2012 SSANGYONG KORANDO check engine

[x] Cancel search: check engine

Page 141 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-6
Check the installed components again and connect the negative battery cable. Start the engine and 
check the operating status.
With Scan Tool, check if there are current faults and erase the hist

Page 142 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-70000-00
2) Diagnostic Test for Engine Fuel System
(1) Overview
If a DTC is displayed on the diagnostic device, check the low pressure- and high pressure fuel systems 
before removing the component

Page 148 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-130000-00
(5) High Pressure System Pressure Test
Fuel rail pressure test ▶
Disconnect the fuel rail pressure sensor 
connector and then IMV connector. 1.
Connect the pressure tester to the fuel r

Page 149 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-14
How To Use Pressure Tester ▶
Press the "TEST" button on the tester to 
check if the message "TEST?" is displayed.
If the button is pressed again at 4 seconds 
after starting engine cranking, t

Page 150 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-150000-00
(6) Low Pressure System Pressure Test
Inspection procedure ▶
All wirings/connectors and fuel lines should be 
connected and the engine should work 
properly.
Prepare a special tool for

Page 151 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-16
Static test for backleak of injector ▶
Disconnect the injector return hose and cover 
the openings with caps shaped screw (included 
in the special tool). 1.
Connect the hose of the container

Page 152 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-170000-00
Dynamic test for backleak of injector ▶
Warm up the engine so that the engine 
coolant temperature be over 80℃ and star 
the engine again.
Disconnect the injector return hose and cove

Page 153 of 1082

SSANGYONG KORANDO 2012  Service Manual 03-18
Pressure leak test in fuel system with scan tool ▶
When the dynamic test for injector backleak is performed, this test should be done together with it. 
However, you can check the pressure lea
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 72 next >