1-1-2 Workshop Manual Issue 5, January 2010
RH/LH Seat Switchpack Assembly - Renew...........7-13
Lumbar Pump for the Front Seat (From 08MY)
- Remove and Install.............................................7-13
Lumbar Valve for the Front Seat (From 08MY)
- Remove and Install.............................................7-14
Lumbar Bladder for the Front Seat (From 08MY)
- Remove and Install.............................................7-14
Glass, Frame and Mechanism (01.11) .................. 1-8-1 Description .............................................................8-1 Frameless doors......................................................8-1
Specifications .........................................................8-1
Maintenance ...........................................................8-1 Glass Regulator - Renew .........................................8-1
RH/LH Door Glass - Renew ....................................8-2
Door Glass - Adjust/Reset .......................................8-3
Front Windshield - Renew ......................................8-3
Rear Windshield - Renew .......................................8-4
Quarter Window Glass - Renew .............................8-6
Passenger Window Lift Switch - Renew ..................8-6
Driver Window Lift Switch - Renew........................8-7
Instrument Panel (IP) (01.12)................................ 1-9-1 Specifications ..........................................................9-1
Maintenance ...........................................................9-1 Instrument Panel - Renew ......................................9-1
Airbag Panel and Door Assembly - Renew ..............9-6
Glovebox Assembly - Renew ..................................9-6
Instrument Centre Panel Asse mbly - Renew............9-7
Knee Protector - Renew .........................................9-7
Instrument Panel As sembly - Renew .......................9-7
Cluster Bezel Panel - Renew .................................9-10
Driver Panel Assembly - Renew ............................9-10
Instrument Panel Bezel A ssembly (With Sat. Nav.)
- Renew ...............................................................9-11
Instrument Panel Bezel Assembly
(Without Sat. Nav.) - Renew .................................9-11
Rear Console Panel Assembly - Renew .................9-12
Armrest Pad Assembly - Renew ............................9-13
Console Panel Assembly - Renew .........................9-13
RH/LH Rear Console Pa nel Assembly - Renew
(Roadster Only) ....................................................9-13
Centre Console Panel - Remove and Install
(Coupe Only) .......................................................9-15
Centre Console Panel - Remove and Install
(Roadster Only) ....................................................9-19
RH/LH Lower Quarter Panel Assembly - Renew
(Roadster Only) ....................................................9-29
Handles and Lock Mechanisms (01.14) .............. 1-10-1 Description ...........................................................10-1 Vehicle Key/Remote Transmitter...........................10-1
Central Locking System ........................................10-1
Remote Transmitter ..............................................10-1
Fuel Filler Assembly ..............................................10-1
Boot Emergency Release ....... ...............................10-1
Specifications ........................................................10-2
Maintenance .........................................................10-2 Ignition Cylinder Lock - Re new.............................10-2
RH/LH Front Door Latch As sembly - Renew .........10-2
Bonnet Latch Assembly - Renew...........................10-3
Hood Release Cable Assembly - Renew (Roadster Only) .................................................... 10-3
Bonnet Secondary Latch Asse
mbly - Renew ......... 10-4
Tailgate Latch and Cable Assembly - Renew ......... 10-4
Fuel Filler Actuator Assembly - Renew
(Roadster Only) .................................................... 10-4
Fuel Filler Release Cable - Renew (Roadster Only) 10-5
Fuel Flap Release Switch - Renew ........................ 10-6
RH/LH Tonneau Latch Motor - Renew
(Roadster Only) .................................................... 10-7
RH/LH Tonneau Latch - Renew (Roadster Only) ... 10-7
RH/LH Tonneau Cover Striker Assembly
- Renew (Roadster Only) ...................................... 10-8
Tailgate Latch Assembly-Renew (Roadster Only) ... 10-8
Wipers and Washer System (01.16) ....................1-11-1 Headlamp Washing .............................................. 11-1
Specifications ........................................................ 11-2
Maintenance ......................................................... 11-2 Windscreen Wiper Motor As sembly - Renew ....... 11-2
Wiper Linkage Assembly - Renew ........................ 11-2
Windshield Wash Tube - Renew .......................... 11-2
Windscreen Reservoir and Motor Assembly
- Remove and Install ............................................ 11-3
Low Level Water Sensor - Remove and Install ...... 11-4
Headlamp Wash Motor and Pump Assembly
- Renew ............................................................... 11-5
Headlamp Wash Tube Assembly - Renew ............ 11-5
Washer Fluid Reservoir - Renew........................... 11-6
Convertible Roof and Roof Opening Subsystem
(01.17)..................................................................1-12-1 System Description .............................................. 12-1
Maintenance ......................................................... 12-2 Hood Assembly-Renew ........................................ 12-2
Canopy Cover - Renew ........................................ 12-5
Header Latch Motor - Renew ............................... 12-9
Hydraulic Main Actuator Cy linder - Renew .......... 12-9
Hydraulic Tensrod Cylinder - Renew .................. 12-10
Hydraulic Tonneau Cylinder - Renew................. 12-11
Convertible Top ECU - Renew ........................... 12-13
Hydraulic Pump - Renew ................................... 12-13
Hydraulic Lock Valve - Renew............................ 12-16
RH/LH Front Cantrail Seal - Spare Part
- Renew ............................................................. 12-18
RH/LH Front Cantrail Seal Spare Part Kit
- Renew ............................................................. 12-18
RH/LH Middle Cantrail Seal Spare Part
- Renew ............................................................. 12-18
RH/LH Middle Cantrail Seal Spare Part Kit
- Renew ............................................................. 12-19
Rear Seal Spare Part Assembly Kit - Renew ......... 12-20
LH Fully Automatic Latching Kit - Renew............ 12-21
RH Fully Automatic Latching Kit - Renew ........... 12-22
Convertible Roof Hydraulic Pump
- Check Fluid Level ............................................ 12-23
Cantrail Cover Trim - Renew .............................. 12-25
B-Post Trim Cover - Renew ................................ 12-25
Tonneau Cover - Renew .................................... 12-27
LH Front Main Hydraulic Cylinder Pipe
- Renew ............................................................. 12-29
LH Rear Main Hydraulic Cylinder Pipe
Issue 5, January 2010 Workshop Manual 1-1-3
- Renew ............................................................. 12-33
RH Front Main Hydraulic Cylinder Pipe
- Renew ............................................................. 12-37
RH Rear Main Hydraulic Cylinder Pipe
- Renew ............................................................. 12-40
LH Front Hydraulic Cylinder Pipe - Renew........ 12-43
LH Rear Hydraulic Cylinder Pipe - Renew.......... 12-46
RH Front Hydraulic Cylinder Pipe - Renew ........ 12-50
RH Rear Hydraulic Cylinder Pipe - Renew ......... 12-53
RH/LH Rear Hydraulic Tonneau Cylinder Pipe
- Renew ............................................................. 12-56
LH/RH Front Hydraulic Tonneau Cylinder Pipe
- Renew ............................................................. 12-60
Hydraulic Cylinder Valve to Pump Pipe
- Renew ............................................................. 12-63
Wind Deflector - Renew .................................... 12-66
Tonneau Well Liner - Renew . ............................ 12-67
RH/LH Flex Shaft - Renew ................................. 12-69
Bumpers (01.19) .................................................. 1-13-1 Front Bumper ....................................................... 13-1
Rear Bumper......................................................... 13-1
Specifications........................................................ 13-2
Maintenance ......................................................... 13-2Front Bumper Cover - Renew .............................. 13-2
Rear Bumper Cover - Renew................................ 13-3
Restraining Devices (01.20)................................. 1-14-1 Seat Belts .............................................................. 14-1Emergency Locking Retractor (ELR) ...................... 14-2
Airbag System ....................................................... 14-3
Maintenance ......................................................... 14-4 Driver’s Airbag Module - Renew .......................... 14-4
LH Front Seat Belt - Renew .................................. 14-4
RH Front Seat Belt - Renew.................................. 14-5
Passenger Airbag - Renew .................................... 14-6
ARS Side Impact Sensor Assembly - B Pillar
- Renew ............................................................... 14-6
Side Impact Door ARS Sensor Assembly
- Renew ............................................................... 14-6
Front Impact Sensor Assembly - Renew ................ 14-7
Occupant Restraint Control Module Assembly
- Renew ............................................................... 14-7
RH/LH Roll Over Protection System - Renew ....... 14-8
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-1
Body System (01.00)
Convertible Roof and Roof Opening Subsystem (01.17)
System Description
The convertible roof system comprises of an electrically dr iven hydraulic pump and six hydraulic rams. Four rams raise
and lower the roof and two raise and lower the tonneau cover. The pump is powered via either the 'Hydraulic Pump Fluid
In' or 'Hydraulic Pump Fluid Out' relay and is instructed vi a the Convertible Roof Module (CRM). The CRM is activated by
the Console mounted Roof Switch. A further module controls the position and drive command for the Tonneau Latches.
The roof hydraulic pump is protected by a 30A fuse. During Roof Operation the door glass and boot release commands
are also controlled by the CRM.
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-13
Convertible Top ECU - Renew
Removal
1. Remove wheel arch liner rear RH (see Workshop Manual procedure 01.02.HB Wheel Arch Liner - Rear -
RH - Renew).
2. Remove bolts (x4) securing ECU mounting plate and release from body (see Figure 1).
3. Disconnect multiplugs (x3) from ECU (see Figure 2).
4 . R e m o v e E C U f r o m m o u n t i n g p l a t e ( n u t s x 2 ) .
Installation
1. Install ECU to mounting plate.
2. Connect multiplugs (x3) to ECU. 3. Position mounting plate to body and install securing
bolts.
4. Remove wheel arch liner rear RH (see Workshop Manual procedure 01.02.HB Wheel Arch Liner - Rear -
RH - Renew).
Hydraulic Pump - Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
Repair Operation Time (ROT)
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)1-12-16 Workshop Manual May 2007
12. Loosen (x6) screws retain ing plate (see Figure 10).
13. Slide retaining plate, disconnect pipes and remove pump (pipes and locations are numbered).
Installation
1. Check pump hydraulic oil le vel and top-up if required
(see Figure 1).
2. Clean pipes and install pipes to pump.
3. Slide retaining plate into place and tighten screws (pipes and locations are numbered).
4. Connect motor lucar connectors (x2).
5. Install end cover (locating tabs x2).
6. Connect pump multiplug.
7. Connect pump multiplug.
8. Install motor under tonneau body side ensuring the roof can be operated without pipes or wires fouling and
insulate with cloth if required. 9. Install cylinder pivot bracket and connect cylinder to
bracket.
10. Operate roof from fully shut to fully open then to halfway position with tonneau open and support roof
when hydraulic pressure drop s with suitable straps and
support tonneau cover with suitable prop.
11. Disconnect cylinder and remove cylinder pivot bracket.
12. Check pump and pipes for leaks.
13. Remove pump from tonneau bodyside and check oil level. If top up necessary remove reservoir end plug with
pump in upright position, add small quantity of oil
replace plug and re-check level.
14. Install pump casing and secure velcro.
15. Install pump and casing under tonneau onto location posts.
16. Install cylinder pivot bracket and connect cylinder to bracket.
17. Move tonneau well liner arou nd lower cylinder fixing
and motor casing and secure velcro.
18. Install trim clip and positi on tonneau lining stiffening
rod.
19. Restore roof and tonneau to original positionHydraulic Lock Valve - Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
Figure 10
Figure 1
Repair Operation Time (ROT)
ItemCode
Hydraulic Lock Valve-Renew 01.17.AV
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM. IF THE ROOF REQUIRES MAINTENANCE, SUPPORT
PROPERLY USING SUITABLE PROPS AND STRAPS.
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-23
2. Align and install latching kit, secure with nuts and screw.
3. Attach tie rod, secure with C-clip.
4. Install right-hand header latch flex shaft (see Workshop Manual procedure 01.17.EG Flex Shaft - RH - Renew).
Convertible Roof Hydraulic Pump -
Check Fluid Level
Removal
1. Operate roof to halfway position with tonneau open. Support roof when hydrau lic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1). 2. Remove trim clip and releas
e tonneau lining stiffening
rod (see Figure 2).
3. Release velcro and move tonneau well liner aside to
expose lower cylinder fixing and pump casing.
4. Release cylinder lower retaining clip and disconnect cylinder from body (see Figure 3).
Repair Operation Time (ROT)
Figure 2
Figure 3
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-33
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle and install cable ties.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Install pump casing and secure velcro.
5. Install pump and casing under tonneau onto location posts.
6. Install cylinder pivot bracket and connect cylinder to bracket.
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position.LH Rear Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
Figure 1
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-37
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position
RH Front Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1). 2. Remove panel quarter trim lower (see Workshop
Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
4. Cut cable ties securing pipes and wires to cylinder (see Figure 2).
5. Release clips securing pipes to cylinder and disconnect pipes.
6. Release fir tree clip and cable tie securing both pipes to roof frame (remove pipes as pair).
7. Attach string to cylinder end of both pipes to aid
installation.
Repair Operation Time (ROT)
Figure 1
Figure 2