2009 RENAULT TWINGO lock

[x] Cancel search: lock

Page 403 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13B-42
DIESEL INJECTION
High pressure pipe between rail and injector: Removal - Refitting
K9K
13B
aFit and lock a new clip between the high pressure
pipes between the rail and the injectors.
aUsing th

Page 405 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13B-44
DIESEL INJECTION
Injector rail: Removal - Refitting
K9K
13B
aDisconnect:
-the fuel flow actuator (3) ,
-the diesel temperature sensor (4) .
aAt (5) , unclip the electrical wiring from the neck.

Page 408 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13B-47
DIESEL INJECTION
Injector rail: Removal - Refitting
K9K
13B
aRemove the blanking plugs.
aFit the injector rail.
aFit the injector rail nuts without tightening them.
III - FINAL OPERATION.
a
aRe

Page 414 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13B-53
DIESEL INJECTION
Accelerometer: Removal - Refitting
K9K
13B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aRemove the front engine cover.
aRemove:
-the dipstick,
-the oil level dipstick nut (1) ,
-

Page 415 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13B-54
DIESEL INJECTION
Accelerometer: Removal - Refitting
K9K
13B
II -  OPERATION FOR REMOVAL OF PART 
CONCERNED
aDisconnect the accelerometer connector (4) .
aRemove the accelerometer (4) using the

Page 418 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 13C-3
PREHEATING
Heater plugs: Removal - Refitting
K9K
13C
a
aLoosen the heater plugs (3) using a 10 mm long ra-
dio socket connected to a universal joint or a hinged
wrench for heater plug.
aUse a ho

Page 446 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 16A-7
STARTING - CHARGING
Alternator: Removal - Refitting
K4M
16A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equ

Page 448 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 16A-9
STARTING - CHARGING
Alternator: Removal - Refitting
K4M
16A
aRefit the alternator strut.
aTighten to torque and in order the alternator strut
bolts (25 N.m).
III - FINAL OPERATION
aRefit:
-the a