serious injury or death from electrical shock. To
prevent serious injury or death, NEVER touch high voltage harnesses or components
without always wearing appropriate Personal Protective Equipment (PPE) . PPE
must always be worn when touching or working on high voltage components
• When contact with high voltage components or high voltage harnesses is
unavoidable,
or when there is risk of such contact, you must always wear appropriate
PPE. PPE must always be worn when touching or working on high voltage
components. AAYIA0033ZZ
DG–19
Page 20 of 51

• The vehicle contains parts that contain powerful magnets. If a person who is wearing a
pacemaker or other medical device is close to these parts, the medical device may be
affected by the magnets. Such persons must not perform work on the vehicle.
• Be sure to check the READY indicator (1) in the instrument cluster, and verify that the READY indicator is off and the high voltage system is stopped.
• After the high voltage system is shut down, please wait for approximately ten (10) minutes for complete discharge of the high voltage capacitor. While waiting, do not
operate any vehicle functions.
• Remove the 12V battery negative (-) terminal and wait for three (3) minutes to discharge the air bag capacitor. Even though the 12V battery negative (-) is disconnected, the
Supplemental Restraint System (SRS) air bag maintains voltage for three (3) minutes.
There is a possibility of sudden SRS air bag inflation due to harness short circuit or
damage and it may cause serious injuries.
• The 12V system will remain active even after the 12V battery negative (-) terminal is removed while the high voltage system is active. This is because the DC/DC converter will
not shut down and power will be supplied to the 12V system and high voltage system
continuously.
Before disconnecting the 12V battery terminal, if necessary, lower the windows, adjust the steering column,
adjust the seats, unlock the doors, open the trunk, etc. as required. Once the 12V battery is disconnected,
power controls will not operate.
Powering Down the High Voltage System
The high voltage system can be shut down with any 1 of the following procedures: • Turn OFF the power switch and disconnect the 12V battery. Refer to Primary Procedure (DG–21)
.
•
Remove the fuse for the high voltage control system and disconnect the 12V battery.
Refer to Alternate Procedure 1 (Remove Fuses) (DG–23) .
•
Remove the service plug and disconnect the 12V battery. Refer to Alternate Procedure 2 (Remove
Service
Plug) (DG–25) .DG–20
Page 21 of 51

Primary Procedure
NO
TE:
Before disconnecting the 12V battery terminal, if necessary, lower the windows, adjust the
steering column, adjust the seats, unlock the doors, etc. Once 12V battery is disconnected,
power controls will not operate.
1. Check the READY indicator (A) status in the instrument cluster. If it is on, the high voltage systemis active.
2. Place the shift selector in the Park (P) position.
3. Push the ignition switch (B) once to turn OFF the high voltage system. Then verify whether the READY indicator (A) is off.
If the READY indicator (A) does not turn off, continue to the next steps to open the trunk for 12V
battery negative cable access.
4. If possible, keep the Infiniti Intelligent Key at least 5 meters (16 feet) away from the vehicle (except as noted
below) .
5. Open the trunk using any of the following: a. push-button switch (C) on the lower LH side ofthe instrument panel.
b. trunk button (D) on the Infiniti Intelligent Key [press for longer than one (1) second].
c. trunk open request switch (E) (located above license plate)*.
d. with the mechanical key (F) housed inside the Infiniti Intelligent Key. Method
Shift Selector Position Ignition Switch Status
a
P or N Any
b POFF
c* Any Any
d Any Any
* You must have the Infiniti Intelligent Key within approximately 1 meter (3 feet) range of trunk request switch
to use the trunk open request switch function. AAYIA0062ZZ
AAYIA0068ZZ
DG–21
Page 22 of 51
6. Open the 12V battery service access cover (G) .
7.
Disconnect negative (-) battery cable (H) and cover it with insulated tape.
8. Wait approximately ten (10) minutes for complete discharge of the high voltage capacitor after the battery cable has been disconnected.
9. Perform the dismantling operation. Refer to 6. Dismantling Information (DG–38). AAYIA0034ZZ
DG–22
Page 23 of 51
Alternate Procedure 1 (Remove Fuses)
NO
TE:
Before removing any fuses, if necessary, lower the windows, adjust the steering column,
adjust the seats, unlock the doors, etc. Once fuses are removed, power controls will not
operate.
1. Pull release handle (A) to open the hood.
2. Remove fuse box cover (B) .
3. Remove 80A fuse (C) (black) .
4. If you cannot identify the fuse (C) , remove all fuses in the fuse box. To avoid unintended reinstallation and risk of electrical shock and severe personal injury
or
death, the dismantler should carry the fuse or fuses on his/her person and cover the
fuse box with insulated tape. AAYIA0004GB
DG–23
Page 24 of 51
5. Open the trunk. The trunk can be opened with the push-button switch (D) on the lower LH side of
the instrument panel or with the mechanical key (E) housed inside the Infiniti Intelligent Key.
6. Open the 12V battery service access cover (F) .
7. Disconnect negative (-) battery cable (G) and cover it with insulated tape.
8. Wait approximately ten (10) minutes for complete discharge of the high voltage capacitor after the fuse is pulled and battery cable has been disconnected.
9. Perform the dismantling operation. Refer to 6. Dismantling Information (DG–38). AAYIA0011GB
DG–24