6A – 38 ENGINE MECHANICAL
6. Front propeller shaft (for 4x4 model)
Remove the spline yoke flange bolt at the transfer output
shaft.
Do not allow the spline yoke to fall away from the front
propeller shaft.
If the spline yoke should fall away from the front propeller
shaft, align the setting marks on the spline yoke and the
propeller shaft to reassemble the two marks. The setting
marks are punched circles approx. 3mm (0.12 in) in
diameter.
7. Clutch slave cylinder (for M/T model)
8. ATF pipe (for A/T model)
9 Shift control cable (for A/T model)
10. Transmission sensor harness Remove the vehicle speed sensor connector, inhibitor
switch connector (A/T), ATF temperature sensor
connector, back up light switch connector (M/T) from
transmission.
11. Breather hose (for A/T model)
12. Transmission shift lever (for M/T model) Remove the shift lever from the floor.
13. Transfer shift lever (for 4x4 model) Remove the shift lever from the floor.
14. Transmission member 1) Support the transmission with the transmission jack.
2) Remove the transmission member mounting bolts fixing the transmission member to the chassis frame.
15. Torque converter bolt (for A/T model) 1) Remove the under cover under the torque converter housing.
2) Rotate the flywheel by using tire lever or some other tool, and then remove the torque converter bolts.
16. Transmission coupling bolt 1) Support the engine with the garage jack.
2) Use the jack to slightly lower the transmission.
3) Remove the transmission coupling bolts.
17. Transmission (and transfer) Separate the transmission (and transfer) from the
engine.Take care not to damage the transmission, the
engine, and their related parts..
F06R300007
P1010025
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 846 of 6020

ENGINE MECHANICAL 6A – 41
Coolant Replenishment
Warning:
When the coolant is heated to a high temperature, be
sure not to loosen or remove the rediator cap.
Otherwise you might get scalded by hot vapor or
boiling water.
To open the radiator cap, put a piece of thick cloth on
the cap and loosen the cap slowly to reduce the
pressure when the coolant has become cooler.
1. Open rediator cap pour coolant up to filler neck
2. Pour coolant into reservoir tank up to "MAX" line
3. Tighten radiator cap and start the engine. After idling for 2 to 3 minutes, stop the engine and reopen radiator
cap. If the water level is lower, replenish.
4. After replenish the coolant tighten radiator cap, warm up the engine at about 2000 rpm. Set heater
adjustment to the highest temperature position, and let
the coolant circulate also into heater water system.
5. Check to see the thermometer, continuously idling 5 minutes and stop the engine.
6. W hen the engine has been cooled, check filler neck for water level and replenish if required. Should extreme
shortage of coolant is found, check the coolant system
and reservoir tank hose for leakage.
7. Pour coolant into the reservoir tank up to "MAX" line.
Coolant Capacity lit (US/UK gal)
4JA1 / TC 9.4 (2.5 / 2.1)
4JH1TC M/T: 10.1 (2.7 / 2.2)
A/T: 10.0 (2.6 / 2.2)
Engine Warm-Up
After completing the required maintenance procedures,
start the engine and allow it to idle until it is warm.
Check the following:
1. Engine idling speed.
2. Engine noise level.
3. Engine lubricating system and cooling system. Carefully check for oil and coolant leakage.
4. Clutch engagement.
5. Transmission operation.
6. Indicator warning light operation.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 848 of 6020
ENGINE MECHANICAL 6A – 43
ENGINE OVERHAUL
REMOVAL
EXTERNAL PARTS
RTW 36AMF000401
Removal Steps
1. Clutch Assembly or Flex Plate
2. Intake Pipe and Throttle Body
3-1. EGR Pipe
3-2. EGR cooler (EURO III model only)
4. EGR Valve
5. Oil Level Gauge
6. Fuel Filter Assembly (Except EURO III)
7. Fuel Filter Bracket (Except EURO III)
8. Fuel Injection Pipe with Clip
9. Power Steering Oil Pump Bracket
10. Intake Manifold
11. Engine Mounting Bracket and Foot
12. Injection Pump Cover
13. Injection Pump
14. Starter Motor
15. Oil Pressure W arning Switch
16. Fuel Leak Off Pipe
17. Oil Cooler W ater Pipe
18. Cooling Fan Pulley
19. Heat Protector
20. Catalytic Converter
21. Turbocharger
22. Compressor Bracket
23. Vacuum Pump Oil Return Hose
24. Generator and Adjusting Plate
25. W ater Inlet Pipe
26. Generator Bracket
27. Oil Cooler with Oil Filter
28. Exhaust Manifold
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 849 of 6020
6A – 44 ENGINE MECHANICAL
Removal
1. Clutch Assembly or Flex Plate
Remove the clutch assembly or the flex plate.
4JA1L RTW 46ASH000801
2. Intake Pipe and Throttle Body (4JA1TC/4JH1TC only)
1) Loosen hose clamp between turbocharger and intake duct.
2) Remove the rubber hose.
3) Remove the intake pipe and the throttle body. (4JA1TC/4JH1TC only)
RTW 36ASH000201
4JA1L
025R100008
3-1. EGR Pipe
1) Remove two bolts from the exhaust manifold.
2) Remove two nuts from the EGR valve adapter.
3) Remove the EGR pipe with gaskets.
RTW 36ASH000301
3-2. EGR Cooler (EURO III model only)
4JA1TC/4JH1TC
4JH1TC
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 891 of 6020

6A – 86 ENGINE MECHANICAL
Ring Gear Replacement
Ring Gear Removal
Strike around the edges of the ring gear with a hammer and
chisel to remove it.
Ring Gear Installation
1. Heat the ring gear evenly with a gas burner to invite thermal expansion.
Do not allow the temperature of the gas burner to exceed
200 °C (390 °F).
2. Install the ring gear when it is sufficiently heated. The ring gear must be installed with the chamfer facing the
clutch.
PISTON
Piston Grade Selection and Cylinder Bore
Measurement
Refer to the Section "Cylinder Body", Item "Cylinder Liner Bore
Measurement" for details on piston grade selection and
cylinder liner bore measurement.
Piston Ring Gap
1. Insert the piston ring horizontally (in the position it would assume if it were installed to the piston) into the cylinder
liner.
2. Push the piston ring into the cylinder bore until it reaches the measuring point 1 or 2 where the cylinder liner bore is
the smallest.
Do not allow the piston ring to slant to one side or the
other. It must be perfectly horizontal.
Measuring Point 1 10 mm (0.4 in) or
Measuring Point 2 120 mm (4.7 in)
020LX008
020LX009
015LX023
015RY00020
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 923 of 6020
6A – 118 ENGINE MECHANICAL
INSTALLATION
EXTERNAL PARTS
RTW 36AMF000701
Installation Steps
1.
Exhaust Manifold 18. Engine Mounting Bracket and
2.
Oil Cooler with Oil Filter Foot
3. Generator Bracket 19. Intake Manifold
4. W ater Inlet Pipe 20. Power Steering Oil Pump
5.
Generator and Adjusting Plate Bracket
6.
Vacuum Pump Oil Return Hose 21. Fuel Injection Pipe with Clip
7.
Compressor Bracket 22. Fuel Filter Bracket (Except
EURO III)
8. Turbocharger 23. Fuel Filter Assembly (Except
EURO III)
9. Catalytic Converter 24. Oil Level Gauge
10. Heat Protector 25. EGR Valve
11. Cooling Fan Pulley 26-1. EGR Pipe
12. Oil Cooler W ater Pipe 26-2. EGR Cooler (EURO III model
only)
13. Fuel Leak Off Pipe 27. Intake Pipe and Throttle Body
(4JA1TC/4JH1TC only)
14. Oil Pressure W arning Switch 28. Clutch Assembly or Flex Plate
15. Starter Motor
16. Injection Pump
17. Injection Pump Cover
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 930 of 6020

ENGINE MECHANICAL 6A – 125
25. EGR Valve
Install the EGR valve assembly to the intake minifold with
the two gasket.
Tighten the four nuts to the specified torque.
Nut Tolque N·m(kg·m/Ib ft)
31 (3.1/23)
Connector the vacuum hose.
025R100008
RTW 36ASH000301
26-1. EGR Pipe
Install the EGR valve adapter with the gasket to the EGR
valve assembly and install the EGR pipe with the gasket.
Tighten fixing bolts and nuts to the specified torque.
EGR Valve Adapter Bolts N·m(kg·m/Ib ft)
24 (2.4/17)
EGR Pipe Bolts and Nuts N·m(kg·m/Ib ft)
27 (2.7/20)
RTW 48ASH001801
26-2. EGR Cooler (EURO III model only)
Install the EGR valve adapter with the gasket to the EGR
valve assembly and install the EGR pipe with the gasket.
Tighten fixing bolts and nuts to the specified torque.
EGR Valve Adapter Bolts N·m(kg·m/Ib ft)
24 (2.4/17)
EGR Pipe Bolts and Nuts N·m(kg·m/Ib ft)
27 (2.7/20)
27. Intake Pipe and Throttle Body (4JA1TC/4JH1TC only) Install the throttle body with the gasket to the intake
manifold and install the intake duct with the gasket.
Tighten the two bolts and the two nuts to the specified
torque.
Throttle Body and Intake Duct N·m(kg·m/Ib ft)
Bolt 19 (1.9/14)
Nut 24 (2.4/17)
RTW 36ASH000201
28. Clutch Assembly or Flex Plate
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 946 of 6020
6B – 2 ENGINE COOLING
PAGE
Engine coolant change ............................................................................................. 6B - 19
Fan Clutch with Cooling Fan ........................................................................................ 6B - 20
Inspection and Repair ............................................................................................... 6B - 20
Special Tools ............................................................................................................. 6B - 20
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007