SRS -Troubleshooting52B-32
Code No.42 Power supply circuit system (fuse No.3
circuit)Possible Cause
This code is output when the voltage between terminal IG1(SRS-ECU, terminal
No.13) and earth has been below the standard value for 5 seconds.
However, code No.42 is automatically erased and SRS warning lamp goes out
when a normal operation is resumed.If code No.41 and 42 are output at the
same time, check the battery first since the battery voltage may have decreased.DHarness or connector fault
DSRS-ECU inoperable
OK
Check the other circuits using the general
fuse No.3. (See the Electrical Wiring
Diagram.)
NGOK
NG
NG
NG
Check connector:C-21, C-213, C-210
Check the trouble
symptoms.Correct
Check the harness between the SRS-ECU and the ignition
switch IG
1, and repair if necessary.
NG
Fuse disconnection
Fuse disconnection
OK
Replace the SRS-ECU.
switch IG
1
>Measure at the SRS-ECU connector C - 21.
DDisconnect the SRS-ECU connector C-21 and measure at
the harness side.
DConnect the negative ( - ) terminal of the battery
DIgnition switch: ON
DVoltage between terminal 13 and body earth
Caution
Do not directly insert a probe or other devices at the
front of the connector to avoid a possible decrease in
the contact pressure.
OK:9 V or more
OK
Check the harness between the SRS-ECU and junction block,
and repair if necessary.
block>
Measure at the C-21 SRS-ECU connector.
DDisconnect the SRS-ECU connector C-21 and measure at
the harness side.
DContinuity check between terminal 13 and body earth
Caution
Do not directly insert a probe or other devices at the
front of the connector to avoid a possible decrease in
the contact pressure.
OK:No continuity
Replace the SRS-ECU.Fuse is normal
Check the junction block general fuse No.3.
Check when fuse disconnects
DReplace the fuse.
DTurn the ignition switch to the ON position and then turn it
to the OFF position after one minute or more has passed.
Check the fuse.
block>
Measure at the junction block connector C-213.
DDisconnect the junction block connector C-213 and
measure at the harness side.
DContinuity check between terminal 7 and body earth
Caution
Do not directly insert a probe or other devices at the
front of the connector to avoid a possible decrease in
the contact pressure.
OK:No continuityConnector C-21
Connector C-213
Connector C-21
HEATER, AIR CONDITIONER AND VENTILATION-Evaporator, Air Thermo Sensor55-35
AB"EVAPORATOR REMOVAL
1. When removing the evaporator, cut and fold back the
dashboard pad as in the diagram. (The thickness of the
pad interferes with the removal of the evaporator.)
2. Remove the evaporator.
Caution:
Do not cut the upper side of the pad.
INSTALLATION SERVICE POINTS
"AAEVAPORATOR INSTALLATION
After installing the evaporator, glue the cut dashboard panel
pad with an adhesive agent.
INSPECTION
Air thermo sensor inspection
Measure the resistance between connector terminals 4 and
5 under at least two different temperatures. The resistance
values should generally match those in the graph.
NOTE
The temperature at the check should not exceed the range
in the graph.
Blower unit
Dashboard pad
Resistance
(kΩ)
Temperature(_C) 20
15
10
5
0
-10 0 1040
30
20
25