RF-2Revision: 2006 November2007 350Z Check Roof Actuator (Close Operate) .................... 66
Check Roof Full Close Detection Switch ................ 67
Check 5th Bow Actuator (Close Operate) .............. 69
Check 5th Bow Full Close Detection Switch (Close
Operate) ................................................................. 69
Check 5th Bow Full Open Detection Switch (Close
Operate) ................................................................. 71
Check 5th Bow Half-Latch Switch (Close Operate) ... 72
Check 5th Bow Full-Latch Switch ........................... 73
Check 5th Bow Ending Switch ................................ 75
Check 5th Bow Closure Motor ................................ 76
Check Soft Top Front Lock Switch .......................... 77
Check Operation Permission Condition .................. 78
Check Each Switch Condition (Open Operate) ...... 80
Check Each Switch Condition (Close Operate) ...... 81
Check Power Window Down Request Signal ......... 81
Check Power Window Harness .............................. 82
Check Passenger Side Seat Operate Signal 1 ....... 82
Check Passenger Side Seat Operate Signal 2 ....... 83
Check Passenger Side Seat Operate Signal 3 ....... 83
Check Seat Back Position Signal ........................... 83
Check Speed Signal Circuit .................................... 84
Check Indicator Lamp Circuit ................................. 85
Removal and Installation of Soft Top Control Unit ... 86
REMOVAL ........................................................... 86
INSTALLATION .................................................... 86
Component Parts Drawing ...................................... 87
Removal and Installation of Soft Top Assembly ...... 88
REMOVAL ........................................................... 88
INSTALLATION .................................................... 89
Removal and Installation of Soft Top Cover ............ 90
REMOVAL ........................................................... 90
INSTALLATION .................................................... 97
Removal and Installation of Switches ...................107
REMOVAL .........................................................107
INSTALLATION ..................................................107
Removal and Installation of Roof Actuator ...........108
REMOVAL .........................................................108
INSTALLATION ..................................................108
Removal and Installation of 5th Bow Drive Unit ....108REMOVAL ..........................................................108
INSTALLATION .................................................. 111
Removal and Installation of Front Lock .................115
REMOVAL ..........................................................115
INSTALLATION ..................................................115
INSPECTION AND ADJUSTMENT ...................115
Repairing Method for Water Leakage Around Doors .116
WATER LEAKAGE FROM A ..............................116
WATER LEAKAGE FROM B ..............................117
WATER LEAKAGE FROM C .............................117
WATER LEAKAGE FROM D .............................118
WATER LEAKAGE FROM E ..............................118
WATER LEAKAGE TEST ..................................119
Correspondence in Emergency ............................120
MANUAL OPERATION (SOFT TOP FULLY
OPEN FULLY CLOSE) ..................................120
MANUAL OPERATION (SOFT TOP FULLY
CLOSE FULLY OPEN) ..................................121
STORAGE LID .........................................................123
Removal and Installation of Storage Lid Assembly .123
REMOVAL ..........................................................123
INSTALLATION ..................................................123
Removal and Installation of Storage Lid Inside Unit .124
REMOVAL ..........................................................124
INSTALLATION ..................................................125
Removal and Installation of Storage Lid Actuator .126
REMOVAL ..........................................................126
INSTALLATION ..................................................126
Removal and Installation of Storage Room Finisher .126
REMOVAL ..........................................................126
INSTALLATION ..................................................127
Removal and Installation of Storage Outer Protector .127
Adjustment of Storage Lid .....................................128
ADJUSTMENT IN FULLY CLOSED POSITION .128
ADJUSTMENT IN FULLY OPENED POSITION .129
Removal and Installation of Storage Lid Striker Lock
& Storage Lid Emergency Opener Cable ..............130
REMOVAL ..........................................................130
INSTALLATION ..................................................130
RF-12
SOFT TOP
Revision: 2006 November2007 350Z
Following Parts Are Built Into 5th Bow Auto Closure Assembly.
5th bow half-latch switch built in 5th bow lock assembly in storage lid.
5th bow full-latch switch built in 5th bow lock assembly in storage lid.
5th bow ending switch built in 5th bow lock assembly in storage lid.
5th bow unlock actuator.
5th bow closure motor.
NOTE:
Always replace following switches as a 5th bow lock assembly.
5th bow half-latch switch
5th bow full-latch switch
5th bow ending switch.
5th bow full open detection switch and 5th bow full close detection switch are built into 5th bow switch assem-
bly located at plate rail RR. Replace above switches as a plate rail RR.
System DescriptionNIS0006C
An electronic soft top open/close system has been adopted that allows the soft top to be opened or closed
using the soft top switch.
The following parts operate, linked with the operation of the soft top.
When the soft top begins to operate, the passenger seat tilts forward. When operation is completed, it
returns to its original position.
(It does not move when the seat cancel switch is ON.)
When the soft top begins to operate, both power windows activate to the fully-open position.
(They do not activate to the fully-closed position after operation is completed.)
Moreover, power window cannot be operated while soft top is operating.
When the soft top switch is released, soft top operation stops.
PIIB9112E
SOFT TOP
RF-45
C
D
E
F
G
H
J
K
L
MA
B
RF
Revision: 2006 November2007 350Z
2. CHECK 5TH BOW HALF-LATCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect soft top control unit and soft top lock switch (at 5th bow lock assembly in storage lid) connec-
tor.
3. Check continuity between soft top control unit connector B67
terminal 31 and soft top lock switch connector T205 terminal 5.
4. Check continuity between soft top control unit connector B67
terminal 31 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness.
3. CHECK 5TH BOW HALF-LATCH SWITCH GROUND CIRCUIT
Check continuity between soft top lock switch connector T205 terminal 6 and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace harness.
4. CHECK SOFT TOP CONTROL UNIT OUTPUT SIGNAL
1. Connect soft top control unit connector.
2. Start engine.
3. Check voltage between soft top control unit connector B67 ter-
minal 31 and ground.
OK or NG
OK >> Replace Soft top lock switch (5th bow lock assembly in
storage lid).
NG >> Replace soft top control unit.31 (L) - 5 (L) : Continuity should exist.
31 (L) - Ground : Continuity should not exist.
PIIA7898E
6 (B) - Ground : Continuity should exist.
PIIA7899E
31 (L) - Ground : Approx. 5V
PIIA7897E
SOFT TOP
RF-47
C
D
E
F
G
H
J
K
L
MA
B
RF
Revision: 2006 November2007 350Z
2. CHECK 5TH BOW FULL CLOSE DETECTION SWITCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect soft top control unit and 5th bow switch assembly (at plate rail RR) connector.
3. Check continuity between soft top control unit connector B67
terminal 27 and 5th bow switch assembly connector B214 termi-
nal 2.
4. Check continuity between soft top control unit connector B67
terminal 27 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness.
3. CHECK 5TH BOW FULL CLOSE DETECTION SWITCH GROUND CIRCUIT
Check continuity between 5th bow switch assembly connector B214 terminal 3 and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace harness.
4. CHECK SOFT TOP CONTORL UNIT OUTPUT SIGNAL
1. Connect soft top control unit connector.
2. Start engine.
3. Check voltage between soft top control unit connector B67 ter-
minal 27 and ground.
OK or NG
OK >> Replace plate rail RR.
NG >> Replace soft top control unit.27 (GY) - 2 (W/G) : Continuity should exist.
27 (GY) - Ground : Continuity should not exist.
PIIA7903E
3 (B) - Ground : Continuity should exist.
PIIA7904E
27 (GY) - Ground : Approx. 5V
PIIA7902E
RF-48
SOFT TOP
Revision: 2006 November2007 350Z
Check 5th Bow Full Open Detection Switch (Open Operate)NIS0006R
1. CHECK 5TH BOW FULL OPEN DETECTION SWITCH SIGNAL
1. Start engine.
2. Operate soft top switch OPEN, check voltage between soft top control unit connector and ground.
OK or NG
OK >> Plate rail RR (5th bow full open switch) is OK.
NG >> GO TO 2.
2. CHECK 5TH BOW FULL OPEN DETECTION SWITCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect soft top control unit and 5th bow switch assembly (at plate rail RR) connector.
3. Check continuity between soft top control unit connector B67
terminal 26 and 5th bow switch assembly connector B214 termi-
nal 1.
4. Check continuity between soft top control unit connector B67
terminal 26 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness.
3. CHECK 5TH BOW FULL OPEN DETECTION SWITCH GROUND CIRCUIT
Check continuity between 5th bow switch assembly connector B214 terminal 3 and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace harness.
ConnectorTerminal (Wire color)
Roof conditionVoltage (V)
(Approx.)
(+) (-)
B67 26 (LG) Ground OP4 → OP5 5 → 0
PIIA7905E
26 (LG) - 1 (LG) : Continuity should exist.
26 (LG) - Ground : Continuity should not exist.
PIIA7906E
3 (B) - Ground : Continuity should exist.
PIIA7904E
RF-56
SOFT TOP
Revision: 2006 November2007 350Z
Check Roll Bar Interference Prevention Switch (Open Operate)NIS0006X
1. CHECK ROLL BAR INTERFERENCE PREVENTION SWITCH SIGNAL
1. Start engine.
2. Operate soft top switch OPEN, check voltage between soft top control unit connector and ground.
OK or NG
OK >> Soft top switch assembly 2 is OK.
NG >> GO TO 2.
2. CHECK ROLL BAR INTERFERENCE PREVENTION SWITCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect soft top control unit and soft top switch assembly 2 (roll bar interference prevention switch)
connector.
3. Check continuity between soft top control unit connector B67
terminal 22 and soft top switch assembly 2 connector B213 ter-
minal 3.
4. Check continuity between soft top control unit connector B67
terminal 22 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness.
3. CHECK ROLL BAR INTERFERENCE PREVENTION SWITCH GROUND CIRCUIT
Check continuity between soft top switch assembly 2 connector B213 terminal 1 and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace harness.
ConnectorTerminal (Wire color)
Roof conditionVoltage (V)
(Approx.)
(+) (-)
B67 22 (W/R) Ground OP8 → OP9 5 → 0
PIIA7923E
22 (W/R) - 3 (W/R) : Continuity should exist.
22 (W/R) - Ground : Continuity should not exist.
PIIA7924E
1 (B) - Ground : Continuity should exist.
PIIA7925E
SOFT TOP
RF-57
C
D
E
F
G
H
J
K
L
MA
B
RF
Revision: 2006 November2007 350Z
4. CHECK SOFT TOP CONTROL UNIT OUTPUT SIGNAL
1. Connect soft top control unit connector.
2. Start engine.
3. Check voltage between soft top control unit connector B67 ter-
minal 22 and ground.
OK or NG
OK >> Replace soft top switch assembly 2.
NG >> Replace soft top control unit.
Check Body Interference Prevention Switch (Open Operate)NIS0006Y
1. CHECK BODY INTERFERENCE PREVENTION SWITCH
1. Start engine.
2. Operate soft top switch OPEN, check voltage between soft top control unit connector and ground.
OK or NG
OK >> Soft top switch assembly 1 is OK.
NG >> GO TO 2.
2. CHECK BODY INTERFERENCE PREVENTION SWITCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect soft top control unit and soft top switch assembly 1 (body interference prevention switch) con-
nector.
3. Check continuity between soft top control unit connector B67
terminal 32 and soft top switch assembly 1 connector B212 ter-
minal 2.
4. Check continuity between soft top control unit connector B67
terminal 32 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness.22 (W/R) - Ground : Approx. 5V
PIIA7923E
ConnectorTerminal (Wire color)
Roof conditionVoltage (V)
(Approx.)
(+) (-)
B67 32 (W) Ground OP10 5 → 0
PIIA7926E
32 (W) - 2 (W) : Continuity should exist.
32 (W) - Ground : Continuity should not exist.
PIIA7927E
RF-58
SOFT TOP
Revision: 2006 November2007 350Z
3. CHECK BODY INTERFERENCE PREVENTION SWITCH GROUND CIRCUIT
Check continuity between soft top switch assembly 1 connector B212 terminal 3 and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace harness.
4. CHECK SOFT TOP CONTROL UNIT OUTPUT SIGNAL
1. Connect soft top control unit connector.
2. Start engine.
3. Check voltage between soft top control unit connector B67 ter-
minal 32 and ground.
OK or NG
OK >> Replace soft top switch assembly 1.
NG >> Replace soft top control unit.
Check Roof Full Open Detection Switch (Open Operate)NIS0006Z
1. CHECK ROOF FULL OPEN DETECTION SWITCH SIGNAL
1. Start engine.
2. Operate soft top switch OPEN, check voltage between soft top control unit connector and ground.
OK or NG
OK >> Soft top switch assembly 1 (roof full open detection
switch) is OK.
NG >> GO TO 2.3 (B) - Ground : Continuity should exist.
PIIA7928E
32 (W) - Ground : Approx. 5V
PIIA7926E
ConnectorTerminal (Wire color)
Roof conditionVoltage (V)
(Approx.)
(+) (-)
B67 21 (W/L) Ground OP10 → OP11 5 → 0
PIIA7929E